Sl. No. | District
As per Census (2011)
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
SM Code
Sanctioned Scheme Code Retrofitting/ Augmentation Schemes under this parent Scheme as per PHED-MIS
|
Child SM Code
Sanctioned Scheme Code of the Child Scheme as per PHED-MIS
|
Work Order Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Agency
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Order Issue Date
Date of Issuance of the Work Order as per PHED-MIS
|
Work Order Completion Date
Date of Completion as per Days of Completion mentioned in the PHED-MIS
|
---|---|---|---|---|---|---|---|---|
594 | ||||||||
1 | BIRBHUM | Abdullahpur Piped Water Supply Scheme. | SM/12679 | 1344/BHM | M/S ELLIUS KHAN | 20-04-2023 | 29-04-2023 | |
2 | BIRBHUM | Abhirampur and Adjoining Mouzas PWSS | SM/12536 | 1437/BHM | ASHOK KUMAR GHOSH | 25-04-2023 | 04-05-2023 | |
3 | BIRBHUM | AHMEDPUR WATER SUPPLY SCHEME | SM/00095 | SM/10313 | 1158/BHM | PASCON | 23-05-2022 | 19-11-2022 |
4 | BIRBHUM | AHMEDPUR WATER SUPPLY SCHEME | SM/00095 | 400/BSSD | SUBHRADIP SARKAR | 14-12-2021 | 03-01-2022 | |
5 | BIRBHUM | AHMEDPUR WATER SUPPLY SCHEME | SM/00095 | SM/10313 | 1161/BHM | M/S GOUTAM DAS | 23-05-2022 | 19-11-2022 |
6 | BIRBHUM | AMDOLE WATER SUPPLY SCHEME | SM/00384 | 2780/BHM | KAMIRUL SK AND CO | 14-12-2022 | 27-02-2023 | |
7 | BIRBHUM | AMDOLE WATER SUPPLY SCHEME | SM/00384 | SM/08893 | 2098/BHM | MD ABSAR ALI | 16-12-2021 | 14-02-2022 |
8 | BIRBHUM | AMDOLE WATER SUPPLY SCHEME | SM/00384 | SM/08893 | 1771/BHM | UJJWAL DAS | 29-10-2021 | 28-12-2021 |
9 | BIRBHUM | AMDOLE WATER SUPPLY SCHEME | SM/00384 | SM/08893 | 885/BHM | KHANDAKAR CONSTRUCTION | 22-04-2022 | 21-06-2022 |
10 | BIRBHUM | ANDHARGRAM PIPED WATER SUPPLY SCHEME. | SM/12676 | 1191/BHM | NISITH BARAN SARKAR | 12-04-2023 | 21-04-2023 | |
11 | BIRBHUM | Asenga Piped Water Supply Scheme. | SM/12680 | 1342/BHM | M/S GOUTAM DAS | 20-04-2023 | 29-04-2023 | |
12 | BIRBHUM | Asuralay Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division. | SM/13376 | 505/BHM | B RAI CONSTRUCTION COMPANY | 05-02-2024 | 14-02-2024 | |
13 | BIRBHUM | Atla w/s scheme | SM/02545 | SM/07645 | 273/RSD | PROLOY KUMAR MONDAL | 16-07-2021 | 26-07-2021 |
14 | BIRBHUM | Atla w/s scheme | SM/02545 | SM/07645 | 1324/BHM | BIJOY KUMAR CHOUDHURY | 16-08-2021 | 15-10-2021 |
15 | BIRBHUM | Ayas Piped Water Supply Scheme. | SM/18669 | 1949/BHM | PRADIP KUMAR DEB, 103/4 NAINAN PARA LANE , KOLKATA-700036 | 04-07-2024 | 04-07-2025 | |
16 | BIRBHUM | Babuijore Piped Water Supply Scheme | SM/05547 | SM/07530 | 2433/BHM | PRAVAT SARKAR | 02-11-2022 | 01-01-2023 |
17 | BIRBHUM | Babuijore Piped Water Supply Scheme | SM/05547 | SM/07530 | 1045/BHM | HIRANMAY GHOSH | 31-03-2023 | 15-05-2023 |
18 | BIRBHUM | Babuijore Piped Water Supply Scheme | SM/05547 | SM/07530 | 1635/BHM | THREE MAA ENTERPRISE | 02-05-2023 | 01-07-2023 |
19 | BIRBHUM | Bagahola Piped Water Supply Scheme | SM/14084 | 4123/BHM | LUMINO SMC JV | 17-10-2023 | 16-10-2024 | |
20 | BIRBHUM | Bahadurpur Piped Water Supply Scheme. | SM/12681 | 884/BHM | ABUL KALAM | 21-03-2023 | 30-03-2023 | |
21 | BIRBHUM | Bajitpur Piped Water Supply Scheme under mayureswar-I Block within Birbhum Division. | SM/13983 | 618/BHM | S.D CONSTRUCTION | 27-02-2023 | 08-03-2023 | |
22 | BIRBHUM | BALIARA PIPED WATER SUPPLY SCHEME | SM/14847 | 1426/BHM | M/S REBATI SANKAR SINHA | 25-04-2023 | 04-05-2023 | |
23 | BIRBHUM | Baliharpur Piped Water Supply Scheme | SM/05917 | SM/07648 | 1645/BHM | BIJOY KUMAR CHOUDHURY | 02-05-2023 | 16-06-2023 |
24 | BIRBHUM | Baliharpur Piped Water Supply Scheme | SM/05917 | SM/07648 | 820/BHM | S S ENTERPRISE | 13-04-2022 | 12-06-2022 |
25 | BIRBHUM | Baliharpur Piped Water Supply Scheme | SM/05917 | SM/07648 | 1721/BHM | NOVELTY CONSTRUCTION | 12-05-2023 | 11-07-2023 |
26 | BIRBHUM | BANGJITA PIPED WATER SUPPLY SCHEME. | SM/12829 | 1258/BHM | NAUTANDAS AND CO | 17-04-2023 | 26-04-2023 | |
27 | BIRBHUM | Banhat Piped Water Supply Scheme. | SM/14029 | 904/BHM | PRALAY ROY | 22-03-2023 | 31-03-2023 | |
28 | BIRBHUM | BANSANKHA PIPED WATER SUPPLY SCHEME. | SM/12889 | 1181/BHM | MAHAVIR PUMPS MFG PVT LTD | 12-04-2023 | 21-04-2023 | |
29 | BIRBHUM | Bansjhor w/s scheme | SM/02427 | SM/07006 | 1865/BHM | PRANAB KUMAR GHOSH | 16-11-2021 | 15-01-2022 |
30 | BIRBHUM | Bansjhor w/s scheme | SM/02427 | SM/07006 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 |
31 | BIRBHUM | Bansjhor w/s scheme | SM/02427 | SM/07006 | 265/BSSD | M/S C.P. CONCERN | 04-08-2021 | 24-08-2021 |
32 | BIRBHUM | Bansjhor w/s scheme | SM/02427 | SM/07006 | 908/BHM | RAJKUMAR DAS | 13-03-2024 | 12-05-2024 |
33 | BIRBHUM | BARA KARTIK CHUNGRI PIPED WATER SUPPLY SCHEME | SM/18514 | 4163/BHM | M/S ASHA CONSTRUCTION | 30-10-2023 | 08-11-2023 | |
34 | BIRBHUM | BARA WATER SUPPLY SCHEME | SM/00381 | SM/10319 | 860/BHM | PASCON | 20-04-2022 | 17-10-2022 |
35 | BIRBHUM | BARA WATER SUPPLY SCHEME | SM/00381 | SM/10319 | 1099/BHM | MANASH GHOSH | 06-04-2023 | 05-07-2023 |
36 | BIRBHUM | BARA WATER SUPPLY SCHEME | SM/00381 | SM/10319 | 805/BHM | MANASH GHOSH | 12-04-2022 | 09-10-2022 |
37 | BIRBHUM | Baraturi Gram Piped Water Supply Scheme under Mayureswar -I Block within Birbhum Division PHE Dte. | SM/14424 | 505/BHM | B RAI CONSTRUCTION COMPANY | 05-02-2024 | 14-02-2024 | |
38 | BIRBHUM | Barshal piped water supply scheme. | SM/14535 | 3506/BHM | M/S GHOSH AND CO. | 10-08-2023 | 19-08-2023 | |
39 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 403/BSD | INDRAJIT DAS | 25-10-2021 | 04-11-2021 |
40 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 379/BSD | MS KAZIMEHERUDDIN | 07-10-2021 | 06-11-2021 |
41 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 382/BSD | M/S SARADA CONSTRUCTION. | 29-09-2022 | 09-10-2022 |
42 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 381/BSD | M/S SARADA CONSTRUCTION. | 29-09-2022 | 09-10-2022 |
43 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 379/BSD | MS KAZIMEHERUDDIN | 07-10-2021 | 06-11-2021 |
44 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 1170 /BHM | HIMANGSU SEKHAR SARKAR | 21-09-2020 | 20-11-2020 |
45 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 255/BHM | MS KAZIMEHERUDDIN | 26-02-2021 | 12-04-2021 |
46 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 1089/BHM | PRANAB KUMAR GHOSH | 05-09-2020 | 05-10-2020 |
47 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 1172 /BHM | INDRAJIT DAS | 21-09-2020 | 05-11-2020 |
48 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 547/BHM | MS SANTI CONSTRUCTION | 11-05-2021 | 10-07-2021 |
49 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 201/BSD | M/S SARADA CONSTRUCTION. | 20-05-2022 | 19-06-2022 |
50 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 332/BHM | KAUSHIK RAY | 02-02-2023 | 19-03-2023 |
51 | BIRBHUM | Batikor Piped Water Supply Scheme | SM/05198 | SM/06740 | 1171 /BHM | MS B N ENTERPRISES | 21-09-2020 | 20-11-2020 |
52 | BIRBHUM | Behira and Adjoining Mouzas PWSS | SM/12456 | 1437/BHM | ASHOK KUMAR GHOSH | 25-04-2023 | 04-05-2023 | |
53 | BIRBHUM | Beja Piped Water Supply Scheme | SM/05920 | SM/12657 | 672/BHM | SUBHANKAR ROY | 20-02-2024 | 05-04-2024 |
54 | BIRBHUM | Beja Piped Water Supply Scheme | SM/05920 | 672/BHM | SUBHANKAR ROY | 20-02-2024 | 05-04-2024 | |
55 | BIRBHUM | Belera Piped Water Supply Scheme | SM/06391 | SM/12660 | 477/BHM | OM ENTERPRISE | 02-02-2024 | 18-03-2024 |
56 | BIRBHUM | Beluti Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division | SM/13634 | 673/BHM | ESCON INDIA | 01-03-2023 | 10-03-2023 | |
57 | BIRBHUM | BHABANANDAPUR WATER SUPPLY SCHEME | SM/01129 | SM/06744 | 289/BHM | M/S SARADA CONSTRUCTION. | 01-02-2023 | 18-03-2023 |
58 | BIRBHUM | BHABANANDAPUR WATER SUPPLY SCHEME | SM/01129 | SM/06744 | 510/AE/NSD | SURJASISH DATTA | 01-10-2021 | 15-11-2021 |
59 | BIRBHUM | BHABANANDAPUR WATER SUPPLY SCHEME | SM/01129 | SM/06744 | 54/AE/NSD | GOLAM RASUL | 08-02-2021 | 09-04-2021 |
60 | BIRBHUM | BHABANANDAPUR WATER SUPPLY SCHEME | SM/01129 | SM/06744 | 53/AE/NSD | MD SHAHAJAMAL | 08-02-2021 | 09-04-2021 |
61 | BIRBHUM | BHABANANDAPUR WATER SUPPLY SCHEME | SM/01129 | SM/06744 | 52/NSD | NUR MOBINUL ISLAM | 08-02-2021 | 09-04-2021 |
62 | BIRBHUM | Bhaddi Piped Water Supply Scheme | SM/14114 | 4123/BHM | LUMINO SMC JV | 17-10-2023 | 16-10-2024 | |
63 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 548/BHM | M/S GOUTAM DAS | 07-03-2022 | 02-11-2022 |
64 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 806/BHM | SUNIL RABI DAS | 12-04-2022 | 09-10-2022 |
65 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 319/RSD | MUKADDUMUL MOULA | 18-08-2021 | 02-09-2021 |
66 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 1107/BHM | SUNIL RABI DAS | 10-04-2023 | 19-04-2023 |
67 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 1047/BHM | M/S GOUTAM DAS | 31-03-2023 | 30-05-2023 |
68 | BIRBHUM | BHADRAPUR WATER SUPPLY SCHEME | SM/00378 | SM/10319 | 2467/BHM | M/S. JAN MAHAMMAD | 11-11-2022 | 20-11-2022 |
69 | BIRBHUM | Bhadulia Piped Water Supply Scheme | SM/14674 | 4123/BHM | LUMINO SMC JV | 17-10-2023 | 16-10-2024 | |
70 | BIRBHUM | Bhagabatipur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division. | SM/13475 | 1082/BHM | ZEBA CONSTRUCTION | 06-04-2023 | 15-04-2023 | |
71 | BIRBHUM | BHALIAN PIPED WATER SUPPLY SCHME. | SM/12834 | 1258/BHM | NAUTANDAS AND CO | 17-04-2023 | 26-04-2023 | |
72 | BIRBHUM | Bhandirban (Kanmara) Piped Water Supply Scheme | SM/06396 | SM/09341 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 |
73 | BIRBHUM | Bhandirban (Kanmara) Piped Water Supply Scheme | SM/06396 | SM/09341 | 729/BHM | S R ENTERPRISE | 28-02-2024 | 28-04-2024 |
