Sl. No. | District
As per Census (2011)
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
SM Code
Sanctioned Scheme Code Retrofitting/ Augmentation Schemes under this parent Scheme as per PHED-MIS
|
Child SM Code
Sanctioned Scheme Code of the Child Scheme as per PHED-MIS
|
Work Order Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Agency
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Order Issue Date
Date of Issuance of the Work Order as per PHED-MIS
|
Work Order Completion Date
Date of Completion as per Days of Completion mentioned in the PHED-MIS
|
---|---|---|---|---|---|---|---|---|
605 | ||||||||
1 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 2870/MD | MIDNAPUR PIPE CONCERN | 10-08-2023 | 24-10-2023 |
2 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | 5257/MD | CREATION CONSTRUCTION | 21-11-2023 | 20-01-2024 | |
3 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 3100/MD | M/S. D.K.H.CONSTRUCTION | 25-08-2023 | 08-11-2023 |
4 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | 263/AE/MSSD | ARNAB PATRA | 08-06-2022 | 28-06-2022 | |
5 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 2871/MD | MIDNAPUR PIPE CONCERN | 10-08-2023 | 09-10-2023 |
6 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 3905/MD | DIPAK KUMAR BAKLY | 27-09-2023 | 26-11-2023 |
7 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 649/MD | SUBRATA DAS | 07-03-2024 | 03-09-2024 |
8 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 218/MD | ASIS KUMAR SARANGI | 31-01-2024 | 31-03-2024 |
9 | PASCHIM MEDINIPUR | 32 PWSS & 59 Stand Alone PWSS system for Drought Like Situation Prone Blocks of Paschim Medinipur District (Mid-Term Plan under Master Plan) | SM/06368 | SM/18486 | 141/MD | MIDNAPUR PIPE CONCERN | 18-01-2024 | 18-03-2024 |
10 | PASCHIM MEDINIPUR | ABHAYA AND ADJOINING MOUJAS PWSS | SM/14689 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
11 | PASCHIM MEDINIPUR | AGRA & ADJOINING MOUJAS PWSS | SM/13052 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
12 | PASCHIM MEDINIPUR | AKANDA AND ADJOINING MOUJAS PWSS | SM/13176 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
13 | PASCHIM MEDINIPUR | AMJOR AND ADJOINING MOUJAS PWSS | SM/13707 | 1878/MD | ASHIM KUMAR DEY | 09-09-2022 | 08-03-2023 | |
14 | PASCHIM MEDINIPUR | Amjor Piped Water Supply Scheme. | SM/10318 | 1878/MD | ASHIM KUMAR DEY | 09-09-2022 | 08-03-2023 | |
15 | PASCHIM MEDINIPUR | Amjor Piped Water Supply Scheme. | SM/10318 | 2674/MD | ASHIM KUMAR DEY | 30-12-2022 | 28-02-2023 | |
16 | PASCHIM MEDINIPUR | AMLA BANI AND ITS ADJOINING MOUZAS PWSS | SM/18584 | 3843/MD | M/S. A.R. ENTERPRISE. | 21-09-2023 | 19-03-2024 | |
17 | PASCHIM MEDINIPUR | AMLAGORA WATER SUPPLY SCHEME | SM/00750 | SM/09923 | 1959/MD | BANERJEE CONSTRUCTION | 20-09-2022 | 19-03-2023 |
18 | PASCHIM MEDINIPUR | AMLASULI AND ADJOINING MOUJAS PWSS | SM/14989 | 2675/MD | EVEREST CONSULTANT SERVICES | 26-07-2023 | 09-09-2023 | |
19 | PASCHIM MEDINIPUR | AMSOL AND ADJOINING MOUJAS PWSS | SM/13179 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
20 | PASCHIM MEDINIPUR | Antla Piped Water Supply Scheme. | SM/09991 | 2255/MD | MASUM ALI KHAN | 28-12-2021 | 26-06-2022 | |
21 | PASCHIM MEDINIPUR | ANTRI AND ADJOINING MOUJAS PWSS | SM/13636 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
22 | PASCHIM MEDINIPUR | ASHARI AND IT'S ADJOINING MOUJAS PWSS | SM/12198 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
23 | PASCHIM MEDINIPUR | ASTI AND ADJOINING MOUJAS PWSS | SM/13655 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
24 | PASCHIM MEDINIPUR | BABALPUR AND ADJOINING MOUJAS PWSS | SM/13754 | 3047/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 23-08-2023 | 19-04-2024 | |
25 | PASCHIM MEDINIPUR | BAGDOBA AND ADJOINING MOUJAS PWSS | SM/14690 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
26 | PASCHIM MEDINIPUR | BAHURUPA AND ADJOINING MOUJAS PWSS | SM/13755 | 3047/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 23-08-2023 | 19-04-2024 | |
27 | PASCHIM MEDINIPUR | BAITA WATER SUPPLY SCHEME | SM/00781 | 2018/MD | M/S. A.R. ENTERPRISE. | 03-12-2021 | 01-02-2022 | |
28 | PASCHIM MEDINIPUR | Bajpara Piped Water Supply Scheme | SM/05982 | 2005/MD | M/S. CARE | 01-12-2021 | 31-12-2021 | |
29 | PASCHIM MEDINIPUR | BALADAGHATA AND ADJOINING MOUJAS PWSS | SM/12990 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
30 | PASCHIM MEDINIPUR | Balarampur Piped Water Supply Scheme | SM/05482 | 2185/MD | S.T. ENTERPRISE | 17-12-2021 | 16-01-2022 | |
31 | PASCHIM MEDINIPUR | Balarampur Piped Water Supply Scheme | SM/05482 | SM/09706 | 2269/MD | SUBRATA DAS | 09-11-2022 | 30-11-2022 |
32 | PASCHIM MEDINIPUR | BAMANBIRUA AND ADJOINING MOUJAS PWSS | SM/12991 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
33 | PASCHIM MEDINIPUR | BAMANDA AND ADJOINING MOUJAS PWSS | SM/12993 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
34 | PASCHIM MEDINIPUR | BANKIBANDH AND ADJOINING MOUJAS PWSS | SM/13065 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
35 | PASCHIM MEDINIPUR | BAR JHIKURIA AND ITS ADJOINING MOUJAS PWSS | SM/12200 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
36 | PASCHIM MEDINIPUR | BARA MAHANPUR AND ADJOINING MOUJAS PWSS | SM/14941 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
37 | PASCHIM MEDINIPUR | BARAGARH PWSS, BLOCK - DEBRA, PASCHIM MEDINIPUR | SM/12201 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
38 | PASCHIM MEDINIPUR | BARAKADRA AND ADJOINING MOUJAS PWSS | SM/14991 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
39 | PASCHIM MEDINIPUR | BARAKALANKI AND ADJOINING MOUJAS PWSS | SM/13067 | 3047/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 23-08-2023 | 19-04-2024 | |
40 | PASCHIM MEDINIPUR | BARAKEUNDI AND ADJOINING MOUJAS PWSS | SM/13002 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
41 | PASCHIM MEDINIPUR | BARANAGARA AND ADJOINING MOUJAS PWSS | SM/13003 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
42 | PASCHIM MEDINIPUR | BARBASI & ITS ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME. | SM/18507 | 3101/MD | GOBINDA MAITY | 25-08-2023 | 22-03-2024 | |
43 | PASCHIM MEDINIPUR | BARDIHA AND ADJOINING MOUJAS PWSS | SM/14692 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
44 | PASCHIM MEDINIPUR | Basantapur Piped Water Supply Scheme | SM/06056 | 417/MD | MASUM ALI KHAN | 26-02-2021 | 07-04-2021 | |
45 | PASCHIM MEDINIPUR | Basantapur Piped Water Supply Scheme | SM/06056 | SM/08207 | 1241/MD | MASUM ALI KHAN | 20-06-2022 | 11-07-2022 |
46 | PASCHIM MEDINIPUR | BELDA WATER SUPPLY SCHEME | SM/00460 | SM/11898 | 1020/MD | DULAL CHANDRA DAS | 12-04-2023 | 09-10-2023 |
47 | PASCHIM MEDINIPUR | BELDA WATER SUPPLY SCHEME | SM/00460 | 501/AE/KSD | NIMAI LAL GURIA | 03-08-2022 | 02-09-2022 | |
48 | PASCHIM MEDINIPUR | BELDA WATER SUPPLY SCHEME | SM/00460 | SM/11898 | 2188/MD | BANERJEE CONSTRUCTION | 01-11-2022 | 30-04-2023 |
49 | PASCHIM MEDINIPUR | BENACHAPRA AND ADJOINING MOUJAS PWSS | SM/14992 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
50 | PASCHIM MEDINIPUR | BENADIHA AND ADJOINING MOUJAS PWSS | SM/14993 | 2524/MD | NABA KUMAR BHUNIA | 18-07-2023 | 13-02-2024 | |
51 | PASCHIM MEDINIPUR | BENUCHA AND ADJOINING MOUJAS PWSS | SM/13069 | 1429/MD | AJITESH ACHARJEE | 04-05-2023 | 03-07-2023 | |
52 | PASCHIM MEDINIPUR | BENYA AND IT'S ADJOINING MOUJAS PWSS. | SM/14721 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
53 | PASCHIM MEDINIPUR | Bhabaninagar Piped Water Supply Scheme | SM/06055 | SM/09701 | 939/MD | GOBINDA MAITY | 04-04-2023 | 03-06-2023 |
54 | PASCHIM MEDINIPUR | Bhabaninagar Piped Water Supply Scheme | SM/06055 | 2017/MD | MASUM ALI KHAN | 03-12-2021 | 01-02-2022 | |
55 | PASCHIM MEDINIPUR | Bhikni Nischintapur and adjoining Mouzas Piped Water Supply Scheme | SM/02854 | SM/06911 | 1458/MD | SAI TUBE CO. | 26-11-2020 | 25-05-2021 |
56 | PASCHIM MEDINIPUR | Bhikni Nischintapur and adjoining Mouzas Piped Water Supply Scheme | SM/02854 | SM/06911 | 1458/MD | SAI TUBE CO. | 26-11-2020 | 25-05-2021 |
57 | PASCHIM MEDINIPUR | Bhikni Nischintapur and adjoining Mouzas Piped Water Supply Scheme | SM/02854 | SM/06911 | 685/MD | SAI TUBE CO. | 03-05-2021 | 28-05-2021 |
58 | PASCHIM MEDINIPUR | Bhimpur w/s scheme | SM/02709 | SM/16949 | 2489/MD | DIPAK KUMAR BAKLY | 17-07-2023 | 16-08-2023 |
59 | PASCHIM MEDINIPUR | Bhimpur w/s scheme | SM/02709 | SM/08675 | 234/MD | DIPAK KUMAR BAKLY | 08-02-2022 | 25-03-2022 |
60 | PASCHIM MEDINIPUR | BIRSINGHA WATER SUPPLY SCHEME | SM/00775 | SM/13823 | 2412/MD | DIPAK KUMAR BAKLY | 25-11-2022 | 09-01-2023 |
61 | PASCHIM MEDINIPUR | BIRSINGHA WATER SUPPLY SCHEME | SM/00775 | SM/13823 | 138/MD | DIPAK KUMAR BAKLY | 18-01-2024 | 03-03-2024 |
62 | PASCHIM MEDINIPUR | BIRSINGHA WATER SUPPLY SCHEME | SM/00775 | 410/MD | SAMIT PAL | 26-02-2021 | 13-03-2021 | |
63 | PASCHIM MEDINIPUR | BIRSINGPUR AND ADJOINING MOUJAS PWSS | SM/14994 | 2412/MD | DIPAK KUMAR BAKLY | 25-11-2022 | 09-01-2023 | |
64 | PASCHIM MEDINIPUR | BIRSINGPUR AND ADJOINING MOUJAS PWSS | SM/14994 | 138/MD | DIPAK KUMAR BAKLY | 18-01-2024 | 03-03-2024 | |
65 | PASCHIM MEDINIPUR | BISHNUPUR AND ADJOINING MOUJAS PWSS | SM/13006 | 310/MD | KISHORE GHOSH | 22-02-2021 | 03-04-2021 | |
66 | PASCHIM MEDINIPUR | BISHNUPUR AND ADJOINING MOUJAS PWSS | SM/13006 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
67 | PASCHIM MEDINIPUR | Borai Water Supply Scheme, Block - Mohanpur, Dist.- Paschim Medinipur. | SM/17398 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
68 | PASCHIM MEDINIPUR | BRINDABANPUR AND ITS ADJOINING MOJAS PWSS | SM/12384 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
69 | PASCHIM MEDINIPUR | BULANPUR AND ADJOINING MOUJAS PWSS | SM/14031 | 2676/MD | NIMAI HAZRA | 26-07-2023 | 09-09-2023 | |
70 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | SM/06919 | 1466/MD | BANERJEE CONSTRUCTION | 26-11-2020 | 25-05-2021 |
71 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | SM/06917 | 508/MD | SANKAR PRASAD MAITY | 27-02-2024 | 12-04-2024 |
72 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | SM/06919 | 307/MD | ASHOK BANERJEE | 22-02-2021 | 24-03-2021 |
73 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | 307/MD | ASHOK BANERJEE | 22-02-2021 | 24-03-2021 | |
74 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | 308/MD | ASHOK BANERJEE | 22-02-2021 | 08-04-2021 | |
75 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | SM/06919 | 308/MD | ASHOK BANERJEE | 22-02-2021 | 08-04-2021 |
76 | PASCHIM MEDINIPUR | Bural & adj. mouzas W/S Scheme | SM/03342 | SM/06917 | 1465/MD | BANERJEE CONSTRUCTION | 26-11-2020 | 25-05-2021 |
77 | PASCHIM MEDINIPUR | Chaita Piped Water Supply Scheme | SM/05299 | 96/AE/MSSD | AJITESH ACHARJEE | 23-02-2021 | 10-03-2021 | |
78 | PASCHIM MEDINIPUR | Chaita Piped Water Supply Scheme | SM/05299 | SM/08204 | 391/MD | PRADIP KUMAR SAHA | 25-02-2021 | 27-03-2021 |
79 | PASCHIM MEDINIPUR | Chaita Piped Water Supply Scheme | SM/05299 | SM/08204 | 280/AE/MSSD | AJITESH ACHARJEE | 15-06-2022 | 15-07-2022 |
80 | PASCHIM MEDINIPUR | Chaita Piped Water Supply Scheme | SM/05299 | 1477/MD | NUTAN BAZAR ENGINEER,S CO-OPERATIVE SOCIETY LTD. | 08-09-2021 | 23-09-2021 | |
