Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 9 of 9 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 818.410 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9
818.41
0
 
Total
818.41
0.00
 
1 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. III of Hili, Hili C.C.C in the district of Dakshin Dinajpur Under Malda Mechanical Division PHE Dte. Assistant Engineer - I Junior Engineer-01 4003295116 20/12/2023 90 W.B.S.E.D.C.LTD 3.74 0.00 100
2 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Material Requisition To Resource Division 3495/BD 03/03/2023 0 Resource Division 106.52 0.00 0
3 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I & II, making compound lighting arrangement at T/W no. I of Augmentation of Hili Water Supply Scheme in the District of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/015982) Assistant Engineer - I Junior Engineer-01 2550/MLMD 04/08/2023 870 MANIK CHANDRA SAHA. 28.77 0.00 77
4 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Erection of Permanent Type village wise Scheme Information Board at different Piped Water Supply Schemes under JJM as per departmental design and drawing for Balurghat, Hili, Tapan & Kumarganj Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer HQ Junior Engineer 3 2069/BD 16/12/2023 45 M.A. ENTERPRISE 12.10 0.00 98
5 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Dismantling of existing dilapidated 340.50 Cum capacity OHR for facilitating the construction of Proposed OHR under JJM at Head Work Site of Hili Piped Water Supply Scheme at Hili Block, in the District of Dakshin Dinajpur, under Balurghat Division, P.H. Engineering Dte. Assistant Engineer HQ Junior Engineer Hili 1633/BD 10/10/2023 45 M/S. S. CONSTRUCTION 7.24 0.00 48
6 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Material Requisition To Resource Division 37/BD 09/01/2024 0 Resource Division 17.03 0.00 0
7 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III of Augmentation of Hili Water Supply Scheme in the District of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. (TSM/015982) Assistant Engineer - I Junior Engineer-01 2551/MLMD 04/08/2023 120 SUBRATA KUMAR DAS. 11.85 0.00 80
8 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Sinking of tubewell, Laying of Rising Main & Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing & Construction of Pump House & Blower Room, Installation of IEP, Construction of Boundary Wall, Construction & Restoration of CC Road for Augmentation of Hili Piped Water Supply Scheme at Hili Block in the District of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer HQ Junior Engineer Hili 1026/BD 01/08/2023 884 NILKAMAL BASAK 630.03 0.00 35
9 DAKSHIN DINAJPUR Balurghat Division Augmentation of Ground Water Based Hili Piped Water Supply Scheme. , SM/13831 Augmentation Erection of Permanent Type Land Demarcation Board within the Premises of different PWSS at Hili & Tapan Block in the Disitrict of Dakshin Dinajpur under Balurghat Division, PHE Dte. Assistant Engineer HQ Junior Engineer 1 HQ 1942/BD 27/09/2024 20 M/S. A.D. ENTERPRISE 1.13 0.00 100
Total 818.410.00 