74 | BIRBHUM | BHEJENA PIPED WATER SUPPLY SCHEME. | SM/12833 | 1980/BHM | APURBA MONDAL | 05-06-2023 | 14-06-2023 | |
75 | BIRBHUM | BILASPUR PIPED WATER SUPPLY SCHEME. | SM/12594 | 3019/BHM | SUNIL RABI DAS | 14-07-2023 | 23-07-2023 | |
76 | BIRBHUM | Bipratikuri Piped Water Supply Scheme | SM/06291 | SM/08897 | 1693/BHM | M/S KRIPASINDHU GHOSH & CO. | 07-10-2021 | 06-12-2021 |
77 | BIRBHUM | Bipratikuri Piped Water Supply Scheme | SM/06291 | SM/08897 | 288/BHM | M/S KRIPASINDHU GHOSH & CO. | 01-02-2023 | 18-03-2023 |
78 | BIRBHUM | Birchandrapur Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division. | SM/14141 | 505/BHM | B RAI CONSTRUCTION COMPANY | 05-02-2024 | 14-02-2024 | |
79 | BIRBHUM | BIRSINGHA PIPED WATER SUPPLY SCHEME. | SM/12830 | 1258/BHM | NAUTANDAS AND CO | 17-04-2023 | 26-04-2023 | |
80 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 37/BH | M/S K.S. GHOSH | 26-02-2021 | 18-03-2021 |
81 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 36/BH | BIJOY KUMAR CHOWDHURY | 26-02-2021 | 18-03-2021 |
82 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 34/BH | MUKADDUMUL MOULA | 26-02-2021 | 18-03-2021 |
83 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 2033/BHM | TAPAN KUMAR DATTA | 09-12-2021 | 07-02-2022 |
84 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08896 | 178/BH | M/S K.S. GHOSH | 03-11-2021 | 18-11-2021 |
85 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08896 | 178/BH | M/S K.S. GHOSH | 03-11-2021 | 18-11-2021 |
86 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08896 | 180/BH | MUKADDUMUL MOULA | 03-11-2021 | 18-11-2021 |
87 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08896 | 177/BH | TAPAN ENTERPRISE | 03-11-2021 | 18-11-2021 |
88 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08896 | 179/BH | BIJOY KUMAR CHOUDHURY | 03-11-2021 | 18-11-2021 |
89 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 36 / BH | BIJOY KUMAR CHOWDHURY | 26-02-2021 | 18-03-2021 |
90 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 35/BH | M/S S.N CONSTRUCTION | 26-02-2021 | 18-03-2021 |
91 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 319/RSD | MUKADDUMUL MOULA | 18-08-2021 | 02-09-2021 |
92 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 38/BH | TAPAN ENTERPRISE | 26-02-2021 | 18-03-2021 |
93 | BIRBHUM | Bisnupur w/s scheme | SM/02419 | SM/08172 | 1019/BHM | SUNIL RABI DAS | 17-06-2021 | 16-08-2021 |
94 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 290/BHM | PRABHAT KUMAR MANDAL. | 01-02-2023 | 18-03-2023 |
95 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/09792 | 308/BSD | SEKH MAMTAZ HOSSAIN | 16-08-2022 | 15-09-2022 |
96 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 388/BHM | SUJAY KUMAR ROY | 08-02-2023 | 25-03-2023 |
97 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 389/BHM | SUJAY KUMAR ROY | 08-02-2023 | 25-03-2023 |
98 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 224/BHM | B RAI CONSTRUCTION COMPANY | 20-01-2023 | 06-03-2023 |
99 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 330/BHM | SUPRIYA RAY | 02-02-2023 | 19-03-2023 |
100 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 331/BHM | SUPRIYA RAY | 02-02-2023 | 19-03-2023 |
101 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/09792 | 2244/BHM | SUPRIYA RAY | 17-10-2022 | 16-11-2022 |
102 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 381/BSD | ARNAB CHANDRA | 07-10-2021 | 06-11-2021 |
103 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 240/BSD | IMAGIN | 16-07-2021 | 15-08-2021 |
104 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 237/BSD | M/S HORIZEN | 16-07-2021 | 15-08-2021 |
105 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 236/AE/BSD | IMAGIN | 16-07-2021 | 31-07-2021 |
106 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | 239/BSD | M/S HORIZEN | 16-07-2021 | 15-08-2021 | |
107 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 94/BHM | BHAGYADHAR GHOSH | 29-01-2021 | 15-03-2021 |
108 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | 238/BSD | IMAGIN | 16-07-2021 | 15-08-2021 | |
109 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 193/BSD | BISWARUP GHOSH | 14-09-2020 | 20-09-2020 |
110 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 300/BSD | PRABHAT KUMAR MONDAL. | 19-08-2021 | 29-08-2021 |
111 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 382/BSD | ARABINDA GHOSH | 07-10-2021 | 06-11-2021 |
112 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 389/BSD | INDRAJIT DAS | 07-10-2021 | 06-11-2021 |
113 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 98/BHM | CHAYAN KUMAR MONDAL | 29-01-2021 | 15-03-2021 |
114 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 309/BSD | IMAGIN | 24-08-2021 | 08-09-2021 |
115 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 284/BSD | PRATICK KUMAR GHOSH | 30-12-2020 | 31-12-2020 |
116 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 360/BSD | IMAGIN | 27-09-2021 | 12-10-2021 |
117 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 360/BSD | IMAGIN | 27-09-2021 | 12-10-2021 |
118 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 360/BSD | IMAGIN | 27-09-2021 | 12-10-2021 |
119 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/10320 | 360/BSD | IMAGIN | 27-09-2021 | 12-10-2021 |
120 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 360/BSD | IMAGIN | 27-09-2021 | 12-10-2021 |
121 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | 312/BSD | NAZIR HOSSAIN | 25-08-2021 | 09-09-2021 | |
122 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 312/BSD | NAZIR HOSSAIN | 25-08-2021 | 09-09-2021 |
123 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 96/EE/BHM | PRABHAT KUMAR MONDAL. | 29-01-2021 | 15-03-2021 |
124 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 1659/BHM | HIMANGSU SEKHAR SARKAR | 30-09-2021 | 29-11-2021 |
125 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 231/BSD | M/S HORIZEN | 07-07-2021 | 22-07-2021 |
126 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 347/BSD | IMAGIN | 15-09-2021 | 15-10-2021 |
127 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 447 /BSD | SUBHRADIP SARKAR | 10-12-2021 | 09-01-2022 |
128 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 310/BSD | IMAGIN | 24-08-2021 | 13-09-2021 |
129 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 1659 /BHM | HIMANGSU SEKHAR SARKAR | 30-09-2021 | 29-11-2021 |
130 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 385/BSD | SYED HASMAT ALI | 07-10-2021 | 06-11-2021 |
131 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 396/BSD | SEKH MAMTAZ HOSSAIN | 25-10-2021 | 04-11-2021 |
132 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 380/BSD | PRATICK KUMAR GHOSH | 07-10-2021 | 06-11-2021 |
133 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 383/BSD | B. B. CONSTRUCTION | 07-10-2021 | 06-11-2021 |
134 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 57/BSD | CHAYAN KUMAR MONDAL | 19-02-2021 | 21-03-2021 |
135 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 395/BSD | SEKH MAMTAZ HOSSAIN | 25-10-2021 | 04-11-2021 |
136 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 397/BSD | MS AD ENTERPRISE | 25-10-2021 | 04-11-2021 |
137 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 400/BSD | JAYANTA BARAL | 25-10-2021 | 04-11-2021 |
138 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 401/BSD | SUBHRADIP SARKAR | 25-10-2021 | 04-11-2021 |
139 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 384/BSD | BHAGYADHAR GHOSH | 07-10-2021 | 06-11-2021 |
140 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 398/BSD | GANAPATI ENGINEERING CORP. | 25-10-2021 | 04-11-2021 |
141 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 399/BSD | SK.RUHUL AMIN | 25-10-2021 | 04-11-2021 |
142 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 578/bhm | ASHA ENTERPRISE | 17-03-2022 | 01-05-2022 |
143 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 78/BHM | SOUMEN CHATTERJEE | 18-01-2022 | 19-03-2022 |
144 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 280/BHM | PINTU KHAN | 09-02-2022 | 26-03-2022 |
145 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 597/BHM | RADHARANI ENTERPRISE | 21-03-2022 | 05-05-2022 |
146 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 70/BSD | MS AD ENTERPRISE | 03-03-2022 | 18-03-2022 |
147 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 76/BSD | SEKH MAMTAZ HOSSAIN | 03-03-2022 | 02-04-2022 |
148 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 447/BSD | SUBHRADIP SARKAR | 10-12-2021 | 09-01-2022 |
149 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 75/BSD | MAA KANKALI ENTERPRISE | 03-03-2022 | 02-04-2022 |
150 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 380/BHM | INDRAJIT DAS | 21-02-2022 | 22-04-2022 |
151 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 2165/BHM | SYED HASMAT ALI | 24-12-2021 | 22-02-2022 |
152 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 2163/BHM | BISWARUP GHOSH | 24-12-2021 | 22-02-2022 |
153 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/09792 | 2271/BHM | SUPRIYA RAY | 18-10-2022 | 17-11-2022 |
154 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/09792 | 315/BSD | CHAYAN KUMAR MONDAL | 17-08-2022 | 16-09-2022 |
155 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 252/BSD | CHAYAN KUMAR MONDAL | 04-07-2022 | 03-08-2022 |
156 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 1469/BHM | SACHIN KUMAR SARKAR | 11-07-2022 | 09-09-2022 |
157 | BIRBHUM | BOLPUR AREA EXTERNALLY AIDED PROJECT | SM/01055 | SM/04699 | 173/BHM | SUPRIYA RAY | 17-01-2023 | 16-02-2023 |