81 | PASCHIM MEDINIPUR | Chaita Piped Water Supply Scheme | SM/05299 | 91/AE/MSSD | AJITESH ACHARJEE | 22-02-2021 | 09-03-2021 | |
82 | PASCHIM MEDINIPUR | CHAK BAJIT AND IT'S ADJOINING MOUJAS PWSS | SM/12410 | 5061/MD | ANIRUDDHA BAG | 26-10-2023 | 23-04-2024 | |
83 | PASCHIM MEDINIPUR | CHAK ISMAILPUR WATER SUPPLY SCHEME | SM/00436 | SM/13826 | 455/MD | M/S. D.K.H.CONSTRUCTION | 13-02-2023 | 12-08-2023 |
84 | PASCHIM MEDINIPUR | CHAK NARSINGHA AND IT'S ADJOINING MOUJAS PWSS | SM/12411 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
85 | PASCHIM MEDINIPUR | CHAK SULPAN AND IT'S ADJOINING MOUJAS PWSS | SM/12412 | 2145/MD | GOBINDA MAITY | 08-06-2023 | 04-01-2024 | |
86 | PASCHIM MEDINIPUR | CHAKABDULLA AND ITS ADJOINING MOUZAS PWSS | SM/14995 | 5063/MD | MIDNAPUR PIPE CONCERN | 26-10-2023 | 23-04-2024 | |
87 | PASCHIM MEDINIPUR | CHAKKESHI AND ITS ADJOINING MOUZAS PWSS | SM/16259 | 2525/MD | SUJATA CONSTRUCTION | 18-07-2023 | 14-01-2024 | |
88 | PASCHIM MEDINIPUR | CHANDABILA & ADJOINING MOUJAS PWSS | SM/13054 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
89 | PASCHIM MEDINIPUR | Chandipur Piped Water Supply Scheme | SM/05978 | 2004/MD | M/S. EL-CON | 01-12-2021 | 15-01-2022 | |
90 | PASCHIM MEDINIPUR | Chandkuri and Adj. Mouzas Water Supply Scheme | SM/03326 | 1463/MD | DULAL CHANDRA DAS | 26-11-2020 | 25-05-2021 | |
91 | PASCHIM MEDINIPUR | Chandkuri and Adj. Mouzas Water Supply Scheme | SM/03326 | SM/06920 | 1463/MD | DULAL CHANDRA DAS | 26-11-2020 | 25-05-2021 |
92 | PASCHIM MEDINIPUR | Chandkuri and Adj. Mouzas Water Supply Scheme | SM/03326 | SM/06922 | 1464/MD | DULAL CHANDRA DAS | 26-11-2020 | 25-05-2021 |
93 | PASCHIM MEDINIPUR | CHANDRAKONA ROAD RLY STATION WATER SUPPLY SCHEME | SM/00764 | SM/10091 | 1960/MD | BANERJEE CONSTRUCTION | 20-09-2022 | 19-03-2023 |
94 | PASCHIM MEDINIPUR | CHANDRAKONA ROAD RLY STATION WATER SUPPLY SCHEME | SM/00764 | SM/10091 | 526/MD | GOBINDA MAITY | 21-03-2022 | 19-06-2022 |
95 | PASCHIM MEDINIPUR | CHHOTA NAKDANA AND ADJOINING MOUJAS PWSS | SM/13078 | 977/MD | S.T. ENTERPRISE | 10-04-2023 | 09-06-2023 | |
96 | PASCHIM MEDINIPUR | CHOTA TARA AND ADJOINING MOUJAS PWSS | SM/18619 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
97 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 868/MD | AJITESH ACHARJEE | 28-03-2023 | 11-04-2023 | |
98 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 2593/MD | SARADA CONSTRUCTION | 21-07-2023 | 04-08-2023 | |
99 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 743/MD | S.K. CONSTRUCTION | 13-03-2024 | 27-03-2024 | |
100 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 742/MD | ARNAB PATRA | 13-03-2024 | 27-03-2024 | |
101 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 867/MD | RITESH AGARWALL | 28-03-2023 | 11-04-2023 | |
102 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 785/MD | S.K. CONSTRUCTION | 17-03-2023 | 31-03-2023 | |
103 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 784/MD | M/S. SUBHAS CHANDRA KUNDU | 17-03-2023 | 31-03-2023 | |
104 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 967/MD | MALLIK CONSTRUCTION | 06-04-2023 | 20-04-2023 | |
105 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 968/MD | OM UDYUG | 06-04-2023 | 20-04-2023 | |
106 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 964/MD | SAJAL JANA | 06-04-2023 | 20-04-2023 | |
107 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 966/MD | OM UDYUG | 06-04-2023 | 20-04-2023 | |
108 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 870/MD | M/S. INDRAJIT ROY | 28-03-2023 | 11-04-2023 | |
109 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 965/MD | BENGAL TRADERS | 06-04-2023 | 20-04-2023 | |
110 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 1437/MD | M/S. BLUE BIRD | 04-05-2023 | 18-05-2023 | |
111 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 1436/MD | M/S. BLUE BIRD | 04-05-2023 | 18-05-2023 | |
112 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 2473/MD | MAHAPRABHU ENTERPRISE | 14-07-2023 | 28-07-2023 | |
113 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 734/MD | HYDRO TECH ASSOCIATES | 10-03-2023 | 24-03-2023 | |
114 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 782/MD | PRITI ENTERPRISE | 17-03-2023 | 31-03-2023 | |
115 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 738/MD | A.R. CONSTRUCTION | 10-03-2023 | 24-03-2023 | |
116 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 750/MD | DEBASIS DATTA | 13-03-2023 | 27-03-2023 | |
117 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 803/MD | S.M. ENTERPRISE | 20-03-2023 | 03-04-2023 | |
118 | PASCHIM MEDINIPUR | Construction & Commissioning including FHTC with 3 (three) months trial run including electro-mechanical part for proposed 26 nos. Mini Pipe W/S Scheme within blocks Chandrakona-I (4 Nos.), Chandrakona-II (8 Nos.), Daspur-I (3 Nos.), Daspur-II (9 Nos.) & Kharagpur-I (2 Nos.) in Paschim Medinipur District under Midnapore Division, PHE Dte. | SM/16202 | 869/MD | A R ENTERPRISE | 28-03-2023 | 11-04-2023 | |
119 | PASCHIM MEDINIPUR | DAKSHIN PARSHURA AND ITS ADJOINING MOUZAS PWSS | SM/17004 | 2956/MD | M/S. D.K.H.CONSTRUCTION | 17-08-2023 | 13-02-2024 | |
120 | PASCHIM MEDINIPUR | Dalang Piped Water Supply Scheme | SM/05334 | 1467/MD | M/S. D.K.H.CONSTRUCTION | 07-09-2021 | 28-09-2021 | |
121 | PASCHIM MEDINIPUR | Dalang Piped Water Supply Scheme | SM/05334 | 1467/MD | M/S. D.K.H.CONSTRUCTION | 07-09-2021 | 28-09-2021 | |
122 | PASCHIM MEDINIPUR | Dalang Piped Water Supply Scheme | SM/05334 | 407/MD | M/S. D.K.H.CONSTRUCTION | 26-02-2021 | 12-04-2021 | |
123 | PASCHIM MEDINIPUR | Dalang Piped Water Supply Scheme | SM/05334 | 872/MD | M/S. D.K.H.CONSTRUCTION | 10-05-2022 | 25-05-2022 | |
124 | PASCHIM MEDINIPUR | DAMODARPUR AND ADJOINING MOUJAS PWSS | SM/13008 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
125 | PASCHIM MEDINIPUR | DANTAN WATER SUPPLY SCHEME | SM/00762 | SM/10000 | 1364/MD | CONCORD ENGINEERING | 08-07-2022 | 04-01-2023 |
126 | PASCHIM MEDINIPUR | DASPUR WATER SUPPLY SCHEME | SM/01098 | SM/18506 | 3145/MD | GOBINDA MAITY | 29-08-2023 | 25-02-2024 |
127 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | SM/08203 | 413/MD | DEV KUMAR ADAK | 26-02-2021 | 13-03-2021 |
128 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 1464/MD | M/S. D.K.H.CONSTRUCTION | 07-09-2021 | 22-10-2021 | |
129 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 1468/MD | DULAL CHANDRA DAS | 07-09-2021 | 28-09-2021 | |
130 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 1464/MD | M/S. D.K.H.CONSTRUCTION | 07-09-2021 | 22-10-2021 | |
131 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 2670/MD | M/S. D.K.H.CONSTRUCTION | 26-07-2023 | 25-08-2023 | |
132 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 1464/MD | M/S. D.K.H.CONSTRUCTION | 07-09-2021 | 22-10-2021 | |
133 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 413/MD | DEV KUMAR ADAK | 26-02-2021 | 13-03-2021 | |
134 | PASCHIM MEDINIPUR | Daulatchak Piped Water Supply Scheme | SM/05321 | 413/MD | DEV KUMAR ADAK | 26-02-2021 | 13-03-2021 | |
135 | PASCHIM MEDINIPUR | Debhog and Adj, Mouzas Water Supply Scheme | SM/03062 | SM/06915 | 2533/MD | MIDNAPUR PIPE CONCERN | 12-12-2022 | 26-12-2022 |
136 | PASCHIM MEDINIPUR | Debhog and Adj, Mouzas Water Supply Scheme | SM/03062 | 1461/MD | MIDNAPUR PIPE CONCERN | 26-11-2020 | 25-05-2021 | |
137 | PASCHIM MEDINIPUR | DEBRA WATER SUPPLY SCHEME | SM/00435 | SM/09430 | 569/MD | GOBINDA MAITY | 28-03-2022 | 24-09-2022 |
138 | PASCHIM MEDINIPUR | Dhaneswarpur Piped Water Supply Scheme | SM/05992 | 416/MD | GOBINDA MAITY | 26-02-2021 | 28-03-2021 | |
139 | PASCHIM MEDINIPUR | DHANESWARPUR RURAL PIPED WATER SUPPLY SCHEME | SM/01162 | SM/09722 | 2170/MD | UTTAM KUMAR DAS | 17-12-2021 | 21-01-2022 |
140 | PASCHIM MEDINIPUR | DHARMMA PUR AND ITS ADJOINING MOUZAS PWSS | SM/18524 | 3040/MD | BANERJEE CONSTRUCTION | 22-08-2023 | 18-02-2024 | |
141 | PASCHIM MEDINIPUR | DHUIPARA PIPED WATER SUPPLY SCHEME OF MOHANPUR BLOCK,UNDER MEDINIPUR DIVISION | SM/17005 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
142 | PASCHIM MEDINIPUR | DINGAL AND ITS ADJOINING MOUJAS PWSS | SM/12828 | 2826/MD | GOBINDA MAITY | 07-08-2023 | 04-03-2024 | |
143 | PASCHIM MEDINIPUR | DOSATINA AND ITS ADJOINING MOUZAS PWSS | SM/15589 | 2954/MD | M/S. D.K.H.CONSTRUCTION | 17-08-2023 | 13-02-2024 | |
144 | PASCHIM MEDINIPUR | DUAN-II AND ITS ADJOINING MOUJAS PWSS | SM/17616 | 2826/MD | GOBINDA MAITY | 07-08-2023 | 04-03-2024 | |
145 | PASCHIM MEDINIPUR | Dwandbipur & its adjoining mouzas Water Supply Scheme, Block - Ghatal, Dist.- Paschim Medinipur. | SM/14999 | 1337/MD | M/S. D.K.H.CONSTRUCTION | 28-04-2023 | 25-10-2023 | |
146 | PASCHIM MEDINIPUR | ELUNI PIPED WATER SUPPLY SCHEME | SM/13081 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
147 | PASCHIM MEDINIPUR | GAMA AND ADJOINING MOUJAS PWSS | SM/13083 | 3047/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 23-08-2023 | 19-04-2024 | |
148 | PASCHIM MEDINIPUR | GAMARIA PIPED WATER SUPPLY SCHEME | SM/13141 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
149 | PASCHIM MEDINIPUR | GANUA AND ADJOINING MOUJAS PWSS | SM/15000 | 3047/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 23-08-2023 | 19-04-2024 | |
150 | PASCHIM MEDINIPUR | Garhbeta(NM) | SM/08692 | SM/09933 | 837/MD | BANERJEE CONSTRUCTION | 02-05-2022 | 29-10-2022 |
151 | PASCHIM MEDINIPUR | Garhbeta(NM) | SM/08692 | SM/08325 | 427/MD | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 |
152 | PASCHIM MEDINIPUR | GAZIPUR PATNA AND ADJOINING MOUJAS PWSS | SM/13084 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
153 | PASCHIM MEDINIPUR | GHOSHPUR PIPED WATER SUPPLY SCHEME | SM/18535 | 3842/MD | M/S. A.R. ENTERPRISE. | 21-09-2023 | 19-03-2024 | |
154 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 804/AE/MSSD | JIT ENTERPRISE | 11-01-2023 | 26-01-2023 |
155 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/08326 | 428/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 26-06-2021 |
156 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 1070/MD | MAITY ENTERPRISE | 03-06-2022 | 18-07-2022 |
157 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 798/AE/MSSD | CHANDAN YADAV | 10-01-2023 | 25-01-2023 |
158 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 797/AE/MSSD | ARNAB PATRA | 10-01-2023 | 25-01-2023 |
159 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 794/AE/MSSD | A R ENTERPRISE | 10-01-2023 | 25-01-2023 |
160 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 1069/MD | MAITY ENTERPRISE | 03-06-2022 | 24-06-2022 |
161 | PASCHIM MEDINIPUR | GOALTORE WATER SUPPLY SCHEME | SM/00433 | SM/09421 | 799/AE/MSSD | RUPKUMAR KARMAKAR | 10-01-2023 | 25-01-2023 |
162 | PASCHIM MEDINIPUR | Gobindanagar Piped Water Supply Scheme | SM/10066 | 838/MD | DIPAK KUMAR DOLAI | 02-05-2022 | 29-10-2022 | |
163 | PASCHIM MEDINIPUR | GOBINDAPUR AND IT'S ADJOINING MOUJAS PWSS | SM/17620 | 2826/MD | GOBINDA MAITY | 07-08-2023 | 04-03-2024 | |
164 | PASCHIM MEDINIPUR | GODAPIASOL AND ADJOINING MOUJAS PWSS | SM/13077 | 2492/MD | MIDNAPUR PIPE CONCERN | 17-07-2023 | 15-09-2023 | |
