Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 16 of 16 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16 568.049.62 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16
568.04
9.62
 
Total
568.04
9.62
 
1 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 3 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER 838/CMD 20/02/2023 30 C.M. ENTERPRISE 9.62 9.62 100
2 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 4 at Joykrishnapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER 839/CMD 20/02/2023 30 MS MANABESH ROY 9.61 0.00 100
3 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division 4288/BWD 29/09/2023 0 Resource Division 0.55 0.00 0
4 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division 2197/BWD 12/05/2023 0 Resource Division 12.33 0.00 0
5 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division 4037/BWD 08/09/2023 0 Resource Division 37.20 0.00 0
6 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Laying of Rising main in between Tube Well and Distribution Line for Shimulia Village in Galsi -II Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER DURGAPUR SUB-DIVISION PHE DTE 621/DSD 05/08/2024 30 MAA MAHAMAYA CONSTRUCTION 1.56 0.00 100
7 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR JOYKRISHNAPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 1015/KSD 07/08/2024 15 DEL DELTA CONSTRUCTION 0.66 0.00 100
8 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Acceptance cum Formal Work order for Laying of interconnection for PH NO-3 (At Taranagar) Pipe Line for under JOYKRISHNAPUR PWSS, Galsi-II Block, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II Contractual Junior Engineer_3 1410/DWSD 01/10/2024 60 MUNSHI JAVEDUR JAMAN 0.43 0.00 100
9 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New New service connection charges for Joykrishnapur PWSS TW-1 BP-2023-24-390 17/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.39 0.00 0
10 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New NEW SERVICE CONNECTION FOR JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME. BP-2023-24-592 04/03/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0
11 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur PWSS PH-2 BP-2023-24-333 03/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 12.33 0.00 0
12 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Quotation for new service connection at Joykrishnapur W/S Scheme for PH No-1 BP-2023-24-332 03/01/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 8.57 0.00 0
13 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to GHUNI & JOYKRISHNAPUR Piped Water Supply Scheme under Purbasthali II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 3510/BWD 10/08/2023 598 BKB INFRA PROJECTS PRIVATE LIMITED 316.24 0.00 20
14 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at JOYKRISHNAPUR Water Supply Scheme [ Block- PURBASTHALI-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER 4143/CMD 29/08/2023 646 JYOTY SOLAR POWER. 26.98 0.00 45
15 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Construction of 350cum OHR & Other Allied Works in connection with Augmentation of (SM/07803), (SM/09410), (SM/16304), (SM/15172) & (SM/14020) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 220/BWD 10/01/2025 270 R.K. MANDAL& CO. 125.00 0.00 1
16 PURBA BARDHAMAN Durgapur W/S Division JOYKRISHNAPUR PIPED WATER SUPPLY SCHEME , SM/15172 New Material Requisition To Resource Division 478/DWSD 17/03/2025 0 Resource Division 0.14 0.00 0
Total 568.049.62 
Showing 1 to 16 of 16 entries