158 | BIRBHUM | BONHA PIPED WATER SUPPLY SCHEME at Murarai-II Block,District Birbhum Division. | SM/12591 | 1216/BHM | TAPAN KUMAR DATTA | 12-04-2023 | 21-04-2023 | |
159 | BIRBHUM | Chakpara piped water supply scheme. | SM/13638 | 4188/BHM | NABIN DEBNATH | 01-11-2023 | 10-11-2023 | |
160 | BIRBHUM | Chanchali piped water supply scheme. | SM/12683 | 1424/BHM | SUPRITI ENTERPRISE | 25-04-2023 | 04-05-2023 | |
161 | BIRBHUM | CHANDIDAS NANOOR WATER SUPPLY SCHEME | SM/00796 | SM/10320 | 1070/BHM | G.D. CONSTRUCTION & CO | 13-05-2022 | 09-11-2022 |
162 | BIRBHUM | CHANDIDAS NANOOR WATER SUPPLY SCHEME | SM/00796 | SM/10320 | 312/BSD | NAZIR HOSSAIN | 25-08-2021 | 09-09-2021 |
163 | BIRBHUM | Chandrapur Piped Water Supply Scheme | SM/14893 | 1093/BHM | SADANANDA CHATTARAJ | 06-04-2023 | 15-04-2023 | |
164 | BIRBHUM | CHATRA WATER SUPPLY SCHEME | SM/00379 | SM/10319 | 139/BH | ISLAM CONSTRUCTION | 15-06-2022 | 05-07-2022 |
165 | BIRBHUM | CHATRA WATER SUPPLY SCHEME | SM/00379 | SM/10319 | 46/BHM | M/S GOUTAM DAS | 04-01-2023 | 20-03-2023 |
166 | BIRBHUM | Chauhata Piped Water Supply scheme | SM/06265 | SM/08891 | 166/BSD | SK.RUHUL AMIN | 15-02-2024 | 22-02-2024 |
167 | BIRBHUM | Chauhata Piped Water Supply scheme | SM/06265 | SM/08891 | 1850/BHM | JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED | 30-08-2022 | 29-10-2022 |
168 | BIRBHUM | CHAUTI PIPED WATER SUPPLY SCHEME. | SM/12835 | 674/BHM | QUAZI SIRAJUL ISLAM. | 01-03-2023 | 10-03-2023 | |
169 | BIRBHUM | Chhamna Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division. | SM/13710 | 3020/BHM | S K CONSTRUCTION | 14-07-2023 | 23-07-2023 | |
170 | BIRBHUM | CHHOTA TULIGRAM PIPED WATER SUPPKY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DIVISION | SM/18513 | 1783/BHM | UNIQUE AGENCY | 14-06-2024 | 14-06-2025 | |
171 | BIRBHUM | Chinpai Piped Water Supply Scheme. | SM/18462 | 3476/BHM | B RAI CONSTRUCTION COMPANY | 08-08-2023 | 17-08-2023 | |
172 | BIRBHUM | Chora Piped Water Supply Scheme | SM/15523 | 4123/BHM | LUMINO SMC JV | 17-10-2023 | 16-10-2024 | |
173 | BIRBHUM | Chormara Piped Water Supply Scheme. | SM/14030 | 1878/BHM | SPIRIT ENGINEERS CO OP SOCIETY LTD | 31-05-2023 | 09-06-2023 | |
174 | BIRBHUM | Dabuk Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division | SM/13480 | 1083/BHM | ZEBA CONSTRUCTION | 06-04-2023 | 15-04-2023 | |
175 | BIRBHUM | Dadpur Piped Water Supply Scheme. | SM/12684 | 839/BHM | NABIN DEBNATH | 16-03-2023 | 25-03-2023 | |
176 | BIRBHUM | Dakshin Chandipur Piped Water Supply Scheme. | SM/12685 | 1347/BHM | M/S KRIPASINDHU GHOSH & CO. | 20-04-2023 | 29-04-2023 | |
177 | BIRBHUM | Dakshin Gram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division | SM/18521 | 4142/BHM | B RAI CONSTRUCTION COMPANY | 19-10-2023 | 28-10-2023 | |
178 | BIRBHUM | Dakshin Kasila Piped Water Supply Scheme. | SM/12686 | 1424/BHM | SUPRITI ENTERPRISE | 25-04-2023 | 04-05-2023 | |
179 | BIRBHUM | DALIMA PIPED WATER SUPPLY SCHEME. | SM/12592 | 1423/BHM | AKASH CONSTRUCTION | 25-04-2023 | 04-05-2023 | |
180 | BIRBHUM | Danghara Piped Water Supply Scheme | SM/06355 | SM/09370 | 2002/BHM | NUR MOBINUL ISLAM | 15-09-2022 | 14-11-2022 |
181 | BIRBHUM | Danghara Piped Water Supply Scheme | SM/06355 | SM/12665 | 874/BHM | QUAZI SIRAJUL ISLAM. | 21-03-2023 | 20-05-2023 |
182 | BIRBHUM | Danghara Piped Water Supply Scheme | SM/06355 | SM/09370 | 874/BHM | QUAZI SIRAJUL ISLAM. | 21-03-2023 | 20-05-2023 |
183 | BIRBHUM | Dantura Piped Water Supply Scheme | SM/06312 | SM/09364 | 2005/BHM | PRAVAT SARKAR | 15-09-2022 | 14-11-2022 |
184 | BIRBHUM | Dantura Piped Water Supply Scheme | SM/06312 | SM/09364 | 1014/BHM | NUR MOBINUL ISLAM | 30-03-2023 | 29-05-2023 |
185 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06742 | 2059/BHM | RAJKUMAR DAS | 10-12-2021 | 08-02-2022 |
186 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06944 | 1569/BHM | HOQUEDAR ALI | 26-07-2022 | 24-09-2022 |
187 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06944 | 16/BSD | GANAPATI ENGINEERING CORP. | 11-01-2022 | 26-01-2022 |
188 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06742 | 1424/BHM | S.S. BHATTACHARJEE. | 04-11-2020 | 19-12-2020 |
189 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06742 | 1087/BHM | S.S. BHATTACHARJEE. | 05-09-2020 | 05-10-2020 |
190 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06742 | 1425/BHM | SYED KHORSID ALAM | 04-11-2020 | 19-12-2020 |
191 | BIRBHUM | Daronda and Adj. Mouzas Water Supply Scheme | SM/03036 | SM/06944 | 402/BSD | NAZIR HOSSAIN | 25-10-2021 | 04-11-2021 |
192 | BIRBHUM | Data Baba Mazar W/S Scheme | SM/02920 | SM/10665 | 2509/BHM | AMIT KUMAR ROY | 17-11-2022 | 17-12-2022 |
193 | BIRBHUM | Data Baba Mazar W/S Scheme | SM/02920 | SM/10665 | 1720/BHM | ARPAN PANDIT | 12-05-2023 | 11-06-2023 |
194 | BIRBHUM | DELORA PIPED WATER SUPPLY SCHEME | SM/13600 | 1192/BHM | M/S SANDIP CONSTRUCTION | 12-04-2023 | 21-04-2023 | |
195 | BIRBHUM | Deoash and Adjoining Mouzas PWSS | SM/12670 | 1194/BHM | M/S. JAN MAHAMMAD | 12-04-2023 | 21-04-2023 | |
196 | BIRBHUM | Deriapur Piped Water Supply Scheme | SM/06299 | SM/08894 | 1979/BHM | PINTU KHAN | 05-06-2023 | 20-07-2023 |
197 | BIRBHUM | Deriapur Piped Water Supply Scheme | SM/06299 | SM/08894 | 738/BHM | M/S GOUTAM DAS | 04-04-2022 | 03-06-2022 |
198 | BIRBHUM | DERPUR PIPED WATER SUPPLY SCHEME. | SM/12832 | 1245/BHM | BRAHMA CONSTRUCTION COMPANY | 17-04-2023 | 26-04-2023 | |
199 | BIRBHUM | Dhalla Piped Water Supply Scheme | SM/15256 | 2180/BHM | RADIANT | 06-08-2024 | 06-08-2025 | |
200 | BIRBHUM | Dhamara Piped Water Supply Scheme. | SM/14898 | 1244/BHM | ASHIM KUMAR CHAKRABORTY | 17-04-2023 | 26-04-2023 | |
201 | BIRBHUM | Dhitora Right side and adjoining mouzas piped water supply scheme. | SM/17633 | 1108/BHM | M/S PROCHESTA ENTERPRISE | 10-04-2023 | 19-04-2023 | |
202 | BIRBHUM | DUBRAJPUR WATER SUPPLY SCHEME | SM/00369 | 381/BSSD | RANJIT GHOSH | 10-12-2021 | 30-12-2021 | |
203 | BIRBHUM | DUBRAJPUR WATER SUPPLY SCHEME | SM/00609 | 381/BSSD | RANJIT GHOSH | 10-12-2021 | 30-12-2021 | |
204 | BIRBHUM | Dumugram piped water supply scheme. | SM/12689 | 1423/BHM | AKASH CONSTRUCTION | 25-04-2023 | 04-05-2023 | |
205 | BIRBHUM | DUNA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DISTRICT | SM/14675 | 1249/BHM | CREATIVE CONSTRUCTION | 17-04-2023 | 26-04-2023 | |
206 | BIRBHUM | Ekpara Piped Water Supply Scheme. | SM/12690 | 2067/BHM | CHOWDHURY ENTERPRISE | 08-06-2023 | 17-06-2023 | |
207 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 2656/BHM | BARDHAMAN AQUA ENGINEERING | 01-12-2022 | 15-01-2023 | |
208 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 27/BHM | GOURANGA MONDAL | 04-01-2023 | 18-02-2023 | |
209 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 2786/BHM | M/S.CHANDRANATH MUKHERJEE | 14-12-2022 | 28-01-2023 | |
210 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 2796/BHM | MITA DAS DOM | 15-12-2022 | 29-01-2023 | |
211 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 2489/BHM | JAGADANANDAPUR CO-OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 16-11-2022 | 31-12-2022 | |
212 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 2434/BHM | B.M.SARKAR | 02-11-2022 | 17-12-2022 | |
213 | BIRBHUM | Extension of PWS to Anganwadi Centers (AWCs) located within command area of PWSS under Birbhum Division | SM/09559 | 33/BHM | KHOKAN SAHA | 04-01-2023 | 18-02-2023 | |
214 | BIRBHUM | Gaytha Piped Water Supply Scheme | SM/13712 | 1311/BHM | RAJ ASSOCIATES | 19-04-2023 | 28-04-2023 | |
215 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/06948 | 508/AE/NSD | SHIB GANGA CONSTRUCTION | 01-10-2021 | 15-11-2021 |
216 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/06948 | 509/AE/NSD | SUPRABHAT RABIDAS | 01-10-2021 | 15-11-2021 |
217 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/10543 | 31/BHM | ISLAM CONSTRUCTION | 04-01-2023 | 18-02-2023 |
218 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/06948 | 370/AE/NSD | SUPRABHAT RABIDAS | 22-07-2021 | 05-09-2021 |
219 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/10543 | 383/AE/NSD | MD ZIAUL ISLAM | 10-08-2022 | 24-09-2022 |
220 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/10543 | 229/AE/NSD | MD ZIAUL ISLAM | 21-04-2022 | 05-06-2022 |
221 | BIRBHUM | Gopalpur and Adj. Mouzas Water Supply Scheme | SM/03070 | SM/10543 | 28/BHM | SUBHRANIL DAS | 04-01-2023 | 18-02-2023 |
222 | BIRBHUM | GOPINATHPUR PIPED WATER SUPPLY SCHEME | SM/14897 | 1091/BHM | M/S R B ENTERPRISE | 06-04-2023 | 15-04-2023 | |
223 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR CHICHUNRI AND OTHER 3 NOS. MOUZAS UNDER RAMPURHAT-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11906 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
224 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR KATUNIA AND OTHER 2 NOS. MOUZAS UNDER MD. BAZAR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11909 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
225 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR NISHPARUN AND OTHER 4 NOS. MOUZAS UNDER RAMPURHAT-II BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11901 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
226 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR PARKANDI AND OTHER 7 NOS. MOUZAS UNDER RAMPURHAT-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11935 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
227 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES (MAXIMUM 100 HOUSEHOLD) FOR SABASIDANGA AND OTHER 4 NOS. MOUZAS UNDER NALHATI-II BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11904 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