165 | PASCHIM MEDINIPUR | GOKULPUR AND ADJOINING MOUJAS PWSS | SM/14649 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
166 | PASCHIM MEDINIPUR | GOPAL BANDH AND ITS ADJOINING MOUZAS WATER SUPPLY SCHEME | SM/18508 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
167 | PASCHIM MEDINIPUR | Gopalnagar Piped Water Supply Scheme, Block - Daspur-I, Dist.- Paschim Medinipur. | SM/19044 | 2953/MD | GOBINDA MAITY | 17-08-2023 | 13-02-2024 | |
168 | PASCHIM MEDINIPUR | GOPINATHPUR AND IT'S ADJOINING MOUJAS PWSS | SM/12986 | 1340/MD | SUJATA CONSTRUCTION | 28-04-2023 | 25-10-2023 | |
169 | PASCHIM MEDINIPUR | Gopinathpur Piped Water Supply Scheme. | SM/07964 | 2189/MD | BANERJEE CONSTRUCTION | 01-11-2022 | 30-04-2023 | |
170 | PASCHIM MEDINIPUR | GOVINDAPUR BRAHMAN SASAN AND ADJOINING MOUJAS PWSS | SM/13076 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
171 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Bhagirathpur mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/11858 | 1729/MD | PULLOCK KUMAR GHOSH | 23-08-2022 | 20-01-2023 | |
172 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Bhagirathpur mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/11858 | 1730/MD | PULLOCK KUMAR GHOSH | 23-08-2022 | 20-01-2023 | |
173 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chauka mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10648 | 1676/MD | M/S. D.K.H.CONSTRUCTION | 12-08-2022 | 09-01-2023 | |
174 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chauka mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10648 | 1675/MD | M/S. D.K.H.CONSTRUCTION | 12-08-2022 | 09-01-2023 | |
175 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chaulkuri & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09681 | 522/MD | BISWAJIT BAG | 21-03-2022 | 18-08-2022 | |
176 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chaulkuri & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09681 | 521/MD | USHA CONCERN | 21-03-2022 | 18-08-2022 | |
177 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chaulkuri & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09681 | 524/MD | BISWAJIT BAG | 21-03-2022 | 18-08-2022 | |
178 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Chaulkuri & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09681 | 523/MD | BISWAJIT BAG | 21-03-2022 | 18-08-2022 | |
179 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme For Dantardabatitaki Mouzas | SM/09441 | 2178/MD | MIDNAPUR PIPE CONCERN | 17-12-2021 | 16-05-2022 | |
180 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Dasha Gram & its adj. mouzas, Block - Sabang, Dist. - Paschim Medinipur. | SM/10649 | 1956/MD | M/S. A.R. ENTERPRISE. | 20-09-2022 | 19-03-2023 | |
181 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Daspur mouzas, Block - Sabang, District - Paschim Medinipur | SM/10658 | 2185/MD | S.T. ENTERPRISE | 01-11-2022 | 31-03-2023 | |
182 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Daspur mouzas, Block - Sabang, District - Paschim Medinipur | SM/10658 | 2184/MD | S.N ENTERPRISE | 01-11-2022 | 31-03-2023 | |
183 | PASCHIM MEDINIPUR | GROUND BASED MINI PIPED WATER SUPPLY SCHEME FOR DEULBERE MOUZA, BLOCK CHANDRAKONA-II, DISTRICT-PASCHIM MEDINIPUR | SM/17008 | 2674/MD | SUBHASIS DOLAI | 26-07-2023 | 09-09-2023 | |
184 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Dewanchak mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10003 | 525/MD | WATER LINK | 21-03-2022 | 18-08-2022 | |
185 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Dewanchak mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10003 | 539/MD | M/S. ZAMAN ENTERPRISE | 22-03-2022 | 19-08-2022 | |
186 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Dewanchak mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10003 | 293/MD | DIPAK KUMAR DOLAI | 15-02-2022 | 15-07-2022 | |
187 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Dewanchak mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10003 | 294/MD | SAMIT PAL | 15-02-2022 | 15-07-2022 | |
188 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme For Dontarda Mouzas | SM/09439 | 2179/MD | MIDNAPUR PIPE CONCERN | 17-12-2021 | 16-05-2022 | |
189 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Fate Chak mouzas. | SM/09682 | 182/MD | MASUM ALI KHAN | 01-02-2022 | 01-07-2022 | |
190 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Gholshahi mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/15220 | 557/MD | KISHORE GHOSH | 22-02-2023 | 22-07-2023 | |
191 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Gholshahi mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/15220 | 556/MD | KISHORE GHOSH | 22-02-2023 | 22-07-2023 | |
192 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Haripura mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09680 | 286/MD | SAI TUBE CO. | 15-02-2022 | 15-07-2022 | |
193 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Jamira mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10655 | 1731/MD | MIDNAPUR PIPE CONCERN | 23-08-2022 | 20-01-2023 | |
194 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Jamira mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10655 | 1732/MD | MIDNAPUR PIPE CONCERN | 23-08-2022 | 20-01-2023 | |
195 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Khunkhunya & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09684 | 287/MD | SAI TUBE CO. | 15-02-2022 | 15-07-2022 | |
196 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Krishnaballabhpur mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10717 | 345/MD | M/S. SOMNATH | 31-01-2023 | 30-06-2023 | |
197 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Lachhmi Chak & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09675 | 175/MD | BIDHAN CHANDRA PATRA | 01-02-2022 | 01-07-2022 | |
198 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Lachhmi Chak & its adjoining mouzas, Block - Sabang, District - Paschim Medinipur | SM/09675 | 176/MD | BIDHAN CHANDRA PATRA | 01-02-2022 | 01-07-2022 | |
199 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Lejibheri mouzas. | SM/09677 | 181/MD | MASUM ALI KHAN | 01-02-2022 | 01-07-2022 | |
200 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Mangrajpur mouzas, Block - Sabang, District - Paschim Medinipur | SM/18785 | 3165/MD | SANKAR PRASAD MAITY | 31-08-2023 | 28-01-2024 | |
201 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Masharpur mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10002 | 294/MD | SAMIT PAL | 15-02-2022 | 15-07-2022 | |
202 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Masharpur mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10002 | 319/MD | PULLOCK KUMAR GHOSH | 17-02-2022 | 17-07-2022 | |
203 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Masharpur mouza under SAGY, Block - Ghatal, GP - Dewanchak-II, PS - Ghatal, Dist.- Paschim Medinipur. | SM/10002 | 618/MD | DEVJYOTI BERA | 04-04-2022 | 01-09-2022 | |
204 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Mirjapur mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09679 | 421/MD | A R ENTERPRISE | 04-03-2022 | 01-08-2022 | |
205 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme For Nankarnila Mouzas | SM/09442 | 2180/MD | MIDNAPUR PIPE CONCERN | 17-12-2021 | 16-05-2022 | |
206 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Naoyagan mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09683 | 344/MD | SANKAR PRASAD MAITY | 21-02-2022 | 21-07-2022 | |
207 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Naoyagan mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09683 | 343/MD | SANKAR PRASAD MAITY | 21-02-2022 | 21-07-2022 | |
208 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Nilhat mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09676 | 180/MD | MASUM ALI KHAN | 01-02-2022 | 01-07-2022 | |
209 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Raghunathpur mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10657 | 1363/MD | GOUTAM RAY | 08-07-2022 | 05-12-2022 | |
210 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Raghunathpur mouza under SAGY, Block - Ghatal, G.P. - Dewanchak-II, P.S. - Ghatal, District - Paschim Medinipur. | SM/10657 | 1419/MD | WATER LINK | 15-07-2022 | 12-12-2022 | |
211 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme For Talda Mouzas | SM/09440 | 2181/MD | MIDNAPUR PIPE CONCERN | 17-12-2021 | 16-05-2022 | |
212 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Uchitpur mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09678 | 422/MD | GOUTAM PARIA | 04-03-2022 | 01-08-2022 | |
213 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Uchitpur mouzas, Block - Sabang, District - Paschim Medinipur. | SM/09678 | 183/MD | MASUM ALI KHAN | 01-02-2022 | 01-07-2022 | |
214 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Uttar Eral mouzas, Block - Sabang, District - Paschim Medinipur | SM/09795 | 470/MD | SUJATA CONSTRUCTION | 09-03-2022 | 06-08-2022 | |
215 | PASCHIM MEDINIPUR | Ground Based Mini Piped Water Supply Scheme for Uttar Eral mouzas, Block - Sabang, District - Paschim Medinipur | SM/09795 | 469/MD | SUJATA CONSTRUCTION | 09-03-2022 | 06-08-2022 | |
216 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Amba (Zone-I, II & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/19049 | 2465/MD | GOBINDA MAITY | 14-07-2023 | 19-02-2024 | |
217 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Chaipat (Zone-I & II) & its adjoining mouzas. | SM/12875 | 2556/MD | M/S. S.S. ENTERPRISE | 15-12-2022 | 03-07-2023 | |
218 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Gokulpur (Zone-I, II, & III) & its adjoining mouzas, Block - Kharagpur-I | SM/19102 | 2466/MD | GOBINDA MAITY | 14-07-2023 | 30-01-2024 | |
219 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Hariatara (Zone-I, II, & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/14483 | 2472/MD | DEBASISH DOGRA | 14-07-2023 | 12-09-2023 | |
220 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Hariatara (Zone-I, II, & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/14483 | 2468/MD | WATER LINK | 14-07-2023 | 12-09-2023 | |
221 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Hariatara (Zone-I, II, & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/14483 | 805/MD | AJIJUR RAHAMAN MALLICK | 15-03-2024 | 14-05-2024 | |
222 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Hariatara (Zone-I, II, & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/14483 | 1408/MD | R. CONSTRUCTION | 04-05-2023 | 03-07-2023 | |
223 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Jote Kanuramgar & its adjoining mouzas. | SM/11622 | 2364/MD | GOBINDA MAITY | 21-11-2022 | 09-06-2023 | |
224 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Kashijora (Zone-I & II) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/14492 | 2465/MD | GOBINDA MAITY | 14-07-2023 | 19-02-2024 | |
225 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Kelegoda & its adjoining mouzas. | SM/11879 | 2556/MD | M/S. S.S. ENTERPRISE | 15-12-2022 | 03-07-2023 | |
