Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 9 of 9 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 390.430 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9
390.43
0
 
Total
390.43
0.00
 
1 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division 1962/BWD 25/04/2023 0 Resource Division 10.04 0.00 0
2 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division 2155/BWD 10/05/2023 0 Resource Division 10.94 0.00 0
3 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New New service connection charges for Bara Baharkuli PWSS TW-2 BP-2023-24-219 10/11/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.15 0.00 0
4 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New BARA BAHARKULI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Kalna-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 2597/BWD 02/06/2023 365 INVENT ENGINEERS CO. OPERATIVE SOCIETY LTD. 236.30 0.00 65
5 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Material Requisition To Resource Division 328/BWD 24/01/2024 0 Resource Division 24.62 0.00 0
6 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Quotation for new electric service connection at Bara Baharkhuli PH NO.-1 BP-2023-24-268 11/12/2023 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0
7 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Restoration work of Barabaharkuli to Badla village road with a bridge over river Behula road from 0.0 km to 1.3 km and 1.8 km to 2.2 km damadged due to laying of underground water pipeline by PHE with box cutting and jhama with moorum consolidation under kalna highway subdivision of Burdwan south highway division ,P.W(Roads)dte ,during the year 2023-2024 825/JJM 13/09/2024 0 EXECUTIVE ENGINEER BURDWAN SOUTH HIGHWAY DIVISION P.W. (ROADS) DTE. 5.36 0.00 0
8 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at BARABAHARKULI Water Supply Scheme [Block - KALNA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer 4162/CMD 29/08/2023 733 J.S. CONSTRUCTION. 21.33 0.00 90
9 PURBA BARDHAMAN Burdwan Division BARA BAHARKULI PIPED WATER SUPPLY SCHEME. , SM/15581 New Pipeline laying by HDD method and different types of balance works in connection with different Augmentation & New Scheme [(SM/ 08103), (SM/13413), (SM/15587), (SM/16035), (SM/16287), (SM/16029), (SM/15581), (SM/14437), (SM/16028), (SM/16036) & (SM/14425)] within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer 849/BWD 05/03/2025 180 S.P. CONSTRUCTION 72.82 0.00 0
Total 390.430.00 
Showing 1 to 9 of 9 entries