228 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR ALALCHAK AND OTHER 28 NOS. MOUZAS UNDER DUBRAJPUR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12074 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
229 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR ALALPUR AND OTHER 5 NOS. MOUZAS UNDER NALHATI-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/14038 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
230 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR AMDAHARA AND OTHER 20 NOS. MOUZAS UNDER SAINTHIA BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11902 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
231 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR AMLACHATURI AND OTHER 10 NOS. MOUZAS UNDER RAJNAGAR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11936 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
232 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR AMRITAPUR AND MAJHARA MOUZAS UNDER MURARAI-II BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11908 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
233 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR ARAZI TAKIPUR AND OTHER 11 NOS. MOUZAS UNDER SURI-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11900 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
234 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR BABUPUR AND OTHER 5 NOS. MOUZAS UNDER SURI-II BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11899 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
235 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR BAMUNDIHA AND OTHER 14 NOS. MOUZAS UNDER MD BAZAR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12068 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
236 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR BISERGHATA AND OTHER 23 NOS. MOUZAS UNDER BOLPUR SRINIKETAN BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12070 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
237 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR CHANDANPUR AND OTHER 5 NOS. MOUZAS UNDER MURARAI-I & NALHATI-I BLOCKS UNDER BIRBHUM DIVISION, PHE DTE. | SM/14043 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
238 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR DHEKA AND OTHER 21 NOS. MOUZAS UNDER MAYURESWAR-II BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11910 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
239 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR GANUTIA AND OTHER 20 NOS. MOUZAS UNDER SAINTHIA BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11903 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
240 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR GHOGAN AND OTHER 11 NOS. MOUZAS UNDER NANOOR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11905 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
241 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR GOPALPUR AND OTHER 20 NOS. MOUZAS UNDER SAINTHIA BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/14037 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
242 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR HARISHCHANDRAPUR AND OTHER 14 NOS. MOUZAS UNDER ILLAMBAZAR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/14015 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
243 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR MAJURIA AND OTHER 19 NOS. MOUZAS UNDER DUBRAJPUR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12073 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
244 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR NAYIT AND OTHER 3 NOS. MOUZAS UNDER MURARAI-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/11907 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
245 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR SIMJURI AND OTHER 19 NOS. MOUZAS UNDER KHOYRASOLE BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12072 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
246 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR TALA AND OTHER 25 NOS. MOUZAS UNDER LABPUR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/14039 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
247 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR UJALPUR AND OTHER 6 NOS. MOUZAS UNDER LABPUR BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12069 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
248 | BIRBHUM | GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEMES(MAXIMUM 100 HOUSEHOLD) FOR UTTAR BHAGABATIPUR AND OTHER 8 NOS. MOUZAS UNDER MAYURESWAR-I BLOCK UNDER BIRBHUM DIVISION, PHE DTE. | SM/12071 | 2624/BHM | BIRBHUM INFRAPARK PRIVATE LIMITED | 28-11-2022 | 28-03-2023 | |
249 | BIRBHUM | Ground Water Based Piped Water Supply Scheme for Dunigram & adj. mouzas. | SM/04477 | SM/15236 | 4161/BHM | M/S GOUTAM DAS | 30-10-2023 | 08-11-2023 |
250 | BIRBHUM | Hajrapur Piped Water Supply Scheme | SM/06371 | SM/09369 | 1453/BHM | SAPTADIP CONSTRUCTION | 07-07-2022 | 05-09-2022 |
251 | BIRBHUM | HANSAN PIPED WATER SUPPLY SCHEME | SM/14900 | 2179/BHM | RADIANT | 06-08-2024 | 06-08-2025 | |
252 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 595/AE/NSD | DATA CONSTRUCTION | 23-11-2021 | 07-01-2022 |
253 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 595/AE/NSD | DATA CONSTRUCTION | 23-11-2021 | 07-01-2022 |
254 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/12666 | 1291/BHM | A.K. SIKDAR | 18-04-2023 | 17-06-2023 |
255 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 594/AE/NSD | AJIMUL ISLAM | 23-11-2021 | 07-01-2022 |
256 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 596/AE/NSD | SURJASISH DATTA | 23-11-2021 | 07-01-2022 |
257 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 910/BHM | MS B N ENTERPRISES | 10-06-2021 | 09-08-2021 |
258 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 593/AE/NSD | M/S S.N CONSTRUCTION | 23-11-2021 | 07-01-2022 |
259 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 593/AE/NSD | M/S S.N CONSTRUCTION | 23-11-2021 | 07-01-2022 |
260 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 1015/BHM | TAPAN KUMAR DATTA | 15-06-2021 | 14-08-2021 |
261 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 681/BHM | BELAL SK | 01-06-2021 | 31-07-2021 |
262 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 423/AE/NSD | JOY CHAND MAL | 23-08-2021 | 07-09-2021 |
263 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 1006/BHM | M/S KRIPASINDHU GHOSH & CO. | 11-06-2021 | 10-08-2021 |
264 | BIRBHUM | Haridaspur Piped Water Supply Scheme | SM/05026 | SM/07531 | 274 / BHM | KAZI EMDADUL HAQUE | 26-02-2021 | 12-04-2021 |
265 | BIRBHUM | Harinduba Piped Water Supply Scheme. | SM/12692 | 1344/BHM | M/S ELLIUS KHAN | 20-04-2023 | 29-04-2023 | |
266 | BIRBHUM | Harisara Piped Water Supply Scheme | SM/05128 | SM/12658 | 1314/BHM | MD SURAJ ALI | 20-04-2023 | 19-06-2023 |
267 | BIRBHUM | Harisara Piped Water Supply Scheme | SM/05128 | SM/06951 | 1334/BHM | PRAVAT SARKAR | 18-08-2021 | 17-10-2021 |
268 | BIRBHUM | Hate Serandi Piped Water Supply Scheme | SM/06324 | SM/07650 | 188/BSD | BISWARUP GHOSH | 11-05-2022 | 10-06-2022 |
269 | BIRBHUM | Hate Serandi Piped Water Supply Scheme | SM/06324 | SM/07650 | 450/BSD | PRATICK KUMAR GHOSH | 10-12-2021 | 09-01-2022 |
270 | BIRBHUM | Hate Serandi Piped Water Supply Scheme | SM/06324 | SM/07650 | 448/BSD | BISWARUP GHOSH | 10-12-2021 | 09-01-2022 |
271 | BIRBHUM | Hate Serandi Piped Water Supply Scheme | SM/06324 | SM/07650 | 1462/BHM | BISWARUP GHOSH | 02-09-2021 | 01-11-2021 |
272 | BIRBHUM | HATGACHA WATER SUPPLY SCHEME | SM/00611 | 316/RSD | SOIL STORY | 18-08-2021 | 02-09-2021 | |
273 | BIRBHUM | HATGACHA WATER SUPPLY SCHEME | SM/00611 | SM/10321 | 1097/BHM | S S ENTERPRISE | 06-04-2023 | 05-07-2023 |
274 | BIRBHUM | HATGACHA WATER SUPPLY SCHEME | SM/00611 | 317/RSD | STP ENTERPRISE | 18-08-2021 | 02-09-2021 | |
275 | BIRBHUM | HATIKRA PIPED WATER SUPPLY SCHEME. | SM/12893 | 1181/BHM | MAHAVIR PUMPS MFG PVT LTD | 12-04-2023 | 21-04-2023 | |
276 | BIRBHUM | HATKALUA PIPED WATER SUPPLY SCHEME | SM/14115 | 1096/BHM | M/S R B ENTERPRISE | 06-04-2023 | 15-04-2023 | |
277 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06739 | 980/BHM | QUAZI SIRAJUL ISLAM. | 14-08-2020 | |
278 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06739 | 1242 /BHM | NANDANIK ENGINEERS C. OP. SOC. LTD. | 28-09-2020 | 27-11-2020 |
279 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06946 | 1181 /BHM | APORUPA CONSTRUCTION | 21-09-2020 | 20-11-2020 |
280 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06739 | 979/BHM | ABUL HASNAT | 14-08-2020 | |
281 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06739 | 1180 /BHM | UJJWAL DAS | 21-09-2020 | 20-11-2020 |
282 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06946 | 981/BHM | TAPAN ENTERPRISE | 18-08-2020 | 17-09-2020 |
283 | BIRBHUM | Hazarpur Piped Water Supply Scheme | SM/04976 | SM/06946 | 276/RSD | ABUL HASNAT | 16-07-2021 | 26-07-2021 |
284 | BIRBHUM | ILLAMBAZAR WATER SUPPLY SCHEME | SM/00792 | SM/06944 | 16/BSD | GANAPATI ENGINEERING CORP. | 11-01-2022 | 26-01-2022 |
285 | BIRBHUM | ILLAMBAZAR WATER SUPPLY SCHEME | SM/00792 | SM/10320 | 2498/BHM | RANJIT GHOSH | 17-11-2022 | 01-01-2023 |
286 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 1217/Bol.MD | SUNIL RABIDAS | 10-12-2021 | 24-01-2022 |
287 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 122/BMSD(D)/F & F/-16-17 | CHAKRABORTY MINING & ENGINERING | 10-03-2017 | |