226 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Khemasoli (Zone-I, II & III) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/15590 | 946/MD | GOUTAM PARIA | 05-04-2023 | 04-06-2023 | |
227 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Khukur Daha & its adjoining mouzas. | SM/19101 | 142/MD | MASUM ALI KHAN | 18-01-2024 | 16-07-2024 | |
228 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Raghunathpur & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/15257 | 2526/MD | ANIRUDDHA BAG | 18-07-2023 | 14-01-2024 | |
229 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Ramkrishnapur & its adjoining mouzas. | SM/11623 | 2364/MD | GOBINDA MAITY | 21-11-2022 | 09-06-2023 | |
230 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Ranichak & its adjoining mouzas. | SM/11624 | 2364/MD | GOBINDA MAITY | 21-11-2022 | 09-06-2023 | |
231 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Risa & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/15591 | 2466/MD | GOBINDA MAITY | 14-07-2023 | 30-01-2024 | |
232 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Tangasol (Zone-I & II) & its adjoining mouzas, Block - Kharagpur-I, Dist.- Paschim Medinipur. | SM/18696 | 5155/MD | RITESH AGARWALL | 07-11-2023 | 06-01-2024 | |
233 | PASCHIM MEDINIPUR | Ground Based Pipe Water Supply Scheme for Uttar Bar (Zone-I & II) & its adjoining mouzas. | SM/12876 | 2556/MD | M/S. S.S. ENTERPRISE | 15-12-2022 | 03-07-2023 | |
234 | PASCHIM MEDINIPUR | Ground Based Piped Water Supply Scheme for Amrakuchi mouza. | SM/04083 | SM/18191 | 1356/MD | PULLOCK KUMAR GHOSH | 02-05-2023 | 01-07-2023 |
235 | PASCHIM MEDINIPUR | Ground Based Piped Water Supply Scheme for Amrakuchi mouza. | SM/04083 | 406/MD | PULLOCK KUMAR GHOSH | 26-02-2021 | 13-03-2021 | |
236 | PASCHIM MEDINIPUR | Ground Based Piped Water Supply Scheme for Amrakuchi mouza. | SM/04083 | 406/MD | PULLOCK KUMAR GHOSH | 26-02-2021 | 13-03-2021 | |
237 | PASCHIM MEDINIPUR | Ground Based Piped Water Supply Scheme for Amrakuchi mouza. | SM/04083 | 1444/MD | PULLOCK KUMAR GHOSH | 03-09-2021 | 13-09-2021 | |
238 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 500/AE/KSD | BABUSONA CONSTRUCTION | 03-08-2022 | 02-09-2022 | |
239 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 542/AE/KSD | MAMPI ENTERPRISE | 23-08-2022 | 22-09-2022 | |
240 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 540/AE/KSD | A-PLUS | 23-08-2022 | 22-09-2022 | |
241 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 539/AE/KSD | A-PLUS | 23-08-2022 | 22-09-2022 | |
242 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 541/AE/KSD | MAMPI ENTERPRISE | 23-08-2022 | 22-09-2022 | |
243 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 285/AE/GSD | BABUSONA CONSTRUCTION | 10-04-2023 | 25-04-2023 | |
244 | PASCHIM MEDINIPUR | Ground water based mini piped water supply scheme for provision of drinking water at different left out vulnerable drought affected areas in 36 Nos. different locations | SM/06463 | 284/AE/GSD | BABUSONA CONSTRUCTION | 10-04-2023 | 25-04-2023 | |
245 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chandpur & mouzas. | SM/04680 | SM/06894 | 1443/MD | MASUM ALI KHAN | 26-11-2020 | 25-05-2021 |
246 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chandpur & mouzas. | SM/04680 | SM/06894 | 1443/MD | MASUM ALI KHAN | 26-11-2020 | 25-05-2021 |
247 | PASCHIM MEDINIPUR | GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGCHHARI TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MEDNIPUR DISTRICT UNDER MEDNIPUR DIVISION, PHE DTE. | SM/18171 | 2825/MD | GOBINDA MAITY | 07-08-2023 | 03-02-2024 | |
248 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bamanda | SM/04693 | 1320/MD | SANKAR PRASAD MAITY | 06-11-2020 | 05-05-2021 | |
249 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Barisha & its adjoining mouzas | SM/03858 | SM/06906 | 1434/MD | UTTAM KUMAR DAS | 26-11-2020 | 25-05-2021 |
250 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Barisha & its adjoining mouzas | SM/03858 | SM/06903 | 213/AE/KSD | SK. TASLIM | 29-04-2022 | 14-05-2022 |
251 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Barisha & its adjoining mouzas | SM/03858 | SM/06903 | 617/MD | NUTAN BAZAR ENGINEER,S CO-OPERATIVE SOCIETY LTD. | 04-04-2022 | 04-05-2022 |
252 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Barisha & its adjoining mouzas | SM/03858 | SM/06903 | 1471/MD | SK. SALIM | 26-11-2020 | 25-05-2021 |
253 | PASCHIM MEDINIPUR | GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BASANCHHARA TO ACCOMMODATE FHTC UNDER CHANDRAKONA - II BLOCK IN PASCHIM MEDNIPUR DISTRICT UNDER MEDNIPUR DIVISION, PHE DTE. | SM/18172 | 3260/MD | M/S. D.K.H.CONSTRUCTION | 12-09-2023 | 10-03-2024 | |
254 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Belun | SM/05034 | 1321/MD | GOBINDA MAITY | 06-11-2020 | 05-05-2021 | |
255 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Belun | SM/05034 | SM/13709 | 450/MD | MASUM ALI KHAN | 13-02-2023 | 14-04-2023 |
256 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Belun | SM/05034 | 1321/MD | GOBINDA MAITY | 06-11-2020 | 05-05-2021 | |
257 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Beluria & its Adj. Mouzas | SM/03704 | SM/06908 | 1470/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 |
258 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Beluria & its Adj. Mouzas | SM/03704 | 376/MD | M/S. A.R. ENTERPRISE. | 25-02-2021 | 27-03-2021 | |
259 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Beluria & its Adj. Mouzas | SM/03704 | 1470/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 | |
260 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Beluria & its Adj. Mouzas | SM/03704 | SM/06908 | 376/MD | M/S. A.R. ENTERPRISE. | 25-02-2021 | 27-03-2021 |
261 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhabanipur | SM/04916 | 1443/MD | SAMIT PAL | 03-09-2021 | 18-09-2021 | |
262 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhabanipur | SM/04916 | 370/MD | SAMIT PAL | 25-02-2021 | 12-03-2021 | |
263 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhabanipur | SM/04916 | 2169/MD | SAMIT PAL | 21-10-2022 | 20-11-2022 | |
264 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhemwa & its adjoining mouzas | SM/03856 | SM/06909 | 1469/MD | HARIPADA PATTANAYAK | 26-11-2020 | 25-05-2021 |
265 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhemwa & its adjoining mouzas | SM/03856 | SM/06907 | 1468/MD | MASUM ALI KHAN | 26-11-2020 | 25-05-2021 |
266 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Bhemwa & its adjoining mouzas | SM/03856 | 1469/MD | HARIPADA PATTANAYAK | 26-11-2020 | 25-05-2021 | |
267 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chakmakrampur & adj. mouzas | SM/03533 | SM/06912 | 1442/MD | M/S. CARE | 26-11-2020 | 25-05-2021 |
268 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chakmakrampur & adj. mouzas | SM/03533 | 306/MD | M/S. EL-CON | 22-02-2021 | 08-04-2021 | |
269 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chaupanya & its Adj. Mouzas | SM/03691 | SM/06913 | 1451/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 |
270 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chaupanya & its Adj. Mouzas | SM/03691 | 1451/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 | |
271 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chhotokhelna & its Adj. Mouzas | SM/03705 | SM/06914 | 339/MD | ASHIM KUMAR DEY | 24-02-2021 | 05-04-2021 |
272 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Chhotokhelna & its Adj. Mouzas | SM/03705 | SM/06914 | 1431/MD | ASHIM KUMAR DEY | 26-11-2020 | 25-05-2021 |
273 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Durgapur and its adjoining mouzas | SM/04819 | 511/MD | SUBHASIS DOLAI | 27-02-2024 | 28-03-2024 | |
274 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Gobindapur & adj. mouzas | SM/04657 | 1283/MD | SANDIP BISWAS | 16-10-2020 | 14-04-2021 | |
275 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Gokulpur & its adjoining mouzas | SM/04712 | 1334/MD | KISHORE GHOSH | 10-11-2020 | 09-05-2021 | |
276 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jambani | SM/05038 | 1280/MD | DIPAK KUMAR BAKLY | 16-10-2020 | 14-04-2021 | |
277 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jamna | SM/04929 | SM/08212 | 217/AE/KSD | GOBINDA MAITY | 29-04-2022 | 29-05-2022 |
278 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jamna | SM/04929 | 2184/MD | GOBINDA MAITY | 17-12-2021 | 07-01-2022 | |
279 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jamna | SM/04929 | 88/AE/KSD | NIMAI LAL GURIA | 23-02-2021 | 15-03-2021 | |
280 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jamna | SM/04929 | 445/MD | GOBINDA MAITY | 26-02-2021 | 19-03-2021 | |
281 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 496/AE/KSD | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | 03-08-2022 | 02-09-2022 | |
282 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 89/AE/KSD | DEBASISH DOGRA | 23-02-2021 | 15-03-2021 | |
283 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 90/AE/KSD | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | 23-02-2021 | 15-03-2021 | |
284 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 88/AE/KSD | NIMAI LAL GURIA | 23-02-2021 | 15-03-2021 | |
285 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 497/AE/KSD | DEBASISH DOGRA | 03-08-2022 | 02-09-2022 | |
286 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Japhala & its adj. Mouzas | SM/04692 | 91/AE/KSD | K & KABERI ENTERPRISE (PROP. GOUTAM MAITY) | 23-02-2021 | 15-03-2021 | |
287 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jot Ghanashyam & its adjoining mouzas | SM/04591 | SM/09726 | 1242/MD | GOBINDA MAITY | 20-06-2022 | 10-11-2025 |
288 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Jot Ghanashyam & its adjoining mouzas | SM/04591 | 2015/MD | GOBINDA MAITY | 03-12-2021 | 03-03-2022 | |
289 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kalaberya Bhadutala & its adj. mouzas. | SM/04704 | 122/MD | DULAL CHANDRA DAS | 10-01-2023 | 31-01-2023 | |
290 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kalaberya Bhadutala & its adj. mouzas. | SM/04704 | 1474/MD | DULAL CHANDRA DAS | 26-11-2020 | 25-05-2021 | |
291 | PASCHIM MEDINIPUR | Ground water based piped water supply scheme for Karkai and adjoining mouzas | SM/04040 | 377/MD | GOBINDA MAITY | 25-02-2021 | 27-03-2021 | |
292 | PASCHIM MEDINIPUR | Ground water based piped water supply scheme for Karkai and adjoining mouzas | SM/04040 | SM/14479 | 454/MD | GOBINDA MAITY | 13-02-2023 | 14-04-2023 |
293 | PASCHIM MEDINIPUR | Ground water based piped water supply scheme for Karkai and adjoining mouzas | SM/04040 | SM/06901 | 1448/MD | GOBINDA MAITY | 26-11-2020 | 25-05-2021 |
294 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kasanda | SM/04915 | SM/09082 | 1585/MD | DEVJYOTI BERA | 11-12-2020 | 09-06-2021 |
295 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Khagragerya & adj. mouzas | SM/06302 | SM/09709 | 2093/MD | ASHOK BANERJEE | 10-12-2021 | 08-02-2022 |
296 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Khanjapur & its adjoining mouzas | SM/04582 | SM/06902 | 1446/MD | MIDNAPUR PIPE CONCERN | 26-11-2020 | 25-05-2021 |
