Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 15 of 15 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 259.21217 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15
259.21
217
 
Total
259.21
217.00
 
1 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Design, Preparation & Submission of DPR as per existing route survey data for Augmentation of TILASAN Piped Water Supply Scheme under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Shreya Das, Junior Engineer 2693/MD 09/09/2021 7 RADIANT 1.25 1.25 1
2 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT TILASAN, HABIBPUR BLOCK, MALDA DISTRICT UNDER CDD, PHE DTE. 347/CMSD-I 25/07/2022 15 CHANDA ENTERPRISE 4.43 4.43 0
3 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation SUPPLY & DELIVERY OF CONSUMBLES WITH OTHER WORKS AT SITEFOR CONSTRUCTION OF TUBE WELL AT JAGJIBANPUR, HABIBPUR BLOCK, MALDA DISTRICT UNDER CDD, PHE DTE. 346/CMSD-I 25/07/2022 15 CHANDA ENTERPRISE 1.40 1.40 0
4 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Laying of Rising Main including connection of Pump No-1 & Pump No 2 and by pass arrangement for TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Shreya Das, Junior Engineer 1307/MD 01/06/2022 30 M/S EHAN ENTERPRISE 4.43 4.43 1
5 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division 1587/MD 28/03/2023 0 Resource Division 0.41 0.00 0
6 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Dismentling of Concrete road and Construction the same from Head Work site to 2nd Tube Well Site of TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Division, P.H.E. Dte. In the district of Malda. Mr. Arnab Giri, Assistant Engineer 1443/MD 29/03/2023 30 M/S EHAN ENTERPRISE 3.15 3.15 100
7 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Dismantling of concrete road and Construction the same at different places of road connecting to LDS of TILASAN Piped Water Supply Scheme at Habibpur Dev. Block, under Malda Division, P.H.E. Dte. in the District of Mal Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer 2177/MD 07/06/2023 30 UTTAM KUMAR GHOSH 21.68 21.68 100
8 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Providing Functional House hold Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under Command area of Augmentation of TILASAN Piped Water Supply Scheme at Habibpur Dev. Block, under Mal Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer 2178//MD 07/06/2023 30 UTTAM KUMAR GHOSH 12.19 12.19 100
9 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division 1107/MD 17/05/2022 0 Resource Division 16.55 0.00 0
10 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division 1461/MD 22/06/2022 0 Resource Division 6.78 0.00 0
11 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Hiring of Diesel Driven Motor Cab (BS-IV & Above) having contract carriage permit along with driver for the office of the Calcutta Mecha nical Sub Division-I(D), CDD, P.H.Engineering Dte. For Supervision of JJM related works. Driller In Charge Junior Engineer 13/CMSD-I(D) 15/01/2024 198 AJAY KUMAR 0.66 0.00 15
12 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of Augmentation for T/W no.- I of Tilason Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/009047) Assistant Engineer - II Junior Engineer-03 2226/MLMD 18/07/2023 719 SUBRATA KUMAR DAS. 10.08 0.00 30
13 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Formal work order for Augmentation of TILASAN Piped water supply scheme for the work of Geotechnical Study,construction of 200 Cum RCC OHR,Laying Distribution of pipe line and providing Functional Household Tap connection (FHTC) within Habibpur Block und Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Mukaddar Parvage, Junior Engineer,Shreya Das, Junior Engineer 996/MD 22/04/2022 365 UTTAM KUMAR GHOSH 163.53 163.37 100
14 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of Augmentation for T/W no.- II of Tilason Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/009047) Assistant Engineer - II Junior Engineer-03 2227/MLMD 18/07/2023 542 JOY ENTERPRISE. 7.57 0.00 25
15 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) and Laying of 90 mm dia (OD) uPVC Pipeline under command area of AUGMENTATION OF TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer 1262/MD 15/03/2024 254 SATTWIK CONSTRUCTION 5.10 5.10 100
Total 259.21217.00 
Showing 1 to 15 of 15 entries