288 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 73/BMSD(D)/F & F/16-17 | CHAKRABORTY MINING & ENGINERING | 14-02-2017 | |
289 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 2154/BHM | RANJIT GHOSH | 01-08-2024 | 15-09-2024 |
290 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 2354/BHM | SK ALIM | 22-08-2024 | 06-10-2024 |
291 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 511 /BHM | AVIJIT CHANDA | 03-03-2022 | 17-04-2022 | |
292 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 513/BHM | UTPAL DEY | 03-03-2022 | 17-04-2022 | |
293 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 1725/BHM | BHABANI ENTERPRISE | 12-05-2023 | 26-06-2023 |
294 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 1647/BHM | RICK CONSTRUCTION | 02-05-2023 | 16-06-2023 |
295 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 222/BHM | MA KANKALI ENTERPRISE | 20-01-2023 | 06-03-2023 | |
296 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 225/BHM | TAPAS CONSTRUCTION | 20-01-2023 | 06-03-2023 |
297 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 131/BMSD(D) | RAJIB GHOSH | 31-08-2022 | 20-09-2022 |
298 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 166/BMSD(D) | EASTERN INDIA SALES & SERVICE | 21-10-2022 | 10-11-2022 |
299 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 101/BHM | SUNDAR CONSTRUCTION | 11-01-2023 | 25-02-2023 | |
300 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 37/BHM | ARKA JYOTI GHOSH | 04-01-2023 | 18-02-2023 | |
301 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 37/BHM | ARKA JYOTI GHOSH | 04-01-2023 | 18-02-2023 |
302 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 2305/BHM | PREMANANDA ROY BISWAS | 21-10-2022 | 20-12-2022 |
303 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 147/BMSD(D) | SWAPAN BANERJEE | 23-09-2022 | 30-09-2022 |
304 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 121/BMSD(D) | CHAKRABORTY MINING & ENGINERING | 12-08-2022 | 01-09-2022 |
305 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 122/BMSD(D) | EASTERN INDIA SALES & SERVICE | 12-08-2022 | 01-09-2022 |
306 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 227/BHM | GOLAM RASUL | 20-01-2023 | 06-03-2023 |
307 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 2928/BHM | SUBHANKAR ROY | 28-12-2022 | 11-02-2023 | |
308 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 29/BHM | ASIT GHOSH | 04-01-2023 | 18-02-2023 | |
309 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 30/BHM | BHABATARAN SADHU | 04-01-2023 | 18-02-2023 | |
310 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 30/BHM | BHABATARAN SADHU | 04-01-2023 | 18-02-2023 |
311 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 128/BMSD(D) | EASTERN INDIA SALES & SERVICE | 23-08-2022 | 12-09-2022 |
312 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 2164/BHM | ROY BISWAS CONSTRUCTION | 28-09-2022 | 28-10-2022 |
313 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 127/BMSD(D) | CHAKRABORTY MINING & ENGINERING | 23-08-2022 | 12-09-2022 |
314 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 2605/BHM | RICK CONSTRUCTION | 24-11-2022 | 23-01-2023 |
315 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 506/BHM | DATA CONSTRUCTION | 03-03-2022 | 17-04-2022 | |
316 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 577/BHM | BHABANI ENTERPRISE | 17-03-2022 | 01-05-2022 | |
317 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 507/ BHM | DIPAK SARKAR | 03-03-2022 | 17-04-2022 | |
318 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 509/BHM | BHABATARAN SADHU | 03-03-2022 | 17-04-2022 | |
319 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 515/BHM | INDRAJIT DUTTA. | 03-03-2022 | 17-04-2022 | |
320 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 514/BHM | ARKA JYOTI GHOSH | 03-03-2022 | 17-04-2022 | |
321 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 510/BHM | GOUTAM MONDAL | 03-03-2022 | 17-04-2022 | |
322 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 512 /BHM | AMIT KUMAR ROY | 03-03-2022 | 17-04-2022 | |
323 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 505/BHM | RANJIT GHOSH | 03-03-2022 | 17-04-2022 |
324 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 505/BHM | RANJIT GHOSH | 03-03-2022 | 17-04-2022 | |
325 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | 508/BHM | M/S SARADA CONSTRUCTION. | 03-03-2022 | 17-04-2022 | |
326 | BIRBHUM | Implementation of 41 nos. mini Piped Water Supply Scheme to tackle draught like situation in the Birbhum District | SM/08098 | SM/12677 | 1213/Bol.MD | MASSK ENGINEERING WORKS | 10-12-2021 | 24-01-2022 |
327 | BIRBHUM | Indus Piped Water Supply Scheme | SM/06253 | SM/08895 | 2065/BHM | QUAZI SIRAJUL ISLAM. | 13-12-2021 | 11-02-2022 |
328 | BIRBHUM | Jashoda Piped Water Supply Scheme. | SM/12891 | 1194/BHM | M/S. JAN MAHAMMAD | 12-04-2023 | 21-04-2023 | |
329 | BIRBHUM | Jhikadda Piped Water Supply Scheme | SM/06257 | SM/12667 | 2507/BHM | KAZI EMDADUL HAQUE | 17-11-2022 | 01-01-2023 |
330 | BIRBHUM | JIJIGRAM PIPED WATER SUPPLY SCHEME. | SM/12837 | 3019/BHM | SUNIL RABI DAS | 14-07-2023 | 23-07-2023 | |
331 | BIRBHUM | JIUI PIPED WATER SUPPLY SCHEME. | SM/12902 | 1194/BHM | M/S. JAN MAHAMMAD | 12-04-2023 | 21-04-2023 | |
332 | BIRBHUM | JOGAI PIPED WATER SUPPLY SCHEME. | SM/12593 | 1308/BHM | QUAZI SIRAJUL ISLAM. | 19-04-2023 | 28-04-2023 | |
333 | BIRBHUM | JOYDEV KENDULI WATER SUPPLY SCHEME | SM/00795 | SM/10320 | 1729/BHM | PRANAB KUMAR GHOSH | 25-10-2021 | 22-02-2022 |
334 | BIRBHUM | JOYDEV KENDULI WATER SUPPLY SCHEME | SM/00795 | SM/10320 | 2498/BHM | RANJIT GHOSH | 17-11-2022 | 01-01-2023 |
335 | BIRBHUM | Kachujore Piped Water Supply Scheme. | SM/13016 | 1084/BHM | HIRANMAY GHOSH | 06-04-2023 | 15-04-2023 | |
336 | BIRBHUM | KAHINAGAR PIPED WATER SUPPLY SCHME | SM/12887 | 1423/BHM | AKASH CONSTRUCTION | 25-04-2023 | 04-05-2023 | |
337 | BIRBHUM | KAMARDANGAL PIPED WATER SUPPLY SCHEME. | SM/12675 | 885/BHM | M/S.KHAN CHOWDHURY BROTHERS AND CO. | 21-03-2023 | 30-03-2023 | |
338 | BIRBHUM | Kamdebnala piped water supply scheme. | SM/12694 | 1302/BHM | M/S GHOSH AND CO. | 19-04-2023 | 28-04-2023 | |
339 | BIRBHUM | KANAIPUR and Adjoining Mouzas PWSS | SM/12672 | 1348/BHM | M/S GOUTAM DAS | 20-04-2023 | 29-04-2023 | |
340 | BIRBHUM | KANAIPUR PIPED WATER SUPPLY SCHEME OF MAYURESWAR-I BLOCK UNDER BIRBHUM DISTRICT | SM/18489 | 505/BHM | B RAI CONSTRUCTION COMPANY | 05-02-2024 | 14-02-2024 | |
341 | BIRBHUM | Kanaipur piped water supply scheme. | SM/13640 | 3251/BHM | BENGAL ENGINEERING | 26-07-2023 | 04-08-2023 | |
342 | BIRBHUM | KANIOR PIPED WATER SUPPLY SCHEME. | SM/12831 | 1059/BHM | SK ALIM | 31-03-2023 | 09-04-2023 | |
343 | BIRBHUM | Kanksa piped water supply scheme under Mayureswar-I block within Birbhum Division | SM/14119 | 1879/BHM | PRANAB KUMAR GHOSH | 31-05-2023 | 09-06-2023 | |
344 | BIRBHUM | KARIDHYA WATER SUPPLY SCHEME | SM/00376 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 | |
345 | BIRBHUM | KARIDHYA WATER SUPPLY SCHEME | SM/00376 | SM/05728 | 265/BSSD | M/S C.P. CONCERN | 04-08-2021 | 24-08-2021 |
346 | BIRBHUM | Kayera Water Supply Scheme | SM/13641 | 1214/BHM | USHA ENTERPRISE | 12-04-2023 | 21-04-2023 | |
347 | BIRBHUM | KAYTHA WATER SUPPLY SCHEME | SM/00374 | SM/10319 | 1428/BHM | PRANAB KUMAR GHOSH | 25-04-2023 | 24-07-2023 |
348 | BIRBHUM | KAYTHA WATER SUPPLY SCHEME | SM/00374 | 138/BH | ENAMUL ISLAM | 19-08-2021 | 29-08-2021 | |
349 | BIRBHUM | KAYTHA WATER SUPPLY SCHEME | SM/00374 | SM/10319 | 1159/BHM | PRANAB KUMAR GHOSH | 23-05-2022 | 19-11-2022 |
350 | BIRBHUM | KAYTHA WATER SUPPLY SCHEME | SM/00374 | 126//BH | ENAMUL ISLAM | 04-08-2021 | 14-08-2021 | |
351 | BIRBHUM | KHAGRA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-II BLOCK UNDER BIRBHUM DISTRICT | SM/14676 | 2066/BHM | MALLICK CONSTRUCTION | 08-06-2023 | 17-06-2023 | |
352 | BIRBHUM | Khamedda Piped Water Supply Scheme | SM/13980 | 4163/BHM | M/S ASHA CONSTRUCTION | 30-10-2023 | 08-11-2023 | |
353 | BIRBHUM | Khanpur piped water supply scheme. | SM/13539 | 1425/BHM | BIPIN KUMAR SINGH | 25-04-2023 | 04-05-2023 | |
354 | BIRBHUM | Khanpur Piped Water Supply Scheme. | SM/14085 | 1344/BHM | M/S ELLIUS KHAN | 20-04-2023 | 29-04-2023 | |
355 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 203/BHM | BHAGYADHAR GHOSH | 18-02-2021 | 04-04-2021 |
356 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 1096/BHM | PRAVAT SARKAR | 07-07-2021 | 05-09-2021 |
357 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 266/BSSD | HIRANMAY GHOSH | 04-08-2021 | 24-08-2021 |
358 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 1476/BHM | NUR MOBINUL ISLAM | 06-09-2021 | 05-11-2021 |
359 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/10343 | 507/BHM | DIPAK SARKAR | 03-03-2022 | 17-04-2022 |
360 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 507/BHM | DIPAK SARKAR | 03-03-2022 | 17-04-2022 |
361 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/10343 | 1149/BHM | TIRUPATI ENTERPRISES | 23-05-2022 | 19-11-2022 |
362 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/06732 | 1157/BHM | M/S S.S. ENTERPRISE | 23-05-2022 | 19-11-2022 |
363 | BIRBHUM | Khoyrasole Water Supply Scheme | SM/02294 | SM/10343 | 3440/BHM | ARABINDA GUPTA | 03-08-2023 | 01-11-2023 |
364 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06947 | 1088 /BHM | BHAGYADHAR GHOSH | 05-09-2020 | 05-10-2020 |
365 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06947 | 31/BHM | MANAS KUMAR MONDAL | 13-01-2021 | 14-03-2021 |
366 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06741 | 1459/BHM | MS B N ENTERPRISES | 12-11-2020 | 11-01-2021 |