297 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Khanjapur & its adjoining mouzas | SM/04582 | SM/06902 | 1446/MD | MIDNAPUR PIPE CONCERN | 26-11-2020 | 25-05-2021 |
298 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Khanjapur & its adjoining mouzas | SM/04582 | SM/06902 | 2534/MD | MIDNAPUR PIPE CONCERN | 12-12-2022 | 26-12-2022 |
299 | PASCHIM MEDINIPUR | Ground water based piped water supply scheme for Kharpara Mouza | SM/04019 | 1433/MD | S.K. CONSTRUCTION | 26-11-2020 | 25-05-2021 | |
300 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kolanda & its adjoining mouzas | SM/04567 | SM/06928 | 1452/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 |
301 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kultikri | SM/04921 | 424/MD | GOUTAM RAY | 26-02-2021 | 12-04-2021 | |
302 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kultikri | SM/04921 | 403/MD | WATER LINK | 26-02-2021 | 13-03-2021 | |
303 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kultikri | SM/04921 | 444/MD | DEBASIS DATTA | 26-02-2021 | 08-03-2021 | |
304 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kultikri | SM/04921 | 402/MD | WATER LINK | 26-02-2021 | 13-03-2021 | |
305 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Kultikri | SM/04921 | 404/MD | ASHIM KUMAR DEY | 26-02-2021 | 22-04-2021 | |
306 | PASCHIM MEDINIPUR | GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR LAKSHIPUR TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MEDNIPUR DISTRICT UNDER MEDNIPUR DIVISION, PHE DTE. | SM/18173 | 3238/MD | UNIQUE AGENCY | 11-09-2023 | 09-03-2024 | |
307 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Maligram & its Adj. Mouzas | SM/03706 | 1450/MD | HARIPADA PATTANAYAK | 26-11-2020 | 25-05-2021 | |
308 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Maligram & its Adj. Mouzas | SM/03706 | SM/06895 | 1450/MD | HARIPADA PATTANAYAK | 26-11-2020 | 25-05-2021 |
309 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Maligram & its Adj. Mouzas | SM/03706 | 684/MD | UTTAM KUMAR DAS | 03-05-2021 | 17-06-2021 | |
310 | PASCHIM MEDINIPUR | GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MANGRUL TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MEDNIPUR DISTRICT UNDER MEDNIPUR DIVISION, PHE DTE. | SM/18615 | 2825/MD | GOBINDA MAITY | 07-08-2023 | 03-02-2024 | |
311 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Mansuka | SM/04913 | 1473/MD | M/S. A.R. ENTERPRISE. | 26-11-2020 | 25-05-2021 | |
312 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Mansuka | SM/04913 | SM/15084 | 2587/MD | DIPAK KUMAR DOLAI | 19-12-2022 | 02-02-2023 |
313 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Mansuka | SM/04913 | 1435/MD | DIPAK KUMAR DOLAI | 26-11-2020 | 25-05-2021 | |
314 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Palashi & Adjoining Mouzas | SM/03653 | 1437/MD | UTTAM KUMAR DAS | 26-11-2020 | 25-05-2021 | |
315 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Palashi & Adjoining Mouzas | SM/03653 | SM/06930 | 1459/MD | GOBINDA MAITY | 26-11-2020 | 25-05-2021 |
316 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Palashi & Adjoining Mouzas | SM/03653 | SM/13046 | 709/MD | GOBINDA MAITY | 06-03-2023 | 20-04-2023 |
317 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Palasi & its adj. Mouzas. | SM/04744 | 1437/MD | UTTAM KUMAR DAS | 26-11-2020 | 25-05-2021 | |
318 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Ragpur & Adj. Mouzas | SM/03689 | SM/06927 | 1449/MD | GOBINDA MAITY | 26-11-2020 | 25-05-2021 |
319 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Ranapur & adjoining mouzas | SM/04578 | 1429/MD | KISHORE GHOSH | 26-11-2020 | 25-05-2021 | |
320 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Ranapur & adjoining mouzas | SM/04578 | SM/06934 | 1429/MD | KISHORE GHOSH | 26-11-2020 | 25-05-2021 |
321 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Raskundu & adj. mouzas. | SM/04498 | 1427/MD | M/S. EL-CON | 26-11-2020 | 25-05-2021 | |
322 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Raskundu & adj. mouzas. | SM/04498 | SM/08314 | 428/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 26-06-2021 |
323 | PASCHIM MEDINIPUR | Ground Water Based Piped Water Supply Scheme for Sahapur & its adjoining mouzas | SM/04797 | 1324/MD | SHAKEEL KHAN | 06-11-2020 | 05-05-2021 | |
324 | PASCHIM MEDINIPUR | Ground water based piped water supply scheme for Sandhipur | SM/04955 | 1322/MD | SUNIL DULE | 06-11-2020 | 05-05-2021 | |
325 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Anandapur Sundarpur & adj.mouzas. | SM/04708 | 1332/MD | BANERJEE CONSTRUCTION | 10-11-2020 | 09-05-2021 | |
326 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Bachhra Kundu & adj. mouzas | SM/04714 | 1333/MD | ASHOK BANERJEE | 10-11-2020 | 09-05-2021 | |
327 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Bachhra Kundu & adj. mouzas | SM/04714 | 1333/MD | ASHOK BANERJEE | 10-11-2020 | 09-05-2021 | |
328 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Bachhra Kundu & adj. mouzas | SM/04714 | 2620/MD | ASHOK BANERJEE | 24-07-2023 | 22-09-2023 | |
329 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Mulgram & adjoining mouzas. | SM/04703 | 2094/MD | M/S MOINAK POREL | 10-12-2021 | 08-02-2022 | |
330 | PASCHIM MEDINIPUR | Ground Water Based Water Supply Scheme for Supapursuri & adj. moujas. | SM/04702 | 1436/MD | TAPAS SANTRA | 26-11-2020 | 25-05-2021 | |
331 | PASCHIM MEDINIPUR | Ground Water Supply Based Piped Water Supply Scheme for Dhamsai | SM/04812 | 2176/MD | PRADIP KUMAR SAHA | 17-12-2021 | 16-01-2022 | |
332 | PASCHIM MEDINIPUR | Ground Water Supply Based Piped Water Supply Scheme for Kharika | SM/05046 | SM/08214 | 340/MD | BANERJEE CONSTRUCTION | 24-02-2021 | 05-04-2021 |
333 | PASCHIM MEDINIPUR | Harekrishnapur Piped Water Supply Scheme | SM/05148 | SM/06899 | 1430/MD | DIPAK KUMAR DOLAI | 26-11-2020 | 25-05-2021 |
334 | PASCHIM MEDINIPUR | HARINASULI & ADJOINING MOUJAS PWSS | SM/13085 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
335 | PASCHIM MEDINIPUR | HATKATA AND ITS ADJOINING MOUZAS PWSS | SM/15592 | 2955/MD | M/S. D.K.H.CONSTRUCTION | 17-08-2023 | 13-02-2024 | |
336 | PASCHIM MEDINIPUR | Hemantapur & its adjoining mouzas Water Supply Scheme, Block - Ghatal, Dist.- Paschim Medinipur. | SM/15011 | 707/MD | SUBRATA DAS | 12-03-2024 | 08-09-2024 | |
337 | PASCHIM MEDINIPUR | IRPALA Piped Water Supply Scheme. | SM/07386 | 1677/MD | DULAL CHANDRA DAS | 12-08-2022 | 26-09-2022 | |
338 | PASCHIM MEDINIPUR | JAGANATH CHAK AND ITS ADJOINING MOUZAS PWSS | SM/18583 | 3101/MD | GOBINDA MAITY | 25-08-2023 | 22-03-2024 | |
339 | PASCHIM MEDINIPUR | Jagul Piped Water Supply Scheme | SM/05339 | 1468/MD | DULAL CHANDRA DAS | 07-09-2021 | 28-09-2021 | |
340 | PASCHIM MEDINIPUR | Jagul Piped Water Supply Scheme | SM/05339 | 1468/MD | DULAL CHANDRA DAS | 07-09-2021 | 28-09-2021 | |
341 | PASCHIM MEDINIPUR | JALIMANDA AND IT'S ADJOINING MOUJAS PWSS | SM/13087 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
342 | PASCHIM MEDINIPUR | JAMUNA AND ADJOINING MOUJAS PWSS | SM/13056 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
343 | PASCHIM MEDINIPUR | JHARBHANGA AND ADJOINING MOUJAS PWSS | SM/14652 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
344 | PASCHIM MEDINIPUR | JHETA JAMBONI PIPED WATER SUPPLY SCHEME | SM/13806 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
345 | PASCHIM MEDINIPUR | Julkapur and Adj. Mouzas Water Supply Scheme | SM/03061 | SM/06929 | 1454/MD | SUNIL DULE | 26-11-2020 | 25-05-2021 |
346 | PASCHIM MEDINIPUR | Julkapur and Adj. Mouzas Water Supply Scheme | SM/03061 | 1454/MD | SUNIL DULE | 26-11-2020 | 25-05-2021 | |
347 | PASCHIM MEDINIPUR | KADAM BANDHI AND ADJOINING MOUJAS PWSS | SM/13058 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
348 | PASCHIM MEDINIPUR | KADAM DIHA AND ADJOINING MOUJAS PWSS | SM/15012 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
349 | PASCHIM MEDINIPUR | KADRA AND ADJOINING MOUJAS PWSS | SM/13144 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
350 | PASCHIM MEDINIPUR | KALAGRAM AND ITS ADJOINING MOUZAS PWSS | SM/15013 | 947/MD | DULAL CHANDRA DAS | 06-04-2023 | 03-10-2023 | |
351 | PASCHIM MEDINIPUR | KALAIKUNDA MOUZA WATER SUPPLY SCHEME | SM/00457 | SM/13822 | 2411/MD | ASHIM KUMAR DEY | 25-11-2022 | 24-05-2023 |
352 | PASCHIM MEDINIPUR | Kalara Piped Water Supply Scheme, Block - Daspur-I, Dist.- Paschim Medinipur. | SM/18502 | 2953/MD | GOBINDA MAITY | 17-08-2023 | 13-02-2024 | |
353 | PASCHIM MEDINIPUR | Kanchangeria Piped Water Supply Scheme | SM/06053 | SM/09085 | 1012/MD | M/S. A.R. ENTERPRISE. | 27-05-2022 | 26-06-2022 |
354 | PASCHIM MEDINIPUR | KANKRA SIBRAM AND ITS ADJOINING MOUJAS PWSS | SM/13089 | 5061/MD | ANIRUDDHA BAG | 26-10-2023 | 23-04-2024 | |
355 | PASCHIM MEDINIPUR | Kapasd and Adjoining Mouzas New Piped Water Supply Scheme | SM/03243 | SM/06923 | 1453/MD | ARABINDA GHOSH | 26-11-2020 | 25-05-2021 |
356 | PASCHIM MEDINIPUR | KARNAGAR AND ADJOINING MAOUJAS PWSS | SM/13001 | 3097/MD | PULLOCK KUMAR GHOSH | 25-08-2023 | 24-10-2023 | |
357 | PASCHIM MEDINIPUR | KARSA AND ADJOINING MOUJAS PWSS | SM/13090 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
358 | PASCHIM MEDINIPUR | KASBA NARAYANGARH AND ADJOINING MOUJAS PWSS | SM/19100 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
359 | PASCHIM MEDINIPUR | KASHBA AND ITS ADJOINING MOUZAS PWSS | SM/14653 | 2147/MD | A.J. ENTERPRISE | 08-06-2023 | 05-12-2023 | |
360 | PASCHIM MEDINIPUR | KASHBAASANDA AND ADJOINING MOUJAS PWSS at Narayangrah under Midnapore Division P.H.E.Dte. | SM/12331 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
361 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | SM/09705 | 653/AE/MSSD | MAITY ENTERPRISE | 14-12-2021 | 29-12-2021 |
362 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | SM/09705 | 657/AE/MSSD | MAITY ENTERPRISE | 17-12-2021 | 01-01-2022 |
363 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | SM/09705 | 656/AE/MSSD | MAITY ENTERPRISE | 17-12-2021 | 01-01-2022 |
364 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | 532/AE/MSSD | MAITY ENTERPRISE | 30-09-2021 | 15-10-2021 | |
365 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | SM/09705 | 649/AE/MSSD | MAITY ENTERPRISE | 14-12-2021 | 29-12-2021 |
366 | PASCHIM MEDINIPUR | Kashijora Piped Water Supply Scheme | SM/05559 | SM/09705 | 171/MD | M/S. EL-CON | 01-02-2022 | 22-02-2022 |
367 | PASCHIM MEDINIPUR | KASHIPUR AND ADJOINING MOUJAS PWSS | SM/15014 | 2524/MD | NABA KUMAR BHUNIA | 18-07-2023 | 13-02-2024 | |
368 | PASCHIM MEDINIPUR | KATAI AND IT'S ADJOINING MOUJAS PWSS | SM/13088 | 2145/MD | GOBINDA MAITY | 08-06-2023 | 04-01-2024 | |
369 | PASCHIM MEDINIPUR | Katan Piped Water Supply Scheme | SM/05135 | SM/06900 | 149/AE/GSD | DEVJYOTI BERA | 21-02-2023 | 23-03-2023 |
370 | PASCHIM MEDINIPUR | Katan Piped Water Supply Scheme | SM/05135 | SM/06900 | 1447/MD | SHAKEEL KHAN | 26-11-2020 | 25-05-2021 |
371 | PASCHIM MEDINIPUR | Keot Khalisa Water Supply Scheme | SM/01862 | SM/09723 | 28/MD | SUNIL DULE | 07-01-2022 | 28-01-2022 |
372 | PASCHIM MEDINIPUR | KESHIA AND ADJOINING MOUJAS PWSS | SM/13124 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
373 | PASCHIM MEDINIPUR | KESHIARI WATER SUPPLY SCHEME | SM/00749 | SM/08324 | 429/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 |
374 | PASCHIM MEDINIPUR | KESHIARI WATER SUPPLY SCHEME | SM/00749 | SM/10124 | 1734/MD | M/S. A.R. ENTERPRISE. | 23-08-2022 | 19-02-2023 |
375 | PASCHIM MEDINIPUR | KESHPUR WATER SUPPLY SCHEME | SM/00761 | SM/09979 | 1722/MD | M/S. A.R. ENTERPRISE. | 22-08-2022 | 18-02-2023 |
376 | PASCHIM MEDINIPUR | KHAIRULLACHAK WATER SUPPLY SCHEME | SM/01105 | SM/09431 | 605/MD | BANERJEE CONSTRUCTION | 04-04-2022 | 01-10-2022 |
377 | PASCHIM MEDINIPUR | Khamra PWSS, Block-Debra, Dist-Paschim Medinipur | SM/13026 | 2145/MD | GOBINDA MAITY | 08-06-2023 | 04-01-2024 | |
378 | PASCHIM MEDINIPUR | KHANAMOHAN AND IT'S ADJOINING MOUJAS PWSS | SM/13024 | 2145/MD | GOBINDA MAITY | 08-06-2023 | 04-01-2024 | |
379 | PASCHIM MEDINIPUR | KHARIKA AND ITS ADJOINING MOUZAS PWSS | SM/15015 | 2421/MD | BANERJEE CONSTRUCTION | 13-07-2023 | 09-01-2024 | |
380 | PASCHIM MEDINIPUR | KHAS JANGAL PIPED WATER SUPPLY SCHEME | SM/14506 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
381 | PASCHIM MEDINIPUR | Khasbar Piped Water Supply Scheme | SM/05479 | SM/09086 | 2187/MD | M/S. D.K.H.CONSTRUCTION | 17-12-2021 | 31-01-2022 |
382 | PASCHIM MEDINIPUR | Khasbar Piped Water Supply Scheme | SM/05479 | SM/09086 | 29/MD | S.T. ENTERPRISE | 07-01-2022 | 06-02-2022 |
383 | PASCHIM MEDINIPUR | KHIRISH MUL AND ITS ADJOINING MOUZAS PWSS | SM/18525 | 3148/MD | BANERJEE CONSTRUCTION | 29-08-2023 | 25-02-2024 | |
384 | PASCHIM MEDINIPUR | KHURSI AND ADJOINING MOUJAS PWSS | SM/13126 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
385 | PASCHIM MEDINIPUR | KONTORE AND ADJOINING MOUJAS PWSS | SM/13113 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
386 | PASCHIM MEDINIPUR | Krishnapriya Piped Water Supply Scheme | SM/06010 | SM/09707 | 839/MD | ANUSKA ENTERPRISE | 02-05-2022 | 01-06-2022 |
387 | PASCHIM MEDINIPUR | KUBIR CHAK PIPED WATER SUPPLY SCHEME | SM/14484 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
388 | PASCHIM MEDINIPUR | KUILABAD AND ADJOINING MOUJAS PWSS at Garbeta-I Block. | SM/12335 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
389 | PASCHIM MEDINIPUR | KUMARSANDA AND IT'S ADJOINING MOUJAS PWSS | SM/14939 | 2145/MD | GOBINDA MAITY | 08-06-2023 | 04-01-2024 | |
390 | PASCHIM MEDINIPUR | KUNARPUR AND ADJOINING MOUJAS PWSS | SM/13122 | 2827/MD | S & P ENTERPRISE | 07-08-2023 | 04-03-2024 | |
391 | PASCHIM MEDINIPUR | Kuran & its adjoining mouzas Water Supply Scheme, Block - Ghatal, Dist.- Paschim Medinipur. | SM/15017 | 577/MD | SUJATA CONSTRUCTION | 23-02-2023 | 22-08-2023 | |
392 | PASCHIM MEDINIPUR | Kurul Piped Water Supply Scheme | SM/06054 | 2001/MD | M/S. EL-CON | 01-12-2021 | 31-12-2021 | |
393 | PASCHIM MEDINIPUR | Kurul Piped Water Supply Scheme | SM/06054 | SM/09710 | 2001/MD | M/S. EL-CON | 01-12-2021 | 31-12-2021 |
394 | PASCHIM MEDINIPUR | KUSUMDAHARI PIPED WATER SUPPLY SCHEME | SM/18531 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
395 | PASCHIM MEDINIPUR | KUTKI AND ADJOINING MOUJAS PWSS | SM/15016 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
396 | PASCHIM MEDINIPUR | LOYADA AND ITS ADJOINING MOUJAS PWSS | SM/12992 | 2824/MD | MADE AND TRADE CO. | 07-08-2023 | 04-03-2024 | |
397 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 2035/MD | RITESH AGARWALL | 01-07-2024 | 31-07-2024 |
398 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 533/AE/KSD | HYDRO TECH ASSOCIATES | 17-12-2021 | 16-01-2022 | |
399 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 536/AE/KSD | FUTURE CONSTRUCTION | 17-12-2021 | 16-01-2022 |
400 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 541/AE/KSD | M/S. SUBHAS CHANDRA KUNDU | 17-12-2021 | 16-01-2022 |
401 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 539/AE/KSD | SAJAL JANA | 17-12-2021 | 16-01-2022 | |
402 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 538/AE/KSD | M/S. BLUE BIRD | 17-12-2021 | 16-01-2022 | |
403 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 532/AE/KSD | ADITYA ENTERPRISE | 17-12-2021 | 16-01-2022 | |
404 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 537/AE/KSD | RITESH AGARWALL | 17-12-2021 | 16-01-2022 | |
405 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 540/AE/KSD | SUJOY RANJAN BHOWMICK | 17-12-2021 | 16-01-2022 | |
406 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 534/AE/KSD | OM UDYUG | 17-12-2021 | 16-01-2022 |
407 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 542/AE/KSD | M/S SARADA CONSTRUCTION | 17-12-2021 | 16-01-2022 | |
408 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 535/AE/KSD | R. CONSTRUCTION | 17-12-2021 | 16-01-2022 |
409 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | SM/09432 | 342/MD | UTTAM KUMAR DAS | 31-01-2023 | 01-04-2023 |
410 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 543/AE/KSD | S.K. CONSTRUCTION | 17-12-2021 | 16-01-2022 | |
411 | PASCHIM MEDINIPUR | LUTUNIA (TEMATHANI) WATER SUPPLY SCHEME | SM/00448 | 531/AE/KSD | BOSE & CO. | 17-12-2021 | 16-01-2022 | |
412 | PASCHIM MEDINIPUR | MADHABPUR AND IT'S ADJOINING MOUJAS PWSS | SM/17622 | 2824/MD | MADE AND TRADE CO. | 07-08-2023 | 04-03-2024 | |
413 | PASCHIM MEDINIPUR | MADPUR WATER SUPPLY SCHEME | SM/01101 | SM/08319 | 429/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 |
414 | PASCHIM MEDINIPUR | MADPUR WATER SUPPLY SCHEME | SM/01101 | 1465/MD | DULAL CHANDRA DAS | 07-09-2021 | 06-11-2021 | |
415 | PASCHIM MEDINIPUR | MAHASOL AND ADJOINING MOUJAS PWSS | SM/14036 | 2717/MD | M/S. D.K.H.CONSTRUCTION | 31-07-2023 | 29-09-2023 | |
416 | PASCHIM MEDINIPUR | MAHASOL AND ADJOINING MOUJAS PWSS | SM/14036 | 2872/MD | DEBJIT PATRA | 10-08-2023 | 24-09-2023 | |
417 | PASCHIM MEDINIPUR | Makarampur Piped Water Supply Scheme, Block - Daspur-I, Dist.- Paschim Medinipur. | SM/18586 | 5090/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 30-10-2023 | 27-04-2024 | |
418 | PASCHIM MEDINIPUR | Malara Piped Water Supply Scheme | SM/06303 | 383/MD | PULLOCK KUMAR GHOSH | 25-02-2021 | 27-03-2021 | |
419 | PASCHIM MEDINIPUR | MALIHATI AND IT'S ADJOINING MOUJAS PWSS | SM/16615 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
420 | PASCHIM MEDINIPUR | MANIBPUR & ITS ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME. | SM/14493 | 2538/MD | SUJATA CONSTRUCTION | 19-07-2023 | 15-01-2024 | |
421 | PASCHIM MEDINIPUR | Manidaha Piped Water Supply Scheme | SM/05338 | SM/09703 | 873/MD | DIPAK KUMAR BAKLY | 10-05-2022 | 24-06-2022 |
422 | PASCHIM MEDINIPUR | MANSINGHA AND IT'S ADJOINING MOUJAS PWSS | SM/14002 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
423 | PASCHIM MEDINIPUR | MARKHA AND ITS ADJOINING MOUZAS PWSS | SM/15593 | 2923/MD | DULAL CHANDRA DAS | 16-08-2023 | 12-02-2024 | |
424 | PASCHIM MEDINIPUR | MARKUNDA AND ADJOINING MOUJAS PWSS | SM/13098 | 2524/MD | NABA KUMAR BHUNIA | 18-07-2023 | 13-02-2024 | |
425 | PASCHIM MEDINIPUR | MOHANPUR & ADJOINING MOUJAS PWSS | SM/13028 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
426 | PASCHIM MEDINIPUR | Mohanpur Piped Water Supply Scheme | SM/05164 | SM/06905 | 1445/MD | M/S. D.K.H.CONSTRUCTION | 26-11-2020 | 25-05-2021 |
427 | PASCHIM MEDINIPUR | Mohanpur Piped Water Supply Scheme | SM/05164 | 1445/MD | M/S. D.K.H.CONSTRUCTION | 26-11-2020 | 25-05-2021 | |
428 | PASCHIM MEDINIPUR | MOHANPUR WATER SUPPLY SCHEME | SM/01099 | SM/10839 | 1961/MD | GOBINDA MAITY | 20-09-2022 | 19-03-2023 |
429 | PASCHIM MEDINIPUR | MOHANPUR WATER SUPPLY SCHEME | SM/01099 | SM/10839 | 1688/MD | GOBINDA MAITY | 16-08-2022 | 12-02-2023 |
430 | PASCHIM MEDINIPUR | Monoharpur Piped Water Supply Scheme. | SM/10017 | 2190/MD | JDJ ENTERPRISE (A UNIT OF JDJ TRADERS PRIVATE LIMITED) | 01-11-2022 | 30-04-2023 | |
431 | PASCHIM MEDINIPUR | Mugbasan Piped Water Supply Scheme | SM/06057 | SM/08218 | 2535/MD | MIDNAPUR PIPE CONCERN | 12-12-2022 | 11-01-2023 |
432 | PASCHIM MEDINIPUR | Mugbasan Piped Water Supply Scheme | SM/06057 | 1065/MD | MIDNAPUR PIPE CONCERN | 02-07-2021 | 01-08-2021 | |
433 | PASCHIM MEDINIPUR | MURAKATA AND ADJOINING MOUJAS PWSS | SM/13100 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
434 | PASCHIM MEDINIPUR | MURAKATA AND ADJOINING MOUJAS PWSS | SM/13100 | 2827/MD | S & P ENTERPRISE | 07-08-2023 | 04-03-2024 | |
435 | PASCHIM MEDINIPUR | MURAKATI AND ADJOINING MOUJAS PWSS | SM/14004 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
436 | PASCHIM MEDINIPUR | MURARI AND ADJOINING MOUJAS PWSS | SM/15021 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
437 | PASCHIM MEDINIPUR | Nabin Maheshpur Piped Water Supply Scheme | SM/05550 | SM/09081 | 2419/MD | DIPAK KUMAR DOLAI | 28-11-2022 | 12-01-2023 |
438 | PASCHIM MEDINIPUR | Nabin Maheshpur Piped Water Supply Scheme | SM/05550 | SM/09081 | 608/MD | DIPAK KUMAR DOLAI | 04-04-2022 | 01-10-2022 |
439 | PASCHIM MEDINIPUR | NAHARPUR AND ADJOINING MOUJAS PWSS | SM/15024 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
440 | PASCHIM MEDINIPUR | NARASINGHAPUR AND ITS ADJOINING MOUZAS PWSS | SM/15025 | 2146/MD | A.J. ENTERPRISE | 08-06-2023 | 05-12-2023 | |
441 | PASCHIM MEDINIPUR | NARMA AND ADJOINING MOUJAS PWSS | SM/18229 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
442 | PASCHIM MEDINIPUR | NAYA BASAT AND ADJOINING MOUJAS PWSS | SM/14130 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
443 | PASCHIM MEDINIPUR | NAYAPUKUR AND ADJOINING MOUJAS PWSS | SM/13102 | 2827/MD | S & P ENTERPRISE | 07-08-2023 | 04-03-2024 | |
444 | PASCHIM MEDINIPUR | NERASOL AND ADJOINING MOUJAS PWSS | SM/13103 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
445 | PASCHIM MEDINIPUR | NIJPAPAN AND ITS ADJOINING MOUJAS PWSS | SM/17619 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
446 | PASCHIM MEDINIPUR | NILDA ZONE 1 PIPED WATER SUPPLY SCHEME OF MOHANPUR BLOCK UNDER MIDNAPUR DIVISION | SM/17565 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
447 | PASCHIM MEDINIPUR | NILDA ZONE 2 PIPED WATER SUPPLY SCHEME OF MOHANPUR BLOCK UNDER MEDINIPUR DIVISION | SM/17566 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
448 | PASCHIM MEDINIPUR | Nona Madhabchak Piped Water Supply Scheme | SM/05628 | 2016/MD | DULAL CHANDRA DAS | 03-12-2021 | 01-02-2022 | |
449 | PASCHIM MEDINIPUR | PAKURSENI AND ADJOINING MOUJAS PWSS | SM/13104 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
450 | PASCHIM MEDINIPUR | PALAIBANI AND ADJOINING MOUJAS PWSS | SM/15026 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
451 | PASCHIM MEDINIPUR | PALASIA AND ADJOINING MOUJAS PWSS | SM/13168 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
452 | PASCHIM MEDINIPUR | Panna Piped Water Supply Scheme. | SM/10065 | 2673/MD | CHAKRABORTTI ENTERPRISE | 30-12-2022 | 28-06-2023 | |
453 | PASCHIM MEDINIPUR | Panna Piped Water Supply Scheme. | SM/10065 | 2186/MD | S.N ENTERPRISE | 01-11-2022 | 31-12-2022 | |
454 | PASCHIM MEDINIPUR | Paschim Beguni Piped Water Supply Scheme | SM/05560 | 2002/MD | M/S. EL-CON | 01-12-2021 | 22-12-2021 | |
455 | PASCHIM MEDINIPUR | PASCHIM PATHRI WATER SUPPLY SCHEME | SM/00853 | SM/08676 | 2169/MD | MAITY ENTERPRISE | 17-12-2021 | 15-02-2022 |