367 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06741 | 1422/BHM | INDRAJIT DAS | 04-11-2020 | 19-12-2020 |
368 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06947 | 1423/BHM | M/S KRIPASINDHU GHOSH & CO. | 04-11-2020 | 03-01-2021 |
369 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06741 | 1421/BHM | SYED HASMAT ALI | 04-11-2020 | 19-12-2020 |
370 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06947 | 2586/BHM | M/S.CHANDRANATH MUKHERJEE | 22-11-2022 | 22-12-2022 |
371 | BIRBHUM | Khujutipara Water Supply Scheme | SM/01417 | SM/06741 | 1460/BHM | MS BUILDWELL | 12-11-2020 | 27-12-2020 |
372 | BIRBHUM | KIRNAHAR WATER SUPPLY SCHEME | SM/00380 | SM/10320 | 648/BHM | M/S ASHA CONSTRUCTION | 25-03-2022 | 21-09-2022 |
373 | BIRBHUM | KIRNAHAR WATER SUPPLY SCHEME | SM/00380 | SM/10320 | 804/BHM | TEKNO ENTERPRISE | 12-04-2022 | 09-10-2022 |
374 | BIRBHUM | KOGRAM PIPED WATER SUPPLY SCHEME. | SM/12894 | 1059/BHM | SK ALIM | 31-03-2023 | 09-04-2023 | |
375 | BIRBHUM | Kot Piped Water Supply Scheme | SM/05924 | SM/07154 | 2059/BHM | SAPTADIP CONSTRUCTION | 08-06-2023 | 23-07-2023 |
376 | BIRBHUM | Kot Piped Water Supply Scheme | SM/05924 | SM/07154 | 1323/BHM | M/S GOUTAM DAS | 16-08-2021 | 15-10-2021 |
377 | BIRBHUM | Kot Piped Water Supply Scheme | SM/05924 | SM/07154 | 313/RSD | PROLOY KUMAR MONDAL | 18-08-2021 | 02-09-2021 |
378 | BIRBHUM | Kot Piped Water Supply Scheme | SM/05924 | SM/07154 | 314/RSD | PROLOY KUMAR MONDAL | 18-08-2021 | 02-09-2021 |
379 | BIRBHUM | Kot Piped Water Supply Scheme | SM/05924 | SM/12661 | 2059/BHM | SAPTADIP CONSTRUCTION | 08-06-2023 | 23-07-2023 |
380 | BIRBHUM | Kulara Piped Water Supply Scheme. | SM/12695 | 1098/BHM | M/S H. R. CONSTRUCTION | 06-04-2023 | 15-04-2023 | |
381 | BIRBHUM | KURUMBA PIPED WATER SUPPLY SCHEME | SM/14743 | 901/BHM | ESCON INDIA | 22-03-2023 | 31-03-2023 | |
382 | BIRBHUM | Kurumgram Water Supply Scheme | SM/02542 | SM/09491 | 2109/BHM | M/S MD AMINUL ISLAM | 17-12-2021 | 15-02-2022 |
383 | BIRBHUM | Kurumgram Water Supply Scheme | SM/02542 | SM/09491 | 1429/BHM | MD SURAJ ALI | 05-07-2022 | 03-09-2022 |
384 | BIRBHUM | Kurumsaha Piped Water Supply Scheme. | SM/13628 | 1245/BHM | BRAHMA CONSTRUCTION COMPANY | 17-04-2023 | 26-04-2023 | |
385 | BIRBHUM | KUSHIPUR PIPES WATER SUPPLY SCHEME. | SM/12599 | 1059/BHM | SK ALIM | 31-03-2023 | 09-04-2023 | |
386 | BIRBHUM | Kusumba Piped Water Supply Scheme. | SM/18362 | 2225/BHM | SUNIL RABI DAS | 12-08-2024 | 12-08-2025 | |
387 | BIRBHUM | LABHPUR WATER SUPPLY SCHEME | SM/00784 | SM/10320 | 335/BSD | NAZIR HOSSAIN | 06-09-2021 | 21-09-2021 |
388 | BIRBHUM | LABHPUR WATER SUPPLY SCHEME | SM/00784 | SM/10320 | 1028/BHM | ROY ENTERPRISE | 12-05-2022 | 08-11-2022 |
389 | BIRBHUM | LABHPUR WATER SUPPLY SCHEME | SM/00784 | SM/10320 | 71/BSD | ANKITA CHAKRABORTY | 03-03-2022 | 13-03-2022 |
390 | BIRBHUM | LABHPUR WATER SUPPLY SCHEME | SM/00784 | SM/10320 | 4165/BHM | SATYA NARAYAN ENGINEERS CO-OP SOCIETY LTD | 30-10-2023 | 28-01-2024 |
391 | BIRBHUM | Lachhiator Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division. | SM/14125 | 4142/BHM | B RAI CONSTRUCTION COMPANY | 19-10-2023 | 28-10-2023 | |
392 | BIRBHUM | Lakshminarayanpur Water Supply Scheme | SM/02329 | SM/10319 | 803/BHM | PASCON | 12-04-2022 | 09-10-2022 |
393 | BIRBHUM | Lakshminarayanpur Water Supply Scheme | SM/02329 | SM/10319 | 562/BHM | BELAL SK | 09-03-2022 | 08-05-2022 |
394 | BIRBHUM | Lakshminarayanpur Water Supply Scheme | SM/02329 | 4176/BHM | APURBA MONDAL | 31-10-2023 | 09-11-2023 | |
395 | BIRBHUM | Loba Piped Water Supply Scheme. | SM/18511 | 3476/BHM | B RAI CONSTRUCTION COMPANY | 08-08-2023 | 17-08-2023 | |
396 | BIRBHUM | LOHAPUR WATER SUPPLY SCHEME | SM/00097 | SM/10319 | 1151/BHM | SUNIL RABI DAS | 23-05-2022 | 19-11-2022 |
397 | BIRBHUM | LOHAPUR WATER SUPPLY SCHEME | SM/00097 | 259/BHM | SUNIL RABI DAS | 30-01-2023 | 30-05-2023 | |
398 | BIRBHUM | Madhupur Water Supply Scheme | SM/13644 | 4163/BHM | M/S ASHA CONSTRUCTION | 30-10-2023 | 08-11-2023 | |
399 | BIRBHUM | Madhura and Adjoining mouzas PWSS | SM/12671 | 1173/BHM | SK ABDUL HALIM | 12-04-2023 | 21-04-2023 | |
400 | BIRBHUM | MAHESWARPUR PIPED WATER SUPPLY SCHEME | SM/15254 | 1133/BHM | GUPTA CONSTRUCTION | 10-04-2023 | 19-04-2023 | |
401 | BIRBHUM | Mahurapur and Adjoining Mouzas PWSS | SM/12697 | 1424/BHM | SUPRITI ENTERPRISE | 25-04-2023 | 04-05-2023 | |
402 | BIRBHUM | Majhara piped water supply scheme | SM/12698 | 1301/BHM | M/S GHOSH AND CO. | 19-04-2023 | 28-04-2023 | |
403 | BIRBHUM | MAJHKALITHA PIPED WATER SUPPLY SCHEME. | SM/12838 | 1348/BHM | M/S GOUTAM DAS | 20-04-2023 | 29-04-2023 | |
404 | BIRBHUM | Majhkanda Piped Water Supply Scheme. | SM/14896 | 2226/BHM | SUNIL RABI DAS | 12-08-2024 | 12-08-2025 | |
405 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 278/BHM | APORUPA CONSTRUCTION | 09-02-2022 | 10-04-2022 |
406 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 281/BHM | BIJOY KUMAR CHOUDHURY | 09-02-2022 | 10-04-2022 |
407 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 1172/BHM | SOURAV MONDAL | 11-04-2023 | 26-04-2023 |
408 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 1452/BHM | APORUPA CONSTRUCTION | 07-07-2022 | 05-09-2022 |
409 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 1034/BHM | AATHARVA CONSTRUCTION | 15-03-2024 | 29-04-2024 |
410 | BIRBHUM | Maldanga Piped Water Supply Scheme | SM/05564 | SM/07532 | 923/BHM | SUBHRADIP SARKAR | 13-03-2024 | 27-04-2024 |
411 | BIRBHUM | MARGRAM WATER SUPPLY SCHEME | SM/00382 | SM/18372 | 2006/BHM | PROJECT INDIA , 38/A, KHELAT BABU LANE, KOLKATA - 700037. | 12-07-2024 | 12-07-2025 |
412 | BIRBHUM | MARGRAM WATER SUPPLY SCHEME | SM/00382 | SM/05491 | 1343/BHM | PULAK KUMAR PAL | 20-04-2023 | 19-07-2023 |
413 | BIRBHUM | Math Basori Piped Water Supply Scheme. | SM/13627 | 3019/BHM | SUNIL RABI DAS | 14-07-2023 | 23-07-2023 | |
414 | BIRBHUM | MATIARA PIPED WATER SUPPLY SCHEME. | SM/12674 | 1245/BHM | BRAHMA CONSTRUCTION COMPANY | 17-04-2023 | 26-04-2023 | |
415 | BIRBHUM | MATPALSA WATER SUPPLY SCHEME | SM/00375 | SM/10315 | 1160/BHM | APURBA MONDAL | 23-05-2022 | 19-11-2022 |
416 | BIRBHUM | MATPALSA WATER SUPPLY SCHEME | SM/00375 | SM/10315 | 2075/BHM | JAGADANANDAPUR CO-OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. | 08-06-2023 | 07-08-2023 |
417 | BIRBHUM | MAYURESWAR WATER SUPPLY SCHEME | SM/00373 | 315/RSD | M/S BUILDWELL | 18-08-2021 | 02-09-2021 | |
418 | BIRBHUM | MAYURESWAR WATER SUPPLY SCHEME | SM/00373 | SM/10321 | 1010/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 11-05-2022 | 07-11-2022 |
419 | BIRBHUM | Melanpur Piped Water Supply Scheme. | SM/12699 | 1340/BHM | BRAHMA CONSTRUCTION COMPANY | 20-04-2023 | 29-04-2023 | |
420 | BIRBHUM | Metegaon and Adjoining Mouzas PWSS | SM/12700 | 1085/BHM | M/S S.S. ENTERPRISE | 06-04-2023 | 15-04-2023 | |
421 | BIRBHUM | Modapa Piped Water Supply Scheme. | SM/13517 | 1303/BHM | J.P.ENTERPRISE | 19-04-2023 | 28-04-2023 | |
422 | BIRBHUM | MOHHAMAD BAZAR WATER SUPPLY SCHEME | SM/00782 | 316/RSD | SOIL STORY | 18-08-2021 | 02-09-2021 | |
423 | BIRBHUM | MOHHAMAD BAZAR WATER SUPPLY SCHEME | SM/00782 | 317/RSD | STP ENTERPRISE | 18-08-2021 | 02-09-2021 | |
424 | BIRBHUM | MOHHAMAD BAZAR WATER SUPPLY SCHEME | SM/00782 | SM/10321 | 859/BHM | M/S GOUTAM DAS | 20-04-2022 | 17-10-2022 |
425 | BIRBHUM | MOLLARPUR WATER SUPPLY SCHEME | SM/00377 | SM/10321 | 1010/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 11-05-2022 | 07-11-2022 |
426 | BIRBHUM | MOLLARPUR WATER SUPPLY SCHEME | SM/00377 | 314/RSD | PROLOY KUMAR MONDAL | 18-08-2021 | 02-09-2021 | |
427 | BIRBHUM | MOLLARPUR WATER SUPPLY SCHEME | SM/00377 | SM/10321 | 2246/BHM | M/S GOUTAM DAS | 17-10-2022 | 15-01-2023 |
428 | BIRBHUM | MOLLARPUR WATER SUPPLY SCHEME | SM/00377 | 313/RSD | PROLOY KUMAR MONDAL | 18-08-2021 | 02-09-2021 | |
429 | BIRBHUM | MOLLARPUR WATER SUPPLY SCHEME | SM/00377 | SM/10321 | 1027/BHM | S S ENTERPRISE | 12-05-2022 | 08-11-2022 |
430 | BIRBHUM | Monai Piped Water Supply Scheme. | SM/12701 | 1427/BHM | GHOSH ENTERPRISE | 25-04-2023 | 04-05-2023 | |
431 | BIRBHUM | Moubelia Piped Water Supply Scheme. | SM/14899 | 1182/BHM | M/S R B ENTERPRISE | 12-04-2023 | 21-04-2023 | |
432 | BIRBHUM | MURAROI WATER SUPPLY SCHEME | SM/00372 | SM/06948 | 424/AE/NSD | JOY CHAND MAL | 23-08-2021 | 07-09-2021 |
433 | BIRBHUM | MURAROI WATER SUPPLY SCHEME | SM/00372 | SM/10319 | 1722/BHM | M/S PROCHESTA ENTERPRISE | 12-05-2023 | 11-06-2023 |
434 | BIRBHUM | MURAROI WATER SUPPLY SCHEME | SM/00372 | SM/10319 | 2277/BHM | SK ALIM | 19-10-2022 | 31-10-2022 |
435 | BIRBHUM | MURAROI WATER SUPPLY SCHEME | SM/00372 | 145/BH | M/S S.N CONSTRUCTION | 07-09-2021 | 17-09-2021 | |
436 | BIRBHUM | MURAROI WATER SUPPLY SCHEME | SM/00372 | SM/10319 | 555/BHM | SK ALIM | 08-04-2022 | 05-10-2022 |
437 | BIRBHUM | Nabagram Piped Water Supply Scheme. | SM/13646 | 3522/BHM | SUNIL RABI DAS | 11-08-2023 | 20-08-2023 | |
438 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 1526/BHM | S R ENTERPRISE | 13-09-2021 | 12-11-2021 |
439 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 402/BSD | NAZIR HOSSAIN | 25-10-2021 | 04-11-2021 |
440 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 256/BHM | SUBHRADIP SARKAR | 26-02-2021 | 27-05-2021 |
441 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 2164/BHM | M/S.CHANDRANATH MUKHERJEE | 24-12-2021 | 22-02-2022 |
442 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 257/BHM | NAZIR HOSSAIN | 26-02-2021 | 12-04-2021 |
443 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 257/BHM | NAZIR HOSSAIN | 26-02-2021 | 12-04-2021 |
444 | BIRBHUM | Nachansaha and adj. mouzas Water Supply Scheme | SM/03116 | SM/07646 | 257/BHM | NAZIR HOSSAIN | 26-02-2021 | 12-04-2021 |
445 | BIRBHUM | NAGARI WATER SUPPLY SCHEME | SM/00383 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 | |
446 | BIRBHUM | NAGARI WATER SUPPLY SCHEME | SM/00383 | SM/10312 | 105/BHM | M/S KRIPASINDHU GHOSH & CO. | 11-01-2023 | 10-07-2023 |
447 | BIRBHUM | Naoadangal and Adjoining Mouzas PWSS | SM/12904 | 935/BHM | SYED KHORSED ALAM | 23-03-2023 | 01-04-2023 | |
448 | BIRBHUM | Narayanghati Piped Water Supply Scheme | SM/05919 | SM/13371 | 200/RSD | ASHUTOSH BISWAS | 28-07-2023 | 04-08-2023 |
449 | BIRBHUM | Narayanghati Piped Water Supply Scheme | SM/05919 | SM/06950 | 1915 /BHM | TAPAN KUMAR DATTA | 24-11-2021 | 23-01-2022 |
450 | BIRBHUM | Narayanghati Piped Water Supply Scheme | SM/05919 | SM/06743 | 1915/BHM | TAPAN KUMAR DATTA | 24-11-2021 | 23-01-2022 |
451 | BIRBHUM | Narayanghati Piped Water Supply Scheme | SM/05919 | SM/06950 | 315/RSD | M/S BUILDWELL | 18-08-2021 | 02-09-2021 |
452 | BIRBHUM | NARAYANPUR WATER SUPPLY SCHEME | SM/00870 | SM/06743 | 1426 / BHM | SUNIL RABI DAS | 04-11-2020 | 03-01-2021 |
453 | BIRBHUM | NARAYANPUR WATER SUPPLY SCHEME | SM/00870 | SM/06743 | 1469/BHM | SANJUKTA ENGINEERS | 12-11-2020 | 11-01-2021 |
454 | BIRBHUM | NARAYANPUR WATER SUPPLY SCHEME | SM/00870 | SM/06743 | 278/RSD | SHIB GANGA CONSTRUCTION | 16-07-2021 | 26-07-2021 |
455 | BIRBHUM | NETURI PIPED WATER SUPPLY SCHEME. | SM/12656 | 3441/BHM | SHREE J.M. CONSTRUCTION | 03-08-2023 | 12-08-2023 | |
456 | BIRBHUM | Nohana and Adjoining Mouzas PWSS | SM/12905 | 1643/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 02-05-2023 | 11-05-2023 | |
457 | BIRBHUM | Paduma Piped Water Supply Scheme. | SM/14544 | 1425/BHM | BIPIN KUMAR SINGH | 25-04-2023 | 04-05-2023 | |
458 | BIRBHUM | PAIKAR WATER SUPPLY SCHEME | SM/00786 | 507/AE/NSD | SHIB GANGA CONSTRUCTION | 01-10-2021 | 15-11-2021 | |
459 | BIRBHUM | PAIKAR WATER SUPPLY SCHEME | SM/00786 | SM/10319 | 1456/BHM | SK ALIM | 07-07-2022 | 03-01-2023 |
460 | BIRBHUM | Paikpara Piped Water Supply Scheme. | SM/12669 | 3441/BHM | SHREE J.M. CONSTRUCTION | 03-08-2023 | 12-08-2023 | |
461 | BIRBHUM | PAIKPARA WATER SUPPLY SCHEME. | SM/12836 | 1173/BHM | SK ABDUL HALIM | 12-04-2023 | 21-04-2023 | |
462 | BIRBHUM | PAKURIA PIPED WATER SUPPLY SCHEME. | SM/12596 | 3441/BHM | SHREE J.M. CONSTRUCTION | 03-08-2023 | 12-08-2023 | |
463 | BIRBHUM | Palsa piped water supply scheme. | SM/12906 | 1639/BHM | M/S GHOSH AND CO. | 02-05-2023 | 11-05-2023 | |
464 | BIRBHUM | PANCHIARA WATER SUPPLY SCHEME | SM/00794 | SM/10314 | 1161/BHM | M/S GOUTAM DAS | 23-05-2022 | 19-11-2022 |
465 | BIRBHUM | PANCHIARA WATER SUPPLY SCHEME | SM/00794 | 381/BSSD | RANJIT GHOSH | 10-12-2021 | 30-12-2021 | |
466 | BIRBHUM | Panchra Piped Water Supply Scheme | SM/06333 | SM/09490 | 1095/BHM | MANASH GHOSH | 06-04-2023 | 05-07-2023 |
467 | BIRBHUM | Paratpur Piped Water Supply Scheme. | SM/13474 | 3476/BHM | B RAI CONSTRUCTION COMPANY | 08-08-2023 | 17-08-2023 | |
468 | BIRBHUM | PARKUTA PIPED WATER SUPPLY SCHEME | SM/14959 | 1341/BHM | KAZI EMDADUL HAQUE | 20-04-2023 | 26-04-2023 | |
469 | BIRBHUM | PARULIA PIPED WATER SUPPLY SCHEME. | SM/14538 | 1425/BHM | BIPIN KUMAR SINGH | 25-04-2023 | 04-05-2023 | |
470 | BIRBHUM | Paschim Naopara and Adjoining Mouzas PWSS | SM/12458 | 2262/BHM | B RAI CONSTRUCTION COMPANY | 12-07-2023 | 21-07-2023 | |
471 | BIRBHUM | PATHAR CHAPRI WATER SUPPLY SCHEME | SM/00385 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 | |
472 | BIRBHUM | PHULUR PIPED WATER SUPPLY SCHEME. | SM/12901 | 2262/BHM | B RAI CONSTRUCTION COMPANY | 12-07-2023 | 21-07-2023 | |
473 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06943 | 382/BSSD | SUBHANKAR ROY | 10-12-2021 | 30-12-2021 |
474 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 946/BHM | ASIT GHOSH | 12-08-2020 | 11-09-2020 |
475 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06943 | 264/BSSD | PRADIP KUMAR SHARMA | 04-08-2021 | 24-08-2021 |
476 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 947/BHM | PRADIP KUMAR SHARMA | 12-08-2020 | |
477 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 1236/BHM | RAJ KUMAR DAS | 28-09-2020 | 12-11-2020 |
478 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 945/BHM | PRANAB KUMAR GHOSH | 12-08-2020 | 11-09-2020 |
479 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 1168 /BHM | M/S GOUTAM DAS | 21-09-2020 | 20-11-2020 |
480 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06733 | 1237 /BHM | S R ENTERPRISE | 28-09-2020 | 12-11-2020 |
481 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/12637 | 2272/BHM | PARTHA PRATIM ACHARYYA | 13-07-2023 | 27-08-2023 |
482 | BIRBHUM | Piped Water Supply Scheme for Aligarh and adjoining mouzas | SM/03786 | SM/06943 | 1167 /BHM | M/S KRIPASINDHU GHOSH & CO. | 21-09-2020 | 20-11-2020 |
483 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 71/BSSD | SYED KHORSID ALAM | 26-02-2021 | 13-03-2021 |
484 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 263/BSSD | PRAVAT SARKAR | 04-08-2021 | 24-08-2021 |
485 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 1174/BHM | SYED KHORSID ALAM | 21-09-2020 | 20-11-2020 |
486 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 1282/BHM | ISLAM CONSTRUCTION | 01-10-2020 | 15-11-2020 |
487 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 1281/BHM | NUR MOBINUL ISLAM | 01-10-2020 | 15-11-2020 |
488 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 942/BHM | INDRAJIT DUTTA. | 12-08-2020 | |
489 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 1173/BHM | PRAVAT SARKAR | 21-09-2020 | 20-11-2020 |
490 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 91/BSSD | INDRAJIT MONDAL | 27-05-2022 | 16-06-2022 |
491 | BIRBHUM | Piped water supply scheme for Chatra - Koma and adjoining mouzas (To cover Fluoride affected areas) | SM/04001 | SM/06735 | 943/BHM | BHABATARAN SADHU | 12-08-2020 | 11-09-2020 |
492 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 06/BSSD | INDRANIL DUTTA | 17-01-2022 | 06-02-2022 |
493 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1820/BHM | MD. HASIN | 03-11-2021 | 02-01-2022 |
494 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 2652/BHM | AVIJIT CHANDA | 01-12-2022 | 15-01-2023 |
495 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 2218/BHM | THREE MAA ENTERPRISE | 13-10-2022 | 12-12-2022 |
496 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1063/BHM | SYED KHORSID ALAM | 13-05-2022 | 12-07-2022 |
497 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1062/BHM | APURBA MONDAL | 13-05-2022 | 12-07-2022 |
498 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1039/BHM | PRONAB KUMAR DEY | 15-03-2024 | 14-04-2024 |
499 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1037/BHM | M/S C.P. CONCERN | 15-03-2024 | 29-04-2024 |
500 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 924/BHM | M/S K.S. GHOSH | 13-03-2024 | 27-04-2024 |
501 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1043/BHM | ANIRUDDHA FARUQUE | 15-03-2024 | 29-04-2024 |
502 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 05/BSSD | PUSPAJIT MONDAL | 17-01-2022 | 06-02-2022 |
503 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1851/BHM | SAKTI ENTERPRISE | 09-11-2021 | 08-01-2022 |
504 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1774/BHM | M/S KRIPASINDHU GHOSH & CO. | 29-10-2021 | 28-12-2021 |
505 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1772/BHM | PRANAB KUMAR GHOSH | 29-10-2021 | 28-12-2021 |
506 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 400/BSSD | SUBHRADIP SARKAR | 14-12-2021 | 03-01-2022 |
507 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 07/BSSD | PRANAB KUMAR MONDAL | 17-01-2022 | 06-02-2022 |
508 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 2170/BHM | M/S BUILDWELL | 28-12-2021 | 26-02-2022 |
509 | BIRBHUM | Piped Water Supply Scheme for Fluoride Affected Mouzas under Suri-I, Suri-II & Sainthia Block | SM/05432 | SM/08286 | 1773/BHM | M/S GOUTAM DAS | 28-10-2021 | 27-12-2021 |
510 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 89/BSSD | SK FAQHRUL AMIN | 27-05-2022 | 16-06-2022 |
511 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 285/BSSD | B.M.SARKAR | 13-08-2021 | 12-09-2021 |
512 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 206 /BSSD | SUMEN CHOWDHURY | 15-06-2021 | 15-07-2021 |
513 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 207/BSSD | RICK CONSTRUCTION | 15-06-2021 | 15-07-2021 |
514 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 1709/BHM | RICK CONSTRUCTION | 23-12-2020 | 21-02-2021 |
515 | BIRBHUM | Piped Water Supply Scheme for Jamrand & Adj. Mouzas | SM/03572 | SM/06736 | 1708 /BHM | PRAVAT SARKAR | 23-12-2020 | 21-02-2021 |
516 | BIRBHUM | Piped Water Supply Scheme for Khedamara Mouza (Paikpara Village) under Rampurhat -I Block within Birbhum District | SM/14016 | 2689/BHM | M/S MD AMINUL ISLAM | 06-12-2022 | 04-02-2023 | |
517 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 199/BSSD | B.M.SARKAR | 15-06-2021 | 15-07-2021 |
518 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 198/BSSD | DIPAK SARKAR | 15-06-2021 | 15-07-2021 |
519 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 203/BSSD | SACHIN KUMAR SARKAR | 15-06-2021 | 15-07-2021 |
520 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 200/BSSD | BHABATARAN SADHU | 15-06-2021 | 15-07-2021 |
521 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 2166/BHM | RICK CONSTRUCTION | 24-12-2021 | 22-02-2022 |
522 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 202/BSSD | ARKA JYOTI GHOSH | 15-06-2021 | 15-07-2021 |
523 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 212/BSSD | GOUTAM MONDAL | 15-06-2021 | 15-07-2021 |
524 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/18783 | 3895/BHM | HIRANMAY GHOSH | 21-09-2023 | 20-11-2023 |
525 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 2587/BHM | HIRANMAY GHOSH | 22-11-2022 | 21-01-2023 |
526 | BIRBHUM | Piped Water Supply Scheme for Rasa & Adjoining Mouzas | SM/03762 | SM/07651 | 201 /BSSD | ASIT GHOSH | 15-06-2021 | 15-07-2021 |
527 | BIRBHUM | Podda Piped Water Supply Scheme | SM/13714 | 1310/BHM | P. C. CONSTRUCTION | 19-04-2023 | 28-04-2023 | |
528 | BIRBHUM | Prayagpur Piped Water Supply Scheme under Mayureswar-II Block Within Birbhum Division | SM/14088 | 3596/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 21-08-2023 | 30-08-2023 | |
529 | BIRBHUM | Puranagram Piped Water Supply Scheme | SM/05553 | SM/12659 | 3453/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 03-08-2023 | 01-11-2023 |
530 | BIRBHUM | PURANDARPUR WATER SUPPLY SCHEME | SM/00096 | SM/09437 | 1026/BHM | M/S GOUTAM DAS | 12-05-2022 | 08-11-2022 |
531 | BIRBHUM | Purba Anantapur Piped Water Supply Scheme | SM/13715 | 1193/BHM | MEHEBUB RAHAMAN | 12-04-2023 | 21-04-2023 | |
532 | BIRBHUM | PURBA BANKATI PIPED WATER SUPPLY SCHEME. | SM/13470 | 675/BHM | MUKHERJEE ENTERPRISE | 01-03-2023 | 10-03-2023 | |
533 | BIRBHUM | PURBA SIUR PIPED WATER SUPPLY SCHEME. | SM/12598 | 2262/BHM | B RAI CONSTRUCTION COMPANY | 12-07-2023 | 21-07-2023 | |
534 | BIRBHUM | RAGHABPUR PIPED WATER SUPPLY SCHEME | SM/14747 | 899/BHM | M/S.KHAN CHOWDHURY BROTHERS AND CO. | 22-03-2023 | 31-03-2023 | |
535 | BIRBHUM | Raghunathpur Piped Water Supply Scheme | SM/05023 | SM/07533 | 1507/BHM | M/S MD AMINUL ISLAM | 09-09-2021 | 08-11-2021 |
536 | BIRBHUM | Raghunathpur Piped Water Supply Scheme | SM/05023 | SM/07533 | 143/BHM | G. B. CONSTRUCTION AND CO. | 05-02-2021 | 06-04-2021 |
537 | BIRBHUM | Raghunathpur Piped Water Supply Scheme | SM/05023 | SM/13372 | 875/BHM | DUBE ENTERPRISE | 21-03-2023 | 04-06-2023 |
538 | BIRBHUM | Raghunathpur Piped Water Supply Scheme | SM/05023 | SM/07533 | 607/AE/NSD | ENAMUL ISLAM | 26-11-2021 | 10-01-2022 |
539 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | 311/AE/NSD | MD ASIF ALI | 29-05-2021 | 13-06-2021 | |
540 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | SM/10319 | 647 /BHM | MANASH GHOSH | 25-03-2022 | 21-09-2022 |
541 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | SM/10319 | 1246/BHM | MANASH GHOSH | 17-04-2023 | 16-07-2023 |
542 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | 592/AE/NSD | MD ASIF ALI | 23-11-2021 | 07-01-2022 | |
543 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | SM/10319 | 562/BHM | BELAL SK | 09-03-2022 | 08-05-2022 |
544 | BIRBHUM | RAJGRAM WATER SUPPLY SCHEME | SM/00787 | SM/10319 | 550/BHM | S P CONSTRUCTION | 07-03-2022 | 03-09-2022 |
545 | BIRBHUM | RAJNAGAR WATER SUPPLY SCHEME | SM/00606 | SM/09438 | 1876/BHM | OM ENTERPRISE | 31-05-2023 | 30-07-2023 |
546 | BIRBHUM | RAJNAGAR WATER SUPPLY SCHEME | SM/00606 | 382/BSSD | SUBHANKAR ROY | 10-12-2021 | 30-12-2021 | |
547 | BIRBHUM | RAJNAGAR WATER SUPPLY SCHEME | SM/00606 | SM/09438 | 94/BHM | UJJWAL DAS | 21-01-2022 | 20-07-2022 |
548 | BIRBHUM | Rajpur Piped Water Supply Scheme | SM/14026 | 1346/BHM | MUSKAN ENTERPRISE | 20-04-2023 | 29-04-2023 | |
549 | BIRBHUM | Ramnagar Piped Water Supply Scheme under Mayureswar-II Block within Birbhum Division. | SM/16373 | 903/BHM | M/S.SUMAN CONSTRUCTION | 22-03-2023 | 31-03-2023 | |
550 | BIRBHUM | RAUTARA PIPED WATER SUPPLY SCHEME. | SM/12888 | 900/BHM | M/S.KHAN CHOWDHURY BROTHERS AND CO. | 22-03-2023 | 31-03-2023 | |
551 | BIRBHUM | RAUTGARA PIPED WATER SUPPLY SCHEME OF MAYURESWAR-I BLOCK UNDER BIRBHUM DISTRICT | SM/14894 | 902/BHM | PULAK KUMAR PAL | 22-03-2023 | 31-03-2023 | |
552 | BIRBHUM | Raypur Piped Water Supply Scheme | SM/05938 | SM/07649 | 279/BHM | PRADIP KUMAR SHARMA | 09-02-2022 | 10-04-2022 |
553 | BIRBHUM | Raypur Piped Water Supply Scheme | SM/05938 | SM/07649 | 317/RSD | STP ENTERPRISE | 18-08-2021 | 02-09-2021 |
554 | BIRBHUM | Raypur Piped Water Supply Scheme | SM/05938 | SM/07649 | 24/BHM | SK ALIM | 06-01-2022 | 07-03-2022 |
555 | BIRBHUM | Raypur Piped Water Supply Scheme | SM/05938 | SM/07649 | 316/RSD | SOIL STORY | 18-08-2021 | 02-09-2021 |
556 | BIRBHUM | Sadanandapur piped water supply scheme. | SM/13648 | 2019/BHM | NABIN DEBNATH | 06-06-2023 | 15-06-2023 | |
557 | BIRBHUM | Sadasibpur (Bisor) Piped Water Supply Scheme | SM/06310 | SM/09366 | 822/BHM | QUAZI SIRAJUL ISLAM. | 13-04-2022 | 12-06-2022 |
558 | BIRBHUM | Sadasibpur (Bisor) Piped Water Supply Scheme | SM/06310 | SM/13373 | 2857/BHM | SUPER SKILL | 22-12-2022 | 20-06-2023 |
559 | BIRBHUM | Sahapur Piped water Supply Scheme. | SM/13649 | 3522/BHM | SUNIL RABI DAS | 11-08-2023 | 20-08-2023 | |
560 | BIRBHUM | SAMSA PIPED WATER SUPPLY SCHEME. | SM/12597 | 1437/BHM | ASHOK KUMAR GHOSH | 25-04-2023 | 04-05-2023 | |
561 | BIRBHUM | Sandhyajol Piped Water Supply Scheme | SM/13981 | 2224/BHM | SUNIL RABI DAS | 12-08-2024 | 12-08-2025 | |
562 | BIRBHUM | SARIHA PIPED WATER SUPPLY SCHEME | SM/12900 | 1348/BHM | M/S GOUTAM DAS | 20-04-2023 | 29-04-2023 | |
563 | BIRBHUM | Satpalsa Piped Water Supply Scheme Under Mayureswar-II Block Within Birbhum Division | SM/13982 | 4135/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 18-10-2023 | 27-10-2023 | |
564 | BIRBHUM | Sekhpur Piped Water Supply Scheme | SM/06266 | SM/09363 | 1611/BHM | M/S KRIPASINDHU GHOSH & CO. | 28-07-2022 | 26-09-2022 |
565 | BIRBHUM | Shankarpur Piped Water Scheme | SM/14082 | 1094/BHM | SYED GOLAM ZILANI | 06-04-2023 | 15-04-2023 | |
566 | BIRBHUM | Shaspur Piped Water Supply Scheme. | SM/13651 | 3522/BHM | SUNIL RABI DAS | 11-08-2023 | 20-08-2023 | |
567 | BIRBHUM | Shibgram Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division. | SM/13476 | 4142/BHM | B RAI CONSTRUCTION COMPANY | 19-10-2023 | 28-10-2023 | |
568 | BIRBHUM | Shitalgram Piped Water Supply Scheme | SM/14087 | 3236/BHM | MS S CHOUDHURY | 25-07-2023 | 03-08-2023 | |
569 | BIRBHUM | SHRICHANDRAPUR PIPED WATER SUPPLY SCHEME | SM/13516 | 1345/BHM | RADHARANI ENTERPRISE | 20-04-2023 | 26-04-2023 | |
570 | BIRBHUM | Simgram Piped Water Supply Scheme. | SM/12908 | 1719/BHM | M/S MD AMINUL ISLAM | 12-05-2023 | 18-05-2023 | |
571 | BIRBHUM | Siur Piped Water Supply Scheme. | SM/14537 | 1440/BHM | MUKHERJEE CONSTRUCTION | 25-04-2023 | 04-05-2023 | |
572 | BIRBHUM | Sonj Piped Water Supply Scheme under Mayureswar-I within Birbhum Division | SM/13630 | 4142/BHM | B RAI CONSTRUCTION COMPANY | 19-10-2023 | 28-10-2023 | |
573 | BIRBHUM | Sultanpur Piped Water Supply Scheme Under Mayureswar -II Block Within Birbhum Division | SM/14160 | 2065/BHM | M/S.SUMAN CONSTRUCTION | 08-06-2023 | 17-06-2023 | |
574 | BIRBHUM | Taloan Piped Water Supply Scheme under Mayureswar-I Block within Birbhum Division. | SM/13653 | 601/BHM | PRALAY ROY | 09-02-2024 | 18-02-2024 | |
575 | BIRBHUM | TARAPITH TEMPLE WATER SUPPLY SCHEME | SM/01128 | SM/05636 | 3623/BHM | UTPAL DEY | 24-08-2023 | 23-10-2023 |
576 | BIRBHUM | TARAPITH TEMPLE WATER SUPPLY SCHEME | SM/01128 | SM/05636 | 286/BHM | WEIR AND DECK CONSTRUCTION ENGINEERS CO OP SOCIETY LTD | 01-02-2023 | 18-03-2023 |
577 | BIRBHUM | TEJHATI WATER SUPPLY SCHEME | SM/00370 | SM/10166 | 3653/BHM | QUAZI SIRAJUL ISLAM. | 25-08-2023 | 24-10-2023 |
578 | BIRBHUM | TEJHATI WATER SUPPLY SCHEME | SM/00370 | SM/10166 | 1150/BHM | QUAZI SIRAJUL ISLAM. | 23-05-2022 | 19-11-2022 |
579 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 262/BSSD | M/S SARADA CONSTRUCTION. | 20-10-2022 | 09-11-2022 |
580 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 1506/BHM | RAJKUMAR DAS | 09-09-2021 | 08-11-2021 |
581 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 909/BHM | RAJKUMAR DAS | 13-03-2024 | 27-04-2024 |
582 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/06734 | 191/BSSD | BAMDEB CONSTRUCTION | 02-06-2021 | 22-06-2021 |
583 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/06734 | 1420/BHM | B.M.SARKAR | 04-11-2020 | 19-12-2020 |
584 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 353/BSSD | SACHIN KUMAR SARKAR | 25-10-2021 | 14-11-2021 |
585 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/06734 | 265/BSSD | M/S C.P. CONCERN | 04-08-2021 | 24-08-2021 |
586 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/06734 | 336/BSSD | M/S SARADA CONSTRUCTION. | 23-09-2021 | 13-10-2021 |
587 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 380/BSSD | AATHARVA CONSTRUCTION | 10-12-2021 | 30-12-2021 |
588 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 167/BSSD | SACHIN KUMAR SARKAR | 16-08-2022 | 05-09-2022 |
589 | BIRBHUM | Tilpara w/s scheme | SM/02624 | SM/08892 | 90/BSSD | RAJKUMAR DAS | 27-05-2022 | 16-06-2022 |
590 | BIRBHUM | Tilutia (Zone-I & II) Piped Water Supply Scheme | SM/06335 | SM/09362 | 665/BHM | INDRAJIT DAS | 28-02-2023 | 14-04-2023 |
591 | BIRBHUM | Tilutia (Zone-I & II) Piped Water Supply Scheme | SM/06335 | SM/09362 | 1476/BHM | RAJKUMAR DAS | 12-07-2022 | 10-09-2022 |
592 | BIRBHUM | Tilutia (Zone-I & II) Piped Water Supply Scheme | SM/06335 | SM/09362 | 2245/BHM | MANAS KUMAR MONDAL | 17-10-2022 | 16-12-2022 |
593 | BIRBHUM | TINOR WATER SUPPLY SCHEME | SM/00790 | SM/10320 | 556/BHM | G.D. CONSTRUCTION & CO | 08-03-2022 | 04-09-2022 |
594 | BIRBHUM | UTTAR BANGAON PIPED WATER SUPPLY SCHEME. | SM/13626 | 1437/BHM | ASHOK KUMAR GHOSH | 25-04-2023 | 04-05-2023 | |
Total |