456 | PASCHIM MEDINIPUR | PATHARTERIA AND ADJOINING MOUJAS PWSS | SM/13106 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
457 | PASCHIM MEDINIPUR | PATNA PWSS, BLOCK - DEBRA, PASCHIM MEDINIPUR | SM/13031 | 2824/MD | MADE AND TRADE CO. | 07-08-2023 | 04-03-2024 | |
458 | PASCHIM MEDINIPUR | PELAGERYA & ITS ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME. | SM/16378 | 2952/MD | A.J. ENTERPRISE | 17-08-2023 | 13-02-2024 | |
459 | PASCHIM MEDINIPUR | PERUABAD AND ADJOINING MOUJAS PWSS | SM/13107 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
460 | PASCHIM MEDINIPUR | PIASALA AND ADJOINING MOUJAS PWSS | SM/14628 | 936/MD | ANNAPURNA TUBEWELL WORKS | 04-04-2023 | 19-05-2023 | |
461 | PASCHIM MEDINIPUR | PIASALA AND ADJOINING MOUJAS PWSS | SM/14628 | 937/MD | J.K. BUILDERS | 04-04-2023 | 03-06-2023 | |
462 | PASCHIM MEDINIPUR | PIASALA AND ADJOINING MOUJAS PWSS | SM/14628 | 938/MD | GOUTAM RAY | 04-04-2023 | 03-06-2023 | |
463 | PASCHIM MEDINIPUR | PIASALA AND ADJOINING MOUJAS PWSS | SM/14628 | 1435/MD | M/S. D.K.H.CONSTRUCTION | 04-05-2023 | 03-07-2023 | |
464 | PASCHIM MEDINIPUR | PINGLA WATER SUPPLY SCHEME | SM/01102 | SM/09999 | 1311/MD | GOBINDA MAITY | 30-06-2022 | 27-12-2022 |
465 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Bishnupur & adj. mouzas. | SM/03296 | 310/MD | KISHORE GHOSH | 22-02-2021 | 03-04-2021 | |
466 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Abasgarh mouza | SM/03145 | 101/AE/MSSD | WATER LINK | 24-02-2021 | 11-03-2021 | |
467 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Abasgarh mouza | SM/03145 | SM/16296 | 723/MD | WATER LINK | 09-03-2023 | 13-04-2023 |
468 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Adasimla & Adj. Mouza | SM/03568 | SM/06897 | 686/MD | SAI TUBE CO. | 03-05-2021 | 17-06-2021 |
469 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Adasimla & Adj. Mouza | SM/03568 | SM/06897 | 1462/MD | SAI TUBE CO. | 26-11-2020 | 25-05-2021 |
470 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Barsahara & adj. mouzas | SM/03820 | SM/06926 | 1467/MD | DULAL CHANDRA DAS | 26-11-2020 | 25-05-2021 |
471 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Chatra Mouza | SM/03471 | 392/MD | SUNIL DULE | 25-02-2021 | 12-03-2021 | |
472 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Dhengasole Mouza | SM/03476 | 98/AE/MSSD | CHANDAN YADAV | 24-02-2021 | 11-03-2021 | |
473 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Dhengasole Mouza | SM/03476 | 100/AE/MSSD | CHANDAN YADAV | 24-02-2021 | 11-03-2021 | |
474 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Dhengasole Mouza | SM/03476 | 99/AE/MSSD | CHANDAN YADAV | 24-02-2021 | 11-03-2021 | |
475 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Gobardhanpur & Adjoining Mouzas | SM/03744 | SM/06916 | 1432/MD | DIPAK KUMAR BAKLY | 26-11-2020 | 25-05-2021 |
476 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Gobardhanpur & Adjoining Mouzas | SM/03744 | SM/06916 | 313/MD | DIPAK KUMAR BAKLY | 22-02-2021 | 24-03-2021 |
477 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Hatimasan Mouza | SM/03486 | SM/08678 | 2247/MD | NIMAI HAZRA | 28-12-2021 | 12-01-2022 |
478 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Jatra & Banshiroysol Mouza | SM/03481 | SM/08206 | 320/MD | PULLOCK KUMAR GHOSH | 17-02-2022 | 18-04-2022 |
479 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Jatra & Banshiroysol Mouza | SM/03481 | SM/08206 | 2382/MD | PULLOCK KUMAR GHOSH | 23-11-2022 | 03-12-2022 |
480 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Kalaimuri Mouza | SM/03461 | SM/08215 | 2248/MD | NIMAI HAZRA | 28-12-2021 | 11-02-2022 |
481 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Kalshibhanga Mouza | SM/03477 | SM/09419 | 420/MD | CHANDAN YADAV | 04-03-2022 | 25-03-2022 |
482 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Keudi Mouza | SM/03489 | SM/09417 | 2174/MD | DEBJIT PATRA | 17-12-2021 | 07-01-2022 |
483 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Khasbazar & Adj. Mouzas | SM/03584 | SM/06925 | 1460/MD | SUBRATA DAS | 26-11-2020 | 25-05-2021 |
484 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Khasbazar & Adj. Mouzas | SM/03584 | SM/06925 | 420/MD | SUBRATA DAS | 26-02-2021 | 12-04-2021 |
485 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Maliara & Its Adj. Mouzas | SM/03667 | SM/06898 | 1426/MD | M/S. EL-CON | 26-11-2020 | 25-05-2021 |
486 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Maliara & Its Adj. Mouzas | SM/03667 | SM/06898 | 481/AE/MSSD | HIRAK KUMAR GHOSH | 08-08-2023 | 18-08-2023 |
487 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Maliara & Its Adj. Mouzas | SM/03667 | SM/06898 | 482/AEMSSD | HIRAK KUMAR GHOSH | 08-08-2023 | 18-08-2023 |
488 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Narayanbar & Adj. Mouzas | SM/03581 | SM/06896 | 1457/MD | BANERJEE CONSTRUCTION | 26-11-2020 | 25-05-2021 |
489 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Nayagram & its Adj. Mouzas | SM/03719 | SM/15092 | 1478/MD | SANJIT SINHA | 08-09-2021 | 23-09-2021 |
490 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Nayagram & its Adj. Mouzas | SM/03719 | 1478/MD | SANJIT SINHA | 08-09-2021 | 23-09-2021 | |
491 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Nayagram & its Adj. Mouzas | SM/03719 | 422/MD | SANJIT SINHA | 26-02-2021 | 28-03-2021 | |
492 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Panpara & Adj. Mouzas | SM/03574 | SM/06924 | 1456/MD | BANERJEE CONSTRUCTION | 26-11-2020 | 25-05-2021 |
493 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Pathra Mouza | SM/03460 | SM/08204 | 423/MD | SANJIT SINHA | 26-02-2021 | 28-03-2021 |
494 | PASCHIM MEDINIPUR | PIPED WATER SUPPLY SCHEME FOR RANIAR AND IT'S ADJOINING MOUZAS | SM/13032 | 2420/MD | BANERJEE CONSTRUCTION | 13-07-2023 | 09-01-2024 | |
495 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Sartla & Adj. Mouzas | SM/03575 | SM/06933 | 375/MD | GOBINDA MAITY | 25-02-2021 | 27-03-2021 |
496 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Sartla & Adj. Mouzas | SM/03575 | SM/06933 | 1455/MD | GOBINDA MAITY | 26-11-2020 | 25-05-2021 |
497 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Shyamsundarpur & Adj. Mouzas | SM/03566 | 64/A/WC | M/S. A.R. ENTERPRISE. | 07-05-2020 | 15-01-2027 | |
498 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Sitanathpur Mouza | SM/03470 | SM/08208 | 184/MD | DEBJIT PATRA | 01-02-2022 | 18-03-2022 |
499 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Sutkujhuri Mouza | SM/03483 | 393/MD | SUNIL DULE | 25-02-2021 | 12-03-2021 | |
500 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Sutkujhuri Mouza | SM/03483 | SM/08205 | 281/MD | MANISHIKA CONSTRUCTION | 15-02-2022 | 17-03-2022 |
501 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Ukhla Mouza | SM/03463 | 107/AE/MSSD | AJIJUR RAHAMAN MALLICK | 26-02-2021 | 13-03-2021 | |
502 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Ukhla Mouza | SM/03463 | 106/AE/MSSD | AJIJUR RAHAMAN MALLICK | 26-02-2021 | 13-03-2021 | |
503 | PASCHIM MEDINIPUR | Piped Water Supply Scheme for Ukhla Mouza | SM/03463 | SM/08211 | 282/MD | GOUTAM RAY | 15-02-2022 | 16-04-2022 |
504 | PASCHIM MEDINIPUR | Pirakata w/s scheme | SM/02702 | SM/09107 | 2175/MD | SANJIT SINHA | 17-12-2021 | 31-01-2022 |
505 | PASCHIM MEDINIPUR | Pirakata w/s scheme | SM/02702 | SM/09107 | 675/AE/MSSD | DEBJIT PATRA | 24-12-2021 | 08-01-2022 |
506 | PASCHIM MEDINIPUR | PIRRAKULI AND ADJOINING MOUJAS PWSS | SM/15028 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
507 | PASCHIM MEDINIPUR | Pratappur Piped Water Supply Scheme | SM/05132 | 372/MD | SUBHASIS DOLAI | 25-02-2021 | 12-03-2021 | |
508 | PASCHIM MEDINIPUR | Pratappur Piped Water Supply Scheme | SM/05132 | 2681/MD | DIPAK KUMAR DOLAI | 30-12-2022 | 13-02-2023 | |
509 | PASCHIM MEDINIPUR | Pratappur Piped Water Supply Scheme | SM/05132 | 1240/MD | DIPAK KUMAR DOLAI | 20-06-2022 | 11-07-2022 | |
510 | PASCHIM MEDINIPUR | Pratappur Piped Water Supply Scheme | SM/05132 | 1445/MD | DIPAK KUMAR DOLAI | 03-09-2021 | 02-11-2021 | |
511 | PASCHIM MEDINIPUR | PUKHARIA SOL AND ADJOINING MOUJAS PWSS | SM/15029 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
512 | PASCHIM MEDINIPUR | PUNDRA AND ADJOINING MOUJAS PWSS | SM/13169 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
513 | PASCHIM MEDINIPUR | Purulda Piped Water Supply Scheme | SM/05341 | 1466/MD | BANERJEE CONSTRUCTION | 07-09-2021 | 06-11-2021 | |
514 | PASCHIM MEDINIPUR | PWS Scheme for Dharmma & Adj. mouzas | SM/02885 | SM/09721 | 2188/MD | M/S. D.K.H.CONSTRUCTION | 17-12-2021 | 15-02-2022 |
515 | PASCHIM MEDINIPUR | PWS Scheme for Rajnagar (Paschim) and adj. mouzas | SM/02897 | 1444/MD | BANERJEE CONSTRUCTION | 26-11-2020 | 25-05-2021 | |
516 | PASCHIM MEDINIPUR | RADHA KANTAPUR AND IT'S ADJOINING MOUJAS | SM/13034 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
517 | PASCHIM MEDINIPUR | RADHABALLABHPUR PIPED WATER SUPPLY SCHEME | SM/12997 | 578/MD | DULAL CHANDRA DAS | 23-02-2023 | 22-08-2023 | |
518 | PASCHIM MEDINIPUR | RADHAKISHOR AND ITS ADJOINING MOUZAS PWSS | SM/18526 | 4000/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 06-10-2023 | 03-04-2024 | |
519 | PASCHIM MEDINIPUR | RADHAMOHANPUR-II AND ITS ADJOINING MOUJAS PWSS | SM/14940 | 2824/MD | MADE AND TRADE CO. | 07-08-2023 | 04-03-2024 | |
520 | PASCHIM MEDINIPUR | RADHANAGAR AND ADJOINING MOUJAS PWSS | SM/13217 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
521 | PASCHIM MEDINIPUR | Raghunath Chak Piped Water Supply Scheme | SM/05144 | 1472/MD | GOBINDA MAITY | 26-11-2020 | 25-05-2021 | |
522 | PASCHIM MEDINIPUR | Raghunath Chak Piped Water Supply Scheme | SM/05144 | SM/14480 | 451/MD | MASUM ALI KHAN | 13-02-2023 | 14-04-2023 |
523 | PASCHIM MEDINIPUR | RAMCHANDRAPUR AND ITS ADJOINING MOUJAS PWSS | SM/13035 | 3822/MD | ASIS KUMAR SARANGI | 20-09-2023 | 18-03-2024 | |
524 | PASCHIM MEDINIPUR | RANIRBAZAR WATER SUPPLY SCHEME | SM/00780 | SM/09585 | 606/MD | M/S. A.R. ENTERPRISE. | 04-04-2022 | 01-10-2022 |
525 | PASCHIM MEDINIPUR | RERIPUR AND ADJ0INING MOUJAS PWSS | SM/18530 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
526 | PASCHIM MEDINIPUR | RUPARGHAGRA AND ADJOINING MOUJAS PWSS | SM/13108 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
527 | PASCHIM MEDINIPUR | SABANG WATER SUPPLY SCHEME | SM/00459 | 2186/MD | MASUM ALI KHAN | 17-12-2021 | 31-01-2022 | |
528 | PASCHIM MEDINIPUR | SABANG WATER SUPPLY SCHEME | SM/00459 | SM/09087 | 2186/MD | MASUM ALI KHAN | 17-12-2021 | 31-01-2022 |
529 | PASCHIM MEDINIPUR | Sabra Piped Water Supply Scheme. | SM/11460 | 2273/MD | GOBINDA MAITY | 09-11-2022 | 08-05-2023 | |
530 | PASCHIM MEDINIPUR | SAIYADPUR AND ADJOINING MOUJAS PWSS | SM/17996 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
531 | PASCHIM MEDINIPUR | SALIKOTHA AND ADJOINING MOUJAS PWSS | SM/13171 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
532 | PASCHIM MEDINIPUR | SAMSARA ZONE 1 PIPED WATER SUPPLY SCHEME OF MOHANPUR BLOCK UNDER MEDINIPUR DIVISION | SM/17568 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
533 | PASCHIM MEDINIPUR | SAMSARA ZONE 2 PIPED WATER SUPPLY SCHEME OF MOHANPUR BLOCK UNDER MEDINIPUR DIVISION | SM/17569 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
534 | PASCHIM MEDINIPUR | SARANG AND ADJOINING MOUJAS PWSS | SM/13809 | 1355/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 02-05-2023 | 26-02-2024 | |
535 | PASCHIM MEDINIPUR | SARTA-SIJUA WATER SUPPLY SCHEME | SM/00439 | SM/09455 | 1958/MD | PROVAT KUMAR DE | 20-09-2022 | 19-03-2023 |
536 | PASCHIM MEDINIPUR | SASHA BEDIA AND ADJOINING MOUJAS PWSS | SM/18001 | 975/MD | J.K. BUILDERS | 10-04-2023 | 09-06-2023 | |
537 | PASCHIM MEDINIPUR | SASHA BEDIA AND ADJOINING MOUJAS PWSS | SM/18001 | 2522/MD | S.N ENTERPRISE | 18-07-2023 | 16-09-2023 | |
538 | PASCHIM MEDINIPUR | SASHA BEDIA AND ADJOINING MOUJAS PWSS | SM/18001 | 2808/MD | CHANDAN ROY | 07-08-2023 | 06-10-2023 | |
539 | PASCHIM MEDINIPUR | SATKUI WATER SUPPLY SCHEME | SM/01153 | 415/MD | DULAL CHANDRA DAS | 26-02-2021 | 28-03-2021 | |
540 | PASCHIM MEDINIPUR | SATKUI WATER SUPPLY SCHEME | SM/01153 | SM/08320 | 429/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 |
541 | PASCHIM MEDINIPUR | SATYAPUR AND IT'S ADJOINING MOUJAS PWSS | SM/13038 | 2821/MD | GOBINDA MAITY | 07-08-2023 | 01-08-2024 | |
542 | PASCHIM MEDINIPUR | Sauri Kotbar Piped Water Supply Scheme | SM/05557 | SM/08216 | 581/MD | DIPAK KUMAR BAKLY | 23-02-2023 | 25-03-2023 |
543 | PASCHIM MEDINIPUR | Sauri Kotbar Piped Water Supply Scheme | SM/05557 | 425/MD | TARUN KUMAR BHATTACHARYA | 26-02-2021 | 07-04-2021 | |
544 | PASCHIM MEDINIPUR | Sautia (Zone-I) Water Supply Scheme, Block - Mohanpur, Dist.- Paschim Medinipur. | SM/17572 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
545 | PASCHIM MEDINIPUR | Sautia (Zone-II) Water Supply Scheme, Block - Mohanpur, Dist.- Paschim Medinipur. | SM/17573 | 5070/MD | NATIONAL PROJECTS CONSTRUCTION CORPORATION LIMITED | 26-10-2023 | 22-06-2024 | |
546 | PASCHIM MEDINIPUR | SHAKHA BAI AND ADJOINING MOUJAS PWSS | SM/13220 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
547 | PASCHIM MEDINIPUR | SHAL DAHARA AND ADJOINING MOUJAS PWWSS | SM/18013 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
548 | PASCHIM MEDINIPUR | Shanrpur and Adj. Mouzas Piped Water Supply Scheme | SM/03187 | 305/MD | UCON | 22-02-2021 | 03-04-2021 | |
549 | PASCHIM MEDINIPUR | Shanrpur and Adj. Mouzas Piped Water Supply Scheme | SM/03187 | SM/08318 | 426/MD. | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 |
550 | PASCHIM MEDINIPUR | SHASHINDA SVS PWSS | SM/18017 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
551 | PASCHIM MEDINIPUR | Shimulia Piped Water Supply Scheme. | SM/06528 | SM/09080 | 840/MD | ANUSKA ENTERPRISE | 02-05-2022 | 01-06-2022 |
552 | PASCHIM MEDINIPUR | Shrirampur & its adjoining mouzas Water Supply Scheme, Block - Ghatal, Dist.- Paschim Medinipur. | SM/15120 | 1432/MD | AJITESH ACHARJEE | 04-05-2023 | 03-06-2023 | |
553 | PASCHIM MEDINIPUR | SHUJA AND ADJOINING MOUJAS PWSS | SM/13109 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
554 | PASCHIM MEDINIPUR | SHUKHNATOR AND ADJOINING MOUJAS PWSS | SM/18020 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
555 | PASCHIM MEDINIPUR | SHYAMNAGAR AND ADJOINING MOUJAS PWSS | SM/13173 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
556 | PASCHIM MEDINIPUR | SINGLA AND IT'S ADJOINING MOUJAS | SM/13110 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
557 | PASCHIM MEDINIPUR | SINNIBAR PIPED WATER SUPPLY SCHEME | SM/18527 | 3232/MD | M/S. A.R. ENTERPRISE. | 11-09-2023 | 09-03-2024 | |
558 | PASCHIM MEDINIPUR | Solar operated standa alone water supply arrangement with subsequent functional house hold tap connection for pari samadhan (PAM-148) in Paschim Medinipur District | SM/08288 | 427/MD | MIDNAPUR PIPE CONCERN | 26-02-2021 | 11-07-2021 | |
559 | PASCHIM MEDINIPUR | SONAKANIA WATER SUPPLY SCHEME | SM/00438 | 2003/MD | M/S. EL-CON | 01-12-2021 | 16-12-2021 | |
560 | PASCHIM MEDINIPUR | SONAKHALI WATER SUPPLY SCHEME | SM/01100 | SM/09980 | 1688/MD | GOBINDA MAITY | 16-08-2022 | 12-02-2023 |
561 | PASCHIM MEDINIPUR | SONIAKON AND ADJOINING MOUJAS PWSS | SM/13221 | 5091/MD | RMN INFRASTRUCTURES LIMITED | 30-10-2023 | 29-10-2024 | |
562 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 517/AE/GSD | BUNBA CONSTRUCTION | 07-09-2022 | 27-09-2022 |
563 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 514/AE/GSD | KAMAKHYA ENTERPRISE | 07-09-2022 | 27-09-2022 |
564 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 515/AE/GSD | PRITI ENTERPRISE | 07-09-2022 | 27-09-2022 |
565 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 512/AE/GSD | M/S JITEN BANARJEE | 07-09-2022 | 27-09-2022 |
566 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 511/AE/GSD | M/S JITEN BANARJEE | 07-09-2022 | 27-09-2022 |
567 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 519/AE/GSD | SURAJIT GHOSH | 07-09-2022 | 27-09-2022 |
568 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 513/AE/GSD | TARUN MAHATA | 07-09-2022 | 27-09-2022 |
569 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/06170 | 1469/MD | M/S ZAMAN ENTERPRISE | 07-09-2021 | 17-09-2021 |
570 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/06170 | 412/MD | M/S JITEN BANARJEE | 26-02-2021 | 13-03-2021 |
571 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/15569 | 2721/MD | M/S. D.K.H.CONSTRUCTION | 31-07-2023 | 29-10-2023 |
572 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 524/AE/GSD | M/S. ZAMAN ENTERPRISE | 07-09-2022 | 27-09-2022 |
573 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 516/AE/GSD | PULLOCK KUMAR GHOSH | 07-09-2022 | 27-09-2022 |
574 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 523/AE/GSD | M/S. ZAMAN ENTERPRISE | 07-09-2022 | 27-09-2022 |
575 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 522/AE/GSD | PULLOCK KUMAR GHOSH | 07-09-2022 | 27-09-2022 |
576 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 521/AE/GSD | A.R. CONSTRUCTION | 07-09-2022 | 27-09-2022 |
577 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 520/AE/GSD | MAHAPRABHU ENTERPRISE | 07-09-2022 | 27-09-2022 |
578 | PASCHIM MEDINIPUR | SRINAGAR WATER SUPPLY SCHEME | SM/00767 | SM/12117 | 518/AE/GSD | INDRAJIT ROY | 07-09-2022 | 27-09-2022 |
579 | PASCHIM MEDINIPUR | Sub-Surface Water Based Piped Water Supply Scheme for Dherua & its adjoining mouzas | SM/03866 | SM/05605 | 1439/MD | M/S. CARE | 26-11-2020 | 25-05-2021 |
580 | PASCHIM MEDINIPUR | Sub-Surface Water Based Piped Water Supply Scheme for Dherua & its adjoining mouzas | SM/03866 | SM/05605 | 1440/MD | M/S. EL-CON | 26-11-2020 | 25-05-2021 |
581 | PASCHIM MEDINIPUR | Sub-Surface Water Based Piped Water Supply Scheme for Dherua & its adjoining mouzas | SM/03866 | SM/05605 | 1438/MD | M/S. EL-CON | 26-11-2020 | 25-05-2021 |
582 | PASCHIM MEDINIPUR | Sub-Surface Water Based Piped Water Supply Scheme for Dherua & its adjoining mouzas | SM/03866 | SM/05605 | 1441/MD | M/S. CARE | 26-11-2020 | 25-05-2021 |
583 | PASCHIM MEDINIPUR | Suratpur Piped Water Supply Scheme, Block - Daspur-I, Dist.- Paschim Medinipur. | SM/19043 | 5514/MD | MASUM ALI KHAN | 15-12-2023 | 12-06-2024 | |
584 | PASCHIM MEDINIPUR | Tanuya Piped Water Supply Scheme. | SM/09992 | 33/MD | BANERJEE CONSTRUCTION | 07-01-2022 | 06-07-2022 | |
585 | PASCHIM MEDINIPUR | Tararui Piped Water Supply Scheme | SM/05463 | SM/08220 | 309/MD | DIPAK KUMAR BAKLY | 22-02-2021 | 29-03-2021 |
586 | PASCHIM MEDINIPUR | Tararui Piped Water Supply Scheme | SM/05463 | 309/MD | DIPAK KUMAR BAKLY | 22-02-2021 | 29-03-2021 | |
587 | PASCHIM MEDINIPUR | TARUA AND ADJOINING MOUJAS PWSS | SM/13166 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
588 | PASCHIM MEDINIPUR | TEGHARI AND ITS ADJOINING MOUZAS PWSS | SM/15594 | 2924/MD | M/S. A.R. ENTERPRISE. | 16-08-2023 | 12-02-2024 | |
589 | PASCHIM MEDINIPUR | THAUR AND ITS ADJOINING MOUZAS PWSS | SM/15906 | 2924/MD | M/S. A.R. ENTERPRISE. | 16-08-2023 | 12-02-2024 | |
590 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DHANYAGACHHI TOACCOMMODATE FHTC UNDER CHANDRAKONA - II BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDERMIDNAPORE DIVISION, PHE DTE. | SM/18027 | 1142/MD | SUJATA CONSTRUCTION | 25-04-2023 | 22-10-2023 | |
591 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DHANYAGACHHI TOACCOMMODATE FHTC UNDER CHANDRAKONA - II BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDERMIDNAPORE DIVISION, PHE DTE. | SM/18027 | 972/MD | WATER LINK | 10-04-2023 | 25-05-2023 | |
592 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DWARKHOLA TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDER MIDNAPORE DIVISION, PHE DTE | SM/17574 | 2431/MD | WATER LINK | 13-07-2023 | 11-09-2023 | |
593 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR HRISINGPUR TO ACCOMMODATE FHTC UNDER HANDRAKONA - II BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDER MIDNAPORE DIVISION, PHE DTE. | SM/15121 | 816/MD | KHAN ENTERPRISE | 21-03-2023 | 17-09-2023 | |
594 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JADABPUR TOACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDERMIDNAPORE DIVISION, PHE DTE. | SM/18234 | 2951/MD | GOBINDA MAITY | 17-08-2023 | 13-02-2024 | |
595 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MAHESHPUR TOACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDERMIDNAPORE DIVISION, PHE DTE | SM/18032 | 2418/MD | DULAL CHANDRA DAS | 13-07-2023 | 09-01-2024 | |
596 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PIRCHAK TO ACCOMMODATEFHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDER MIDNAPORE DIVISION,PHE DTE. | SM/15122 | 2419/MD | BANERJEE CONSTRUCTION | 13-07-2023 | 09-01-2024 | |
597 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PURSHURI TO ACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MEDINIPUR DISTRICT UNDER MEDINIPUR DIVISION, PHE DTE. | SM/16252 | 2422/MD | GOBINDA MAITY | 13-07-2023 | 09-01-2024 | |
598 | PASCHIM MEDINIPUR | THE PROPOSED GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAMKRISHNAPUR TOACCOMMODATE FHTC UNDER CHANDRAKONA - I BLOCK IN PASCHIM MIDNAPORE DISTRICT UNDERMIDNAPORE DIVISION, PHE DTE. | SM/18235 | 2422/MD | GOBINDA MAITY | 13-07-2023 | 09-01-2024 | |
599 | PASCHIM MEDINIPUR | TORIA PIPED WATER SUPPLY SCHEME | SM/18494 | 3149/MD | BANERJEE CONSTRUCTION | 29-08-2023 | 25-02-2024 | |
600 | PASCHIM MEDINIPUR | TRIKALPUR AND ADJOINING MOUJAS PWSS | SM/13112 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
601 | PASCHIM MEDINIPUR | TUTRANGA AND ADJOINING MOUJAS PWSS | SM/13131 | 5049/MD | SWACH ENVIRONMENT PRIVATE LIMITED | 25-10-2023 | 20-08-2024 | |
602 | PASCHIM MEDINIPUR | UTATR KARKARA AND ADJOINING MOUJAS PWSS | SM/13129 | 2823/MD | S & P ENTERPRISE | 07-08-2023 | 01-08-2024 | |
603 | PASCHIM MEDINIPUR | UTTAR PIASHALA PIPED WATER SUPPLY SCHEME | SM/13810 | 2735/MD | M/S. S.S. ENTERPRISE | 01-08-2023 | 27-05-2024 | |
604 | PASCHIM MEDINIPUR | Warda Piped Water Supply Scheme | SM/06360 | SM/09083 | 423/MD | S.T. ENTERPRISE | 04-03-2022 | 03-04-2022 |
605 | PASCHIM MEDINIPUR | Warda Piped Water Supply Scheme | SM/06360 | SM/09083 | 1134/MD | M/S. D.K.H.CONSTRUCTION | 13-06-2022 | 04-07-2022 